OBLYTECH Logo
OBLYTECH Logo

Create a Security Incident in ServiceNow: Intake Paths Compared

To create a security incident in ServiceNow, use the Security Incident list for analyst entry, the Security Incident Catalog for employee reports, Event Management alerts for monitoring signals, or configured email processing for phishing submissions. Choose the path by who reports the issue, what evidence arrives, and how duplicate reports should be handled.

Create a security incident from the analyst list

Manual creation suits cases that arrive by phone, from a physical site visit or from another team’s finding. It gives the analyst control over the initial description and affected resource, but its quality depends on the information collected. Record what is known and distinguish a suspected issue from an observed fact.

The role required for creation from the Security Incident list is sn_si.basic. Navigate to All > Security Incident > Incidents > Show All Incidents, select New, and complete the form. Select and hold, or right-click, the record header and select Save. Check the labels and enabled integrations on your instance and release before adopting these paths.

Use these fields to make the record usable by the next analyst:

  • Configuration Item identifies the affected resource; Affected user identifies the person affected.
  • Source records how the issue arrived, such as email, a phone call or network monitoring.
  • Short description states the issue concisely. Category and Subcategory identify its type.
  • Assignment group and Assigned to identify the team and individual responsible for analysis.
  • Priority expresses the order of attention, while Business impact captures the importance to the business.

The initial State is Draft. Category selection can start a category-specific analysis workflow when the record is saved, so avoid treating categorization as cosmetic. A security tag can identify access or add metadata, but its field appears after the incident has been saved.

When a new CI is added, integration workflows can retrieve running processes, running services and network statistics. Activated integrations determine additional collection. Use the Show Enrichment Data related link to inspect retrieved results; check whether collection actually produced evidence before making a triage decision.

Evaluate alerts from monitoring tools as an intake path

In ServiceNow, events from alert monitoring tools are first processed by Event Management and grouped into alerts. An alert rule can then create a security incident from those alerts. The Alert Rules module includes a sample rule named Create security incidents from critical alerts, which you can review as a starting point. Opening an incident for each event can fill the queue with low-severity items that analysts may learn to ignore. Consider a severity threshold for the rule.

The rule’s task template controls initial incident values. Separate rules with different conditions can handle distinct types of security incidents. For a suspicious alert that needs human review, a user with the Security Admin role can select Create Security Incident. This is a separate action from creating a record through the incident list.

Check the incoming event before debugging the resulting case. The node should identify the affected CI by name, IP address or sys_id. The event classification should be Security, and the event description supplies the incident description. A missing resource identifier can leave an analyst with a technically detailed report but no clear affected asset.

Additional information accepts field-name and value pairs in a JSON string. Matching empty incident fields can receive those values; populated fields are not overwritten through this mechanism. Test both empty and populated destinations rather than assuming a later event will replace earlier evidence. For a wider view of these connections, read the integration patterns guide for security incident response.

Evaluate mailbox parsing and phishing reports as intake paths

For a shared security or abuse mailbox, verify whether your implementation can create records and copy message content into incident fields. The trade-off is noise. Auto-replies, newsletters, bounce messages and long forwarded chains arrive in the same mailbox, so consider sender and subject filtering before records are created. Test each rule against real messages from your own mailbox rather than tidy samples.

User Reported Phishing provides a more specific intake design. Employees can forward suspicious messages as attachments or upload an .eml file. Where the PhishAlarm plugin is configured with Microsoft Outlook, staff can use Report Phish. Preserve the original message so investigators can inspect its content, origin and headers.

A user with sn_si.admin can configure matching rules at All > Security Operations > Email Processing > Ingestion Rules – User Reported Phishing. Select New, provide a name and conditions, choose the Rule Type, and select Submit. Deny rules are evaluated before Allow rules regardless of Order, so test exceptions before widening an allow condition.

In the enhanced design, Create Phishing Email creates a phishing email record when matching rules are met. The transformation flow then creates or associates the security incident. The Security Operations spoke must be installed, and the flow is inactive by default. If email records appear without incidents, check flow activation and execution before changing the mailbox filters. Review custom inbound actions for overlapping processing. The usual inbound email mistakes provide related troubleshooting context.

Use the Security Incident Catalog for employee reports

The Security Incident Catalog gives internal employees a structured route without requiring the analyst’s creation role. No additional role is required beyond snc_internal, the basic internal-user role. Navigate to All > Self-Service > Security Incident Catalog, choose an item, select a subcategory if offered, enter the information and select Submit. The request goes to the Security Incident department.

Consider questions about what happened, when it happened, which system is involved, and how sensitive the data is. Verify how your implementation stores the answers, makes them available for sorting and filtering, and enforces required questions. Staff need to know the form exists; some may keep emailing the team because that feels faster to them.

Write the questions in the words your staff use. A question about data classification that needs a policy lookup may invite guesses; make the guidance easy to find. During acceptance testing, ask an employee unfamiliar with security terminology to submit a report, then ask an analyst to identify the next action from the resulting record.

Grouping and deduplication decide the investigation workload

When several events describe the same host, user or indicator, evaluate whether they belong in one incident. Candidate matching criteria include the affected host, account, file hash, IP address or domain, combined with a time window. These are design choices to test, not a universal matching configuration.

The sample critical-alert rule updates its security incident as new events arrive. An event that changes the incident produces a work notes entry containing the event and additional field values. If nothing changes, no work note is created. Do not use the absence of a new note alone as proof that an event failed to arrive.

Enhanced phishing aggregation can associate duplicate reports with one parent incident. The parent-child setting determines whether aggregation creates child incidents or associates phishing email records without creating children. Decide whether analysts need separate child cases before measuring queue volume; a lower incident count may simply reflect that setting.

Be careful with broad matching. A grouping rule that is too loose can hide separate attacks behind one record, and a rule that is too strict can leave duplicates. Review merge decisions after a rule change and document why the rule exists. For how larger teams arrange these queues, see the enterprise use cases page.

Choose and test the intake split

Use monitoring intake for machine-generated signals, phishing processing for reported messages, the catalog for employee observations, and manual entry for analyst-led findings. Assign an owner to each route. Test a valid submission, an unrelated submission, a duplicate and a failure to identify an affected resource. Check the saved record, assignment and evidence together.

For help planning this work, see ServiceNow implementation. The wider set of guides sits on the security incident response hub.

Questions about intake exceptions and follow-up

How can an employee follow a catalog submission?

After submitting, the employee can open Self-Service > My Requests and enter the request number. Include that number in the team’s acknowledgment so a follow-up can refer to the same request.

What happens to a phishing duplicate after its parent closes?

Incoming duplicates of a closed or canceled parent become new security incidents in the enhanced phishing design. The previous parent can appear in the Similar Security Incident related list. Flow changes can alter this handling.

Why might a recipient be absent from Affected Users?

Addresses in a phishing message’s To and CC lists may not match internal users. Those unmatched recipients are excluded from Affected Users, with a work note identifying the mismatch. Investigate identity matching before concluding that nobody received the message.

Why can a risk score stop recalculating?

Entering a risk score manually selects Risk score override. The manually entered value then stays outside automatic recalculation. Check that flag when intake changes appear to leave an unexpectedly fixed score.