Agent Chat is the part of ServiceNow that lets a human agent talk to a requester in real time from inside a workspace. A requester starts a chat, Advanced Work Assignment picks an agent, and the agent accepts it from the inbox, replies, creates a record if needed, or transfers the chat.
What Agent Chat actually is
Agent Chat is a conversation window embedded in a ServiceNow workspace. It is the human half of a chat service. The other half, when you use it, is Virtual Agent, the automated chatbot that usually greets the requester first and tries to solve the problem with a topic or a knowledge article.
The two are separate products with a hand-off between them. Virtual Agent is not required for Agent Chat. You can send requesters straight to a person and skip the bot entirely. When the bot is in front, the requester reaches a person through the bot’s own escalation path, for example a “contact support” choice, or because a topic script hands the conversation over.
From the agent’s side, the window sits beside the record they are working on. In practice that means an agent can read the requester’s message, open the related incident or case, check a knowledge article and reply without switching tabs.
What has to exist before an agent can take a chat
People often install the plugin and then wonder why nothing arrives. Chat is routed work, so several pieces must be in place.
- A workspace with an inbox. Agent Chat is delivered inside a workspace, and the agent inbox is where offered chats show up. The inbox is also where the agent sets presence and accepts or rejects work. Plan on the current workspace experience and check which workspace your release supports.
- Advanced Work Assignment. AWA is the engine that routes the chat. It looks at group membership, availability, capacity and, if you configure it, skills. Without it there is nothing to push the chat to an agent.
- The chat plugin itself. Activate Advanced Work Assignment first. Agent Chat is one of the related AWA plugins, listed on the AWA home page, and activating it needs the admin role.
- A requester-facing chat entry point. The chat interface has to be installed and set up in the portal the requester uses. Without it, nobody can start a conversation.
- Agents who can actually be assigned. Agents need the Advanced Work Assignment agent role plus the workspace access roles your release requires, and they need to be in a group attached to a queue.
If any one of these is missing, the symptom is usually the same: the requester sees a chat that never connects, or the agent sits online and sees an empty inbox.
A useful habit is to write this list into your build ticket and tick each item off with the name of the person who confirmed it. Chat projects tend to stall when the platform team assumes the service desk owns the groups, and the service desk assumes the platform team owns the queues. Naming an owner for each of the five items removes that argument before it starts.
How a chat gets from the requester to the right agent
AWA treats a chat as a work item. The path is short but each step has its own configuration.
Service channel. A service channel tells AWA what kind of work this is. Chat has its own channel, separate from cases or incidents. The channel is also where you connect the chat to the queues that should receive it.
Queue. A queue is a holding area for work items that match criteria you set. A team handling IT chat and a team handling HR chat normally get different queues. A VIP queue is a common pattern when some requesters need faster pickup. If you run separate departments, give each its own queue and confirm in AWA setup which service channel feeds which queue.
Assignment rules. Agent groups are attached to a queue through its eligibility assignment, and each group gets an assignment rule that sets how AWA picks an agent from it, such as Last Assigned or Most Capacity. The group is who AWA is allowed to choose from.
Agent selection. Within that group, AWA considers who is available, who has capacity left, and, when skills are configured, who is best matched. Capacity matters more than people expect. As a hypothetical example, an agent set up to hold two chats at once is offered a second one while the first is open. Set capacity too high and quality drops, too low and requesters wait while agents are half idle.
Offer. The chat appears in the agent’s inbox. The agent accepts or rejects it. Whether an agent who rejected an offer can be offered the same chat again depends on the Reassignable setting on the reject reason, and an unanswered offer is reassigned once the timeout in the assignment rule is reached, provided reassign on timeout is enabled.
What an agent can do inside a chat
The basics are:
- Answer the requester directly.
- Create an incident or case from the conversation, so the work is tracked.
- Transfer the chat to another agent.
Because the chat is delivered inside the workspace, the agent does not need a separate chat tool to create the record or hand the conversation on.
Settings worth deciding on deliberately
Several choices are easy to leave at their defaults and then regret.
Idle handling. Chats go quiet constantly because requesters get pulled away. ServiceNow has a reminder timeout and a cancel timeout for idle chats, and the cancel value has to be longer than the reminder value. Set the two together instead of just one, and write the chosen values into your build ticket so the service desk knows what requesters will experience.
Data masking. Chats attract sensitive details, such as card numbers or national identifiers, because people type whatever the agent asks for. Decide before go-live what your compliance team expects to be hidden or kept out of stored transcripts, find out what your release offers to do that, and test with realistic examples rather than assuming the setting works.
Identity checks. If requesters can start a chat without being recognised, decide in advance which verification questions agents should ask before sharing account details. That is a policy your business has to write, not something the platform settles for you.
Messages the requester reads while waiting. What a requester sees while waiting for an agent shapes whether they stay. Short, plain wording is typically easier for a waiting requester to take in than clever wording.
Where Agent Chat is not the right tool
A few things get confused with it.
- Connect Support. This is the older chat tool. Advanced Work Assignment with Agent Chat in workspace is the replacement, and the older tool has been deprecated in favour of it. If you still run it, plan a migration rather than extending it.
- Email and ticket forms. Chat suits short, urgent, back-and-forth questions. Anything that needs attachments, approvals or a long written explanation is usually better served by a form or an email, with chat used to point the requester there.
A sensible first test
Build it small. Create one queue, one agent group with two test users, and one chat entry point. Set presence to available on one user, start a chat as a requester, and watch it arrive. Then reject it with the first agent and check whether it reaches the second. If the reject reason is set as reassignable, the first agent can be offered it again, so check that setting as well. Next transfer it to the second agent, create an incident from it, and close the chat. That path touches routing, capacity, transfer and record creation in one pass, and a failure you meet usually points to a specific missing piece from the list above.
After that, it is worth adding skills, extra queues or Virtual Agent in front. Add them one at a time and repeat the test after each.
Before real requesters arrive, run a second test where you start a chat and stop replying. Note what happens on your instance, and whether it matches what you decided in the idle handling settings. Idle behaviour is easy to forget, and requesters notice it quickly when it is wrong.
Frequently asked questions
Do I need Virtual Agent to use Agent Chat?
No. Virtual Agent is optional. You can route requesters directly to a live agent, and you can also let the bot try first and hand over when it cannot help.
Why does my agent see nothing in the inbox?
Usually the agent is not set to available, is not in a group attached to the queue, has no capacity left, or the chat service channel is not connected to the queue. Check those four before looking deeper.
Is Agent Chat the same as Connect Support?
No. Connect Support belongs to an older approach. Advanced Work Assignment with Agent Chat in workspace is the replacement.
Can agents create tickets from a chat?
Yes. An agent can create an incident or case from the conversation.
Can I run IT and HR chat separately?
Yes. Use separate queues, with different agent groups. Confirm the routing on your instance with a test chat from each side.
Where do I look when a chat fails?
Start with the AWA work item records and queue views to see whether the work item was created and offered. If it was never created, the problem is in the entry point or the service channel. If it was created but never accepted, look at presence, group membership and capacity.