ServiceNow Performance Analyzer is an application that shows page load time, trends and waterfall views of each resource a page loads, read directly from your instance. It targets page performance and bottlenecks in pages built on the UX framework. For instance-wide health, meaning slow transactions, slow queries and long-running jobs, the platform’s Instance Observer reports are the tool to use.
Teams searching for this name are usually trying to answer one of two questions. Is a particular page slow in the browser? Or is the whole instance slowing down? The application covers the first question. The second belongs to a different set of reports. This guide separates the two so you open the right one first.
What the Performance Analyzer application covers
Performance Analyzer provides page load time data and trends, plus waterfall visualizations of how a page loads. The data is accessed from inside the ServiceNow instance, so you do not export logs to an outside tool before you can read them. The application can identify page performance issues and bottlenecks in UX framework pages on its own.
A slow page is rarely slow for a single reason. The browser fetches the page shell, scripts, styles and the data calls that fill in the content, and these requests run partly one after another and partly in parallel. Average page load numbers hide that structure. A waterfall lays each request on a timeline, so the request that holds the rest back becomes visible. That is why the waterfall view is the part of this application that typically answers the question “why is this page slow”, while the trend view answers “did it get slower”.
Drilling down through the Zurich views
The Zurich release added a drill-down structure. You move down one level at a time, starting with a time window and finishing at a single interaction.
| Level | What you select | What it shows |
|---|---|---|
| Time window | A duration filter from the last 15 minutes to the last 7 days | Aggregate data per application, including total UI time, download time, trends and comparison with earlier performance |
| Application | One application | Total UI time and download time, plus performance by page route |
| Page route | One page route | Interaction timestamps, interaction types, UI time, download time and record details |
| Interaction | One interaction | A waterfall showing each page resource loaded during that interaction |
The waterfall for an interaction shows each resource loaded during that interaction. Request-flow views are also part of the Zurich release. Start with the widest time window to find the applications that matter, then narrow to the route and interaction behind the slowdown. Working from the top down keeps you from reading one interaction and assuming it represents the whole application.
Aggregated metrics are available by application and by route, so the same data can answer both a broad question (which application is slowest this week) and a narrow one (which record type makes this route heavy).
Measuring instance health with Instance Observer reports
Instance performance telemetry reports are generated from the Instance Observer area. They summarize instance health, performance trends and database growth, and they support instance management and sharing findings with stakeholders.
To generate one, go to Instance Observer, then Reports. Select the report type, the instance and the date range, then select Generate report. From the report page you can download it or schedule it to run periodically. For a description of any metric, open Help and then Metrics from the main menu.
Daily Performance Metrics
The Daily Performance Metrics report is a current health snapshot made of six sub-reports.
- ServiceNow Platform Health shows node availability, response time and lag time. It compares today with the last 30 days and colors each anomaly green, yellow or red against system thresholds.
- Health Indicator counts slow transactions, slow queries and long-running jobs. It compares today, yesterday and the 30-day average, using the same color scheme.
- Top 10 Slow Transactions first finds the most-executed transactions by total time, then ranks those by average execution time. Each row shows the page, average and total execution time, and execution count.
- Top 10 Slow Queries uses the same method, applied to queries.
- Top 10 Long Running Jobs ranks jobs by duration in minutes and shows the job name, node and worker.
- Critical Support Cases shows the total count of severity 1 and severity 2 cases in its header, with case numbers, area, priority, state and the person who opened each case.
The two Top 10 lists are the fastest route from “the instance feels slow” to a named page, query or job. The ranking first selects the most-executed transactions by total time, then orders that group by average execution time, so a slow transaction that runs rarely may not appear at all. Read both the average and the count before deciding which to fix. On sub-production instances, the Top 10 Slow Transactions and Top 10 Slow Queries sub-reports are not available to Guided customers.
Performance Trend
The Performance Trend report gives drill-down detail on transaction and report times, database response, semaphore depth, event queues, recurring and running jobs, memory, and user session summaries. It requires the Advanced or Total package.
Custom Performance Report
The Custom Performance Report lets you pick between 1 and 20 metrics from about 90 available. The path runs through the Instance Observer Dashboard, then the Reports tab, then On Demand Reports. Select the instance, choose Custom Performance Report, set the date range, and pick All or one category from the Performance page. Metrics render as time-series charts or aggregated tables, and the result can be exported by email, as CSV or as PDF. Metrics can be added in any order.
Database Growth
The Database Growth report tracks the primary database and the database including shards. The total size of the database is calculated every 4 hours. The Top 20 Tables by size list shows each table’s size in GB, its one-day growth and rate, and its seven-day growth rate. Guided customers can select a date range of up to 45 days.
Impact packages, report availability and retention
Some Instance Observer reports vary by the Impact package you subscribe to. The table below shows the support matrix for each report.
| Report | Guided | Advanced | Total |
|---|---|---|---|
| Daily Performance Metrics | Yes | Yes | Yes |
| Performance Trend | No | Yes | Yes |
| Database Growth | Yes | Yes | Yes |
| Self Service Alerts | No | Yes | Yes |
Data retention differs by tier. Guided keeps data for 45 days, and Advanced and Total keep it for 6 months. Plan any trend comparison around that window, because a question about last quarter cannot be answered from a Guided instance.
Choosing the right starting point
Pick the tool that matches the symptom you are seeing.
| Symptom | Start with |
|---|---|
| One page feels slow for users in the browser | Performance Analyzer, then the route and interaction waterfall |
| A specific interaction keeps waiting on one resource | Performance Analyzer interaction waterfall |
| The whole instance feels slow | Daily Performance Metrics, then the Top 10 lists |
| Response times are drifting upward over weeks | Performance Trend report, within the retention window |
| Database storage is growing faster than expected | Database Growth report |
The table is a practical reading of the features above, not a rule set. A browser-side slowdown and a server-side slowdown can appear together, so use both views when the symptom is vague.
Setup and availability
Starting with the Zurich release, Performance Analyzer is available on your instance automatically. On earlier instances you install it from the ServiceNow Store, which is where a request for it is also submitted. The Yokohama release had no Performance Analyzer updates.
Once it is available, the first task is to open the application and check that the time window returns data for an application you use daily. Load one of those pages yourself first, then look for it in the route view, so you can match what you see on screen with what the report records.
Frequently asked questions
Does Performance Analyzer measure the whole instance?
No. It is built around page load time and the performance of pages on the UX framework. Instance-wide health, including slow transactions, slow queries and long-running jobs, is covered by the Instance Observer reports.
Where do I find the slowest transactions?
Open Instance Observer, then Reports, then generate the Daily Performance Metrics report. The Top 10 Slow Transactions sub-report picks the most-executed transactions by total time, then ranks those by average execution time.
Which package gives me trend data?
The Performance Trend report requires Advanced or Total. Guided customers get the Daily Performance Metrics and Database Growth reports.
How long is the data kept?
Guided keeps data for 45 days. Advanced and Total keep it for 6 months.
Can I share a report with someone else?
Yes. A generated report can be downloaded, and the Custom Performance Report can be exported by email, as CSV or as PDF.
Do I need to install Performance Analyzer?
From the Zurich release onward it is available automatically. On earlier instances it is installed from the ServiceNow Store.