ServiceNow Change Types: Standard, Normal and Emergency

ServiceNow change management types are the categories that decide which state model and change process a requested change follows, including its approval and review path. Change Management uses three types: standard, normal and emergency. A standard change runs under a pre-agreed template because it is low risk and repeats the same steps, a normal change goes through full assessment, and an emergency change is fast-tracked to restore service and goes straight to CAB authorization, bypassing group and peer review.

Why the type matters more than the label

The change type on a change record determines which state model and change process the request follows, and whether it needs a review board. Change models are based on the change types, and the default change model in your instance can override the type a copied change receives, so check how your instance is set up. Teams that pick types loosely run into two common problems. Routine patches end up queued behind major upgrades, or risky work slips through as a quick change because nobody stopped to check it. Both come from configuration and habit, and both are fixable.

Exact approval routing depends on how your instance is configured, including your change model and approval rules. Two organizations running the same release can route approvals very differently, so confirm how each type behaves in your own setup before you rely on it.

Comparing the three types side by side

Change type Approval before work starts Review board (CAB) involvement Typical use
Standard Pre-approved through a template the Change Management team has approved Usually not needed for each request Repeatable, low-risk work with a known procedure, such as routine patching
Normal Full assessment and approval for each request Required Planned upgrades, new configurations and anything with real impact on users
Emergency Fast-tracked and sent straight to CAB authorization, without group or peer review Required, going straight to the Authorize state Work needed to restore a failed service or contain an active security issue

What makes a change eligible to be standard

A change qualifies as standard when it is low risk, frequently implemented, has repeatable steps and a proven history of success, and the Change Management team has approved it as a standard change in advance. The template does the heavy lifting. Its steps follow a specified procedure or work instruction. When a team wants to run that work again, it raises a request from the template instead of writing a new plan from scratch.

The common mistake is calling a one-off job standard because it feels routine. If the steps change each time, or the back-out depends on who happens to be on shift, the work belongs in normal. Review each template on a schedule, and check it again after a platform upgrade.

Proposing a new standard template from a real change request

A new standard template starts as a proposal, and no change request can use it until the Change Management team approves it. Submit it on the Standard Change Proposal form, which records the category, configuration item, assignment fields and the fixed values that later requests from the template will carry.

Starting from a real change can be quicker. Open the change, choose Propose a Standard Change Template from the form context menu, then check the copied values, since copied fields can carry into later requests raised from the template.

Retiring a template instead of editing it

Retiring a template deactivates it, so it can no longer be used to create change requests. The retire form asks for a business justification, which puts the reason on the record. Retirement usually fits when the procedure itself is gone, rather than when one detail has moved.

Save and Request Approval do different things when you change a template. Save keeps the edits without sending them for review, and Request Approval sends them to the change management team.

When template edits take effect

Once an edit is approved, the new template version applies to change requests raised after that point. The Assignment group and Assigned to fields follow the same rule, so a change to them on the template does not apply to requests already open. Schedule edits with that in mind, especially when a team handover is due.

Before you request approval on an edit, check the sign-off roles in the change enablement governance model, so the review does not stall.

Scheduling normal changes around blackout windows

Normal changes carry most of the scheduling work. The assessment has to show the risk, the people affected and the time needed to roll back. Many teams also keep blackout windows, periods such as month-end close or a major sales event when no non-urgent change should land. Set those windows under Change > Schedules > Blackout Schedules before requests arrive, not after someone has booked a database move for the last working day of the quarter. Teams that want a wider view of how scheduling, governance and release planning fit together can look at our change governance and release planning work.

Lead time is the other constraint. If approvers meet on a fixed cycle, a normal change that misses the cut-off waits a full round. Plan backwards from the window you want, and treat the approval date as part of the work rather than an afterthought.

Handling emergency changes without losing the audit trail

An emergency change exists for work that cannot wait for the normal cycle, usually because a service is down or a security issue is live. The mistake is treating the emergency path as a way around approval altogether. The change still needs a record, a named implementer and a clear statement of what was altered. If your team struggles to keep that discipline under pressure, a change management advisory review is one way to look at where the process bends.

The review after the event matters as much as the rush. Within a short window after the work, the approver should check whether the fix held and whether the change belonged in a different type. Any unplanned configuration made under pressure should be written up before the record closes. Otherwise the next person troubleshooting that system has no idea it was altered, and that is how small emergency fixes become long-running mysteries.

A decision flow for picking the right type

Work through four questions in order. First, is the work restoring a service or containing a live threat? If yes, it is an emergency change, and the paperwork is completed as soon as the work is done. Second, has this exact procedure, with the same back-out, already run and been approved as a template? If yes, use standard. Third, does the change carry meaningful risk to users or data? If yes, it goes normal, and the planner checks blackout windows and approver calendars. Fourth, if the answer is still unclear, default to normal. A normal change costs time. A wrongly labeled standard change can bypass the review that the work needs.

The full range of change enablement guides on this site covers how each step connects to the rest of the ITSM process, and the ServiceNow change enablement hub is the best starting point if you are setting this up from scratch.

Frequently asked questions about ServiceNow change types

Which change type fits a scheduled upgrade?

A scheduled upgrade is normally a normal change. It touches several systems, has a real rollback question and usually needs a dedicated window. Standard fits when you have a tested template for that exact upgrade path, and a one-off upgrade usually lacks the repetition a template needs.

Can a standard change template be edited after it is approved?

Yes. Once an edit is approved, a new template version is created, and later requests raised from the template reflect it. Steps, back-out and risk statements should go through the owner again before the edit goes live. Otherwise a request raised from the template may be running a procedure nobody has actually signed off.

What should I do when I cannot tell if a change is urgent?

Ask the requester what happens if the change waits one normal approval cycle. If the honest answer is that a service stays down or a threat stays active, it is an emergency. If the answer is that users are inconvenienced, it is a normal change with a tighter date.

How do you add a custom change type?

Custom change types are possible in ServiceNow, but a new type changes which state model and change process a request follows, so it is not a cosmetic change. Confirm the steps against your own instance and release, since menu paths differ between versions, and test the approval routing with a sample record before the type goes live. If you want help deciding whether a new type is worth the added maintenance, read this guide to choosing between consulting and managed support.