OBLYTECH Logo
OBLYTECH Logo

CSDM Domains and the CMDB Classes Behind Each One

CSDM domains group ServiceNow records by their purpose across the service life cycle. The mapping includes planning records, development components, deployed services, consumer offerings, and shared Foundation data. Some records are operational configuration items, some are nonoperational CIs, and others are reference data. Record the table and purpose together before designing imports or reports.

What a CSDM domain is for

A domain draws a boundary around one area of the service picture. Business-facing records, such as the services a team supports, are kept apart from the technology that delivers them. The split lets each area have its own owner and quality checks, so a gap in one area does not hide inside another.

Confirm domain names against your adopted CSDM version and instance. Names and table coverage have changed between versions, and local labels can obscure those differences. The mapping below uses the Brazil domain names. Start with the Common Service Data Model overview when agreeing on the model’s boundaries.

Fill the Foundation domain before mapping service dependencies

Foundation tables hold base data that the other domains reference. Foundation data is not modeled through CMDB relationships in the domain framework, but that does not mean that everything listed under Foundation is a non-CI. Business processes, for example, are manually maintained CIs in cmdb_ci_business_process. Contracts in ast_contract and product models in cmdb_model are not CIs.

Keep common data separate from the operational class inventory. Companies use core_company, locations use cmn_location, groups use sys_user_group, and users use sys_user. CMDB groups in cmdb_group are collections of CIs rather than CIs themselves. A Dynamic CI Group references a CMDB group, but the two records have different purposes.

List the Foundation tables that your chosen domains reference, identify their trusted sources, and assign stewards before loading dependent records. Process owners, data stewards, product owners, and contract managers have different responsibilities here. For the wider build sequence, see the CSDM implementation roadmap.

Map planning and development domains to their tables

Ideation & Strategy

This domain supports product owners considering new products, features, and improvements. Planning Item uses sn_align_core_planning_item; Product Idea uses sn_align_core_product_idea. These are planning records, so do not assume that a table must extend cmdb_ci simply because it appears in a CSDM domain. Keep proposed work distinguishable from the deployed services that may eventually deliver it.

Design & Planning

The main classes are Business Capability, cmdb_ci_business_capability; Business Application, cmdb_ci_business_app; and Information Object, cmdb_ci_information_object. Enterprise architects and digital product owners use this domain to describe what the business needs and which applications support it. These CIs are nonoperational and cannot be selected as operational targets for incident, problem, or change management.

A business application represents the managed application across environments and geographies. Its Consumes::Consumed By relationship connects planning to deployed application service instances. An information object describes the information an application uses; it is not a replacement for the database instance that stores the data.

Build & Integration

Agile Development Component uses cmdb_ci_sdlc_component. It represents a separately developed part of an application or technology, including application code and infrastructure configuration components. These records describe development work rather than operational incident targets. The component can connect a business application to its deployed service instance through Contains::Contained By relationships.

When reviewing a development feed, distinguish the component being built from its running deployment. Sending both into one class loses that distinction and makes ownership harder to interpret. Record whether a pipeline is supplying a development component or evidence about an operational instance before choosing its destination.

Locate operational classes in Service Delivery

The Service Delivery domain holds deployed technology and the services that support it. Technology management services use cmdb_ci_service_technical; technology management offerings use service_offering. Service instances use cmdb_ci_service_auto and its relevant extensions. Dynamic CI groups use cmdb_ci_query_based_service. Applications, servers, and network components contribute the infrastructure beneath these services.

A service instance is a logical representation of a deployed system or application stack. It should use logical life-cycle value pairs rather than physical ones. Service instances were called application services before CSDM v5. The parent label changed, while application service extensions remain relevant to deployed applications.

Keep the business application separate from the application running on a host. The cmdb_ci_appl table holds application instances and its extensions, not the application portfolio. One installed application can support multiple service instances. A portfolio record in cmdb_ci_business_app therefore should not be replaced by a discovered application record.

Technology management services provide the provider-facing view and can have multiple offerings. Offerings distinguish commitments or support arrangements. A technology management service is a single-level service, rather than a hierarchy of technology management services. Use its offerings and related records to express the distinctions the service actually needs.

Connect Service Consumption and Manage Portfolio

Service Consumption contains the consumer-facing service structure. Business services use cmdb_ci_service_business, which extends cmdb_ci_service. Existing business services may still reside in the core service table, so review their classification before deciding that a record is missing. Business service offerings use service_offering; Service Catalog uses sc_catalog.

The same offering table supports business and technology offerings. Record the parent service and classification alongside the table name to distinguish their meaning. A business service offering has a Depends on::Used by relationship with a service instance. Catalog items provide a request route; they should not be counted as operational CIs.

Manage Portfolio is an oversight layer across the domains, rather than a separate destination for duplicate service records. A service owner may be accountable for a business application, its deployed instances, and their business impact. Put that accountability next to the existing records instead of creating another application solely for portfolio reporting.

Check table names, relationships, and ownership together

The label on a form or list is a display name. The table behind it has its own name, and the two can differ. Check the table dictionary and class hierarchy before writing an import mapping. Record both the label and the table name so a later label change does not silently alter the team’s interpretation.

Use a mapping register with these fields:

  • Domain and record purpose, including operational or nonoperational use.
  • Table name and displayed label, plus classification where the table is shared.
  • Expected relationship direction or reference field and its destination.
  • Accountable owner, source system, and steward who resolves exceptions.
  • Records excluded from CI totals, including reference and catalog records.

Ownership is a governance decision. Record a staffed role and fallback responsibility rather than relying on one person’s name. These are business responsibilities, not a grant of platform access. Use the CSDM governance model to agree who approves changes to the register.

Start from cmdb_ci when examining a CI class and its inherited fields, but keep non-CI tables on their own branch of the register. Custom classes and installed applications can change the available hierarchy. Compare what exists on the instance with the intended record purpose before choosing a target. A plain explanation of CMDB classes helps separate inheritance from domain membership.

For each import, test a record with missing reference data and one with an ambiguous service name. Agree whether the steward should reject it, resolve the reference, or send it back to the source owner. Do not let an unresolved location create an unnecessary service record. Coordinate those checks with the CMDB implementation roadmap so domain adoption and data ingestion follow the same sequence.

Validate a small sample before a bulk load. Trace a business application to an application service instance, then trace the related offering to its supporting service instance. Check the direction and type of each connection. Matching names alone do not establish a dependency. When the chain breaks, identify whether the missing element is a record, a reference, or a relationship before creating more data.

Pick the CSDM version your organization has adopted and record it at the top of the mapping. For an older mapping, decide which labels and relationships need migration and preserve the reason for each change. For help planning this work, see ServiceNow implementation.

Questions that arise during domain reviews

Must Agile development components be configured before operational services?

No. Their configuration is optional. Include them when development traceability serves a defined use case, and avoid delaying the operational service model solely to populate unused development records.

Does using the Design & Planning tables require Application Portfolio Management?

No. The tables can support the model without that application. Decide separately whether you need its portfolio workflows and management capabilities.

Can a Dynamic CI Group contain other CI groups?

No. Its membership consists of CIs. Review the query and resulting members rather than attempting to build nested groups as a substitute for service relationships.

Can different technology offerings assign conflicting support arrangements to the same grouped CI?

A CI associated through a Dynamic CI Group can relate to one technology management service or offering. Check overlapping group membership when offerings carry different support groups or commitments, and resolve the conflict before relying on that assignment.