ServiceNow cloud provisioning setup is the work you finish before anyone on the platform can request a cloud resource. It covers the prerequisites, the roles that administer the application, the guided configuration for each cloud provider, and the activation and checks that confirm the instance is ready for real requests. Work through these steps in order, because the setup procedures are written to be performed that way. The full set of guides sits in the cloud provisioning and governance section.
One thing to settle first: on the Brazil release, Cloud Provisioning and Governance is being prepared for future deprecation. It is hidden and no longer installed on new instances, although ServiceNow will continue to support it. If your instance is on Brazil, check which cloud application is installed before you plan the work below.
What has to be in place before the first request
Start with decisions, not screens. Settle which cloud accounts or subscriptions the platform may touch, which regions are in scope, and who pays for what the platform creates. A setup pointed at the wrong account is awkward to unwind, so confirm the account before you enter it. Credential scope needs the same care. Keep the access each connection holds as narrow as the provider allows, and read the guide on governing credential access for discovery for the thinking behind that.
Then agree on the approval path. Who approves a request, who gets notified, and what happens when the approver is away all need answers before users arrive. An approval rule with no named approver leaves requests without anyone to act on them.
Who needs which roles to run setup
Setup is an administrator task. The person doing it needs the sn_cmp.cloud_admin role in the application and the Cloud Provisioning and Governance plugin (com.snc.cloud.mgmt) active on the instance. Confirm the exact role names in your own instance, since they can change between releases. Decide early which people hold the administrator role and which hold the cloud service user role, so nobody discovers the gap halfway through the guided steps.
If the application is new to your team, read the plain-language overview of the application before you open the setup screens. It gives you the vocabulary the rest of this process assumes.
Walking through the guided setup in order
The guided setup moves through the cloud connections one step at a time. Read each screen before you submit it, and write down each name and identifier you enter. A typo caught at setup is far cheaper to fix than one found later in a report.
Cloud Provisioning and Governance guided setup is a sequence of tasks that configures the application on your instance. To open it, go to Guided Setup, then ITOM Guided Setup.
The setup records your decisions. It does not make them for you. If you reach a screen and cannot answer a field, stop and go back to the decisions in the first section rather than guessing a value to get past it.
How setup differs between AWS, Azure and VMware
The overall flow stays the same across providers, but the connection details do not. Public cloud connections rely on credentials for an identity in the target account or subscription. On AWS, that is a user with programmatic access, which you create in the AWS Management Console and then store in a service account. A VMware connection points at a virtualization environment on your own infrastructure. For that one, the MID Server has to reach the vCenter server, and it needs HTTPS access to the ESXi hosts when a script sets a VM’s IP address. Check that network path before you start, since a connection that fails here often looks like a configuration error.
The practical difference is who signs off. Cloud setups usually need the cloud team to agree on accounts and identities. VMware setups usually need the virtualization team to confirm which clusters and storage should be offered. Confirm the exact field labels for your release on each screen before you enter values.
Filling the CMDB with a first discovery run
The first discovery run is what turns an empty cloud account into something users can act on. Run it manually on each datacenter to populate the CMDB, then put discovery on a recurring schedule so the records stay current. Read about how the recurring discovery schedule works before you choose an interval.
The unit discovery works on is the logical datacenter. Cloud Provisioning and Governance uses that term where a provider says region, so an AWS region and an Azure region both appear as logical datacenters in the platform. A cloud account represents all or part of your managed cloud infrastructure and can include several service accounts, even across providers. For each service account you specify which datacenters to include in the cloud account. The on-demand discovery step for a service account populates the logical datacenters associated with that provider account.
Activation is a separate step from setup
Finishing the guided setup does not, on its own, mean the application is ready for users. Activation is handled as its own subscription step. Check the subscription status before you tell requesters the service is open. After the maintenance window, confirm the plugin on the Installed tab in Application Manager.
Choosing resource profiles and governance rules
Once a connection and its datacenters are working, the next job is deciding what users may ask for. Resource profiles define the attributes a request can carry, and governance tools such as quotas, policies and capacity limits set the boundaries for what can be provisioned.
Resource profiles come in several types, and each one controls a different aspect of the resource. A compute profile sets the size of the hardware for a new virtual machine, an OS profile sets the image, including its type and version, and a compute security group profile applies firewall rules such as HTTP and HTTPS. Application and schedule profiles cover installed software and stop-start timing. It is usually easier to define them one at a time.
Governance sits on top of the profiles. Quotas and policies restrict the provisioning of cloud resources, and a policy action can trigger an approval subflow when an order is checked against a quota. Capacity limits cap the attributes of requested resources, such as the number of virtual machines, virtual CPUs or aggregate storage, and they can be set separately for each logical datacenter in a cloud account.
A checklist to run before you open requests to users
Work through these before the first real request. Each item is worth confirming before users arrive.
- The application and its plugins show as active on the instance
- Each provider connection tests cleanly from the instance
- Each account, subscription or cluster the platform may use is listed and has a named owner
- Each approval rule names an approver who can log in and act on it
- A test request has been raised, approved and fulfilled in a non-production setting
- Someone owns the regular review of accounts, identities and access
Keep the checklist with the setup record. A written list shows which step to revisit when a gap appears. Once requests are flowing, the automation opportunities for cloud provisioning are the next thing worth reviewing. The best practices guide for cloud provisioning and governance covers the habits that keep the setup healthy over time.
Common questions about the setup
What must be configured before users can request cloud resources?
Before users can request anything, the application and its plugin need to be active on the instance, the provider accounts the platform may use need a service account with Discovery run on each datacenter, and an approval path should name an approver.
Which role is needed to administer the application?
Operations in the application need the sn_cmp.cloud_admin role. Setup also needs the plugin active on the instance, and the provider console needs its own rights, such as the VMware administrator role for VMware Console operations. Exact role names vary by release and by how the instance was built, so look them up in your own instance rather than relying on a name from a guide, including this one.
Should the new application run beside the legacy cloud management application?
Cloud Provisioning and Governance is incompatible with the legacy v1 Cloud Management application, and the two cannot be used simultaneously. Treat the older application as a migration source rather than a second system to keep alive. Plan a cut-over date rather than a parallel run. Planning the move is a project in its own right, and the cloud consulting and migration page covers the wider questions around moving workloads.
Who should run the setup?
An administrator from the platform team should run it, working with the cloud team on accounts and identities, and with the virtualization team if VMware is in scope. Project leads do not need to run the screens themselves, but they should sign off the decisions the setup depends on, so the work does not wait on a meeting halfway through.