OBLYTECH Logo
OBLYTECH Logo

SAP Technical Services

Introduction to SAP Technical Services

SAP systems need ongoing technical support, development, and optimization as business requirements change. At Oblytech, we work on SAP Technical Services, helping enterprises improve their SAP environments through custom developments, integrations, and performance improvements.

Our SAP technical team builds solutions for specific requirements, from SAP ABAP programming to cloud migrations, with the aim of keeping your business operating efficiently and securely.

Team of diverse specialists review monthly cost and revenue elements

Why Choose Oblytech for SAP Technical Services?

Our SAP Technical Services

Phase 1: SAP Development & Enhancements

ABAP Development & Custom Programming

  • Develop custom SAP applications and business logic enhancements.
  • Automate business processes through SAP ABAP Workflows.
  • Implement custom BAPIs, BADIs, and user exits for smooth integrations.

SAP Fiori & UI5 Development

  • Design and develop responsive SAP Fiori apps for improved user experience.
  • Enhance UI/UX with modern SAP UI5 interfaces.
  • Integrate Fiori applications with SAP S/4HANA and legacy systems.
Phase 2: SAP System Integration & Middleware Solutions

SAP Integration with Third-Party Applications

  • Connect SAP with CRM, HR, financial systems, and cloud platforms.
  • Establish real-time data exchange through SAP Process Integration (SAP PI/PO) and SAP Cloud Platform Integration (CPI).
  • Implement API-driven integrations for enhanced cross-platform functionality.

Data Migration & ETL Solutions

  • Design and implement data migration strategies for smooth SAP adoption.
  • Utilize SAP Data Services (BODS) and ETL tools for optimized data transfers.
  • Ensure data consistency, validation, and security across all systems.
Phase 3: SAP Basis Administration & System Management

SAP Landscape Management & Security

  • Monitor and maintain SAP environments, ensuring high availability and disaster recovery readiness.
  • Implement SAP security best practices, including role-based access control (RBAC) and GRC compliance.
  • Optimize SAP HANA and NetWeaver architectures for stability and performance.

SAP Cloud & Hybrid Deployments

  • Migrate SAP workloads to AWS, Azure, and Google Cloud.
  • Establish hybrid SAP environments with flexible cloud-to-on-premise connectivity.
  • Optimize cloud-based SAP deployments for cost savings and scalability.
Phase 4: Performance Optimization & Automation

SAP Performance Tuning

  • Enhance SAP HANA and database performance with tuning and indexing.
  • Optimize ABAP programs and SQL queries to reduce system load.
  • Conduct stress testing and performance audits for ongoing improvements.

SAP Process Automation & AI Integration

  • Automate manual workflows with SAP Intelligent Robotic Process Automation (SAP IRPA).
  • Integrate AI/ML-driven analytics for predictive business insights.
  • Implement IoT solutions for real-time operational data collection.
Phase 5: Continuous Support & Lifecycle Management

SAP Technical Support & Troubleshooting

  • Provide technical assistance to resolve system issues.
  • Conduct root cause analysis (RCA) and proactive system monitoring.
  • Ensure patch management, upgrades, and version control.

SAP Upgrade & Future Roadmap Planning

  • Assist in SAP ECC to S/4HANA migrations.
  • Develop a strategic roadmap for future SAP upgrades and innovations.
  • Implement SAP best practices for system stability and scalability.

Matching a technical backlog item to the right kind of work

Technical SAP work comes in a few recognizable shapes, and most buyers already have one of them on a list: a custom report nobody can maintain, an interface that fails overnight, a Fiori app users have asked for, a database that slows every month-end, or a move of workloads to a cloud platform. The reader is usually the SAP lead or IT director, and the question is which technical capability to commission and how to make sure the result can be maintained. This page sets out how to frame those items so a provider can price and staff them sensibly, without assuming one technical team is equally strong at all of them.

Backlog itemWork involvedWhat the buyer must hand overWhat to verify at acceptance
Custom report or program that is slow or unmaintainedAnalysis of existing code, redesign, performance checkCurrent code, the users who rely on it and sample outputsOutput matches the old report for agreed test data
Interface that fails or needs a new partner systemMapping, error handling, monitoring setupInterface specification from the partner and a named error ownerFailure and retry paths tested with a real error
Fiori or UI5 applicationDesign, build, authorization setupUser tasks, roles and the data each role needsRole-based access tested with a user from each role
Performance problem in a processTrace analysis, index or code tuningTimings before and after, and the workload profileThe same workload runs faster in the test system
Workload move to a cloud platformSizing, migration runbook, cutover rehearsalInventory of systems and the owner of eachA rehearsed cutover with a tested return path

The table is useful because it shows what each item asks of the buyer. A provider that cannot describe the handover artifacts for a given item has not yet understood the work.

What good custom development looks like after the first release

Custom development is easy to start and expensive to own. The first release of a custom program or extension is rarely the costly part. The cost arrives in later years, when a business rule changes, an upgrade removes a function the code depended on, or the original developer is no longer available. Good practice is to document the purpose of each object, keep it inside a version-controlled transport route, review changes before they move, and prefer standard extension points over modifications of standard code. Where a custom object supports a process that will change, the design should keep the change local rather than spread it through the system.

Enhancements built on documented extension points generally survive upgrades more easily than modifications, though each still needs testing against a new release. A buyer should ask how the provider decides between the two, and what evidence it will provide for the choice.

Integration and middleware work needs an owner on each side

An interface is a contract between two systems, and many interface failures happen because one side changed without telling the other. The technical service should define the message format, frequency, error handling and owner on each side before build starts. Where the interface runs through a middleware layer, that layer’s monitoring belongs in the handover, so an operations team can see a failed message without opening a developer tool.

Data movement is a related but separate item. Migrating or synchronizing data needs its own validation, reconciliation and rollback steps, and should not be bundled into an interface build without a separate test plan.

Basis work is continuous, not a one-off task

Basis administration covers the platforms the SAP applications run on: database maintenance, memory and performance monitoring, backup and restore, user and authorization administration and the transport system. It is continuous work. A buyer should separate one-off tasks, such as an installation or a kernel update, from the routine tasks that keep the system stable. Routine tasks belong in a checklist with a frequency and an owner. One-off tasks belong in a project with a plan.

Performance tuning sits between basis and development. A slow process may be caused by the database, by a custom program or by a configuration choice. The first job is to find which one using trace data, rather than changing code and hoping.

Questions to ask before commissioning technical work

Who will own the code after the engagement?

Name the internal owner for each custom object and each interface before work begins. If no internal owner is available, the engagement should include a training step, not only a handover document.

How will the work be tested in a system that resembles production?

Ask which environment will be used, how test data is prepared and whether it is refreshed from production under the agreed data rules.

What is the process for an emergency change?

Ask whether the provider keeps a record made at the time of the change, and whether that record is reviewed afterwards. The answer tells you more than a description of the route.

Can the provider work alongside our internal developers?

Many providers can. The arrangement works best when internal developers review the code and the provider documents its decisions in a form they can read.

How transports and release discipline protect custom work

A good deal of the damage done to custom code can happen in transport, not in development. A correction moved straight into production, a transport that carries an unreviewed object, or a production fix that is never copied back to the development system all create a gap between what the team believes is running and what is actually running. The discipline that prevents this is simple to state and tedious to keep: every change follows the same route, every route leaves a record, and every production move carries an approval naming the person who accepted the risk.

Release pipelines help once the team is large enough to need them. Source control for custom objects, automated checks before a transport is released and a consistent naming convention for transports all reduce the manual steps that can go wrong. The DevOps automation page lists CI/CD pipelines among its services, and the same release automation principles apply to SAP transports as much as to other code. Where the size of the team does not justify a pipeline, a documented manual process with a checklist is still better than an informal one.

Emergency fixes need a route of their own. A rule that no change reaches production without a test is sound until a payment run fails at the end of the afternoon. An emergency route should define who may authorize the change, how it is tested as far as time allows, how it is recorded at the time, and how the fix is carried back into the normal development line so the next transport does not undo it. The review after an emergency change is where the team learns whether the route worked.

Next step for a technical backlog

List your open technical items in the form the table above uses: what the work is, which system it touches and what you will hand over. That list lets a provider scope the work honestly. Discuss your SAP technical backlog with the Oblytech team.

Partner with Oblytech for a Smooth S/4HANA Migration

At Oblytech, we deliver SAP technical solutions for smoother operations and better integrations. Whether you need custom SAP development, system integration, or performance optimization, our team can take on the work.

Technical or functional: deciding which kind of SAP work a request needs

SAP technical services cover the work that changes or keeps running the code, interfaces, data movement and platform beneath an SAP system. Functional work changes how a business process is set up, such as which values a company code uses or how an approval route is defined. If a process owner can meet the request by adjusting settings the functional team already controls, it is functional. If it needs new code, a new connection to another system, a different way of loading data, or work on the platform itself, it is technical.

A quick test is to ask what would have to change if the business rule changed. A new approval step that standard workflow tools can express is a configuration change. A pricing rule the standard system cannot represent needs a program, and that program becomes technical work with its own testing and transport route.

RequestUsually functionalUsually technical
A new approval stepStandard workflow set up in configurationA custom workflow that calls logic the standard cannot reach
A report users wantStandard report with a different selection or layoutA new program that reads data the report cannot access
Data from another systemA mapping decision made by the process ownerAn interface, its error handling and its monitoring

Two mistakes show up often. The first is commissioning custom code for something a configuration change would solve, which then has to survive every future upgrade. The second is the reverse: a team configures around a missing capability for years until users keep their own spreadsheets. In most implementations, a short functional review before any build asks which standard option was tried, why it did not fit, and who will own the result after go-live. If the review points to configuration, the ongoing SAP support and optimization route is usually where the change belongs.

Custom code written against an older release is the part that tends to need attention during an upgrade, so a technical request meant to last should be checked against the SAP upgrade planning work before it is built. Requests that sit inside a specialised module are covered on the niche SAP modules page.

When the answer is technical, bring three things to the first conversation: the business rule in plain words, the systems involved, and a sample of the input with the output you expect. A provider that asks for these first is showing how it will staff the work.

ServiceNow guides on this topic

Guides from the Oblytech ServiceNow library that explain the practice behind this page.

More in this section