Targeted communications in ServiceNow HR Service Delivery uses publications or campaigns. The Targeted Communications application publishes articles and emails to chosen recipient lists, with an optional approval workflow. Campaigns deliver staged content on the employee portal, with email distribution, once the campaign is published. Recipient lists decide who receives a publication, and audience records decide who sees a campaign.
Two ways to reach a targeted group
The two tools solve related but different problems. A publication is a single message, usually an article or email, that can move through a review path before it goes live. A campaign is a planned series of content stages that runs over a date range and can change what each group sees.
- Publications are managed through Targeted Communications > Publications. They can address employees, customer contacts and accounts, or consumers, and can use an optional approval path.
- Campaigns are assembled in Content Experience Builder. They target employees, define content approvers, and organize messages into stages.
- A publication uses a publish date and an expiry date. Campaigns use start and end times with stage triggers to schedule content.
- Publications provide portal articles and optional email notifications. Campaigns combine portal content with email and other configured delivery channels.
Setting up a publication with an approval path
Three roles run publications. The publications author (sn_publications.author) creates and manages articles and emails. The publications administrator (sn_publications.admin) manages publications and can update workflows. The publications approver (sn_publications.approver) performs reviews, and administrators add users to that role.
Two default publication paths exist: immediate publishing and approval before publishing. Authors can request a review before a publication goes out. Starting with Zurich, legacy publication workflows moved to low code flows in Workflow Studio, with the same functionality. On upgrade, customized legacy workflows cause a fix script to deactivate the new flows and reactivate the legacy workflows. Check which path is active on your instance before changing approval routing.
A publication moves through six stages: Author, Review, Ready To Publish, Published, Expired, and Cancelled. The stage process flow sits at the top of the publication form, with the current stage underlined in blue and completed stages marked with a blue check. A publication cannot be updated while it is in the Review stage, so the author should finish any edits before requesting review.
Authors set a publish date and an expiry date. The system uses these two dates to publish and expire the article without manual action. The publication lists reflect this: Active Publications covers items in the Author, Review, Ready to Publish, or Published stages; Draft Publications covers items that were sent for review but not yet published; and Expired Publications covers items past their expiry date or expired by hand.
Building the recipient list
Recipient lists can be built three ways: with the condition builder, with scripts, or by uploading a file. A single list can mix dynamic entries, which update from conditions, with manual entries that someone adds or removes by hand.
When the optional email notification is turned on, the email goes to all recipients when the article is published. Recipients are placed in the BCC field, so they do not see one another’s addresses. Delegates of a recipient list user do not receive the published email, so a delegate who needs the message has to be on the list directly.
Authors and administrators can see which users received a publication and which of them viewed it. That view shows whether the message reached the intended group.
Running a campaign in stages
Campaigns are built for employee communication on Employee Center Pro, rather than customer marketing. Creating a campaign, creating its stages, and adding content through Content Experience Builder require sn_ca.campaign_manager. Users selected in the campaign Approvers field have sn_ca.campaign_approver.
A campaign is built in the Content Experience Builder in this order. First, create the campaign and set its start and end dates. Second, create the campaign stages. Third, add content to each stage, either from the Content library or as new content. Fourth, preview the campaign to see how the audience will view it. Fifth, click Publish when the campaign is ready. Afterward, check that the audience targeting reaches the intended people.
Stages do two jobs. They control when content is available and for how long. They also refine the audience. One stage can be aimed at managers and another at direct reports, so each group receives the message written for its role. Each stage’s content is made available on the employee portal for the stage’s date range or trigger. For more on the employee portal, see the Employee Center guide.
A stage can use one of several triggers: immediate, fixed date, recurring, to-do completion, dynamic (a field in the HR profile or user table meets a condition), or condition (an advanced option for Employee Journeys that needs a business rule or script).
Some limits affect planning. The Content Experience Builder does not currently create rich content, so rich content is built in the Rich Content Editor in the Content library and then added to a stage.
Before publishing, compare the campaign audience with the audience on each stage and confirm the delivery location. A correct employee group does not by itself establish which portal page, topic, or widget should carry the message. Preview the content where employees will encounter it, then check the targeting after publication.
For help planning this work, see ServiceNow implementation.
Defining who qualifies with HR criteria
HR criteria defines the audience for HR content, services, or cases. HR criteria groups people with a condition builder that works on any table.
Each condition names a table, an optional user column, and a condition that pairs a field with a value. Conditions combine with And, where all conditions must match, or Or, where a single match is enough. After a condition is saved, a link shows the number of matching records, which is a quick way to test the criteria before relying on them. As an example, on the HR Profile table, selecting the home country as United States of America selects employees whose home country is the United States.
HR criteria is used in several places. It filters the content employees see in the Employee Center. It filters which HR services a subject person can request during case creation or transfer. It decides when a lifecycle event activity triggers for the subject person. It selects the document template for an HR case, and it selects users when bulk HR cases are created.
To open it, go to All > HR Administration > HR Criteria. The role required to manage it is sn_hr_core.admin. When the User table is selected in a condition, the user column becomes mandatory, because leaving it empty can cause false positives.
Using audience records to control visibility
An audience record defines the conditions that users must meet before they can view content. Each audience is built from one of five sources: Users, User Criteria, HR Profiles, HR Criteria, or an uploaded file. The HR Profiles and HR Criteria sources are available in HR Service Delivery only.
To create an audience, go to All > Content Publishing > Re-usable Components > Audiences, then select New or open an existing record. After you set conditions on an audience, a link shows how many users match. Select it to see the matching people. Creating audiences requires the sn_cd.content_admin role, or the sn_cd.content_manager role while the Allow Ownership for Audiences property is set to No.
The upload option expects a file of user names or email addresses. The header of the first column must be user_name or email. If the Allow Ownership for Audiences property is set to Yes, two extra lists appear, Restrict audience by user and Restrict audience by group, which narrow the audience further.
Audiences can target portal content or lifecycle event activities.
Keeping a campaign audience current
A campaign can continue running while employees change departments or become eligible for a benefit. Set Re-evaluate campaign when membership needs to follow current audience criteria. This exposes Re-evaluate frequency, measured in days. The Content Experiences: Update Campaign Audience scheduled job adds or removes users when it runs against those criteria.
Without that option, the audience update job runs once and the campaign audience is not subsequently refreshed. With it, the campaign frequency overrides the default frequency in the Content Experiences system property. Plan a check after the scheduled job runs; changing an employee record is not evidence that the campaign membership has already changed.
Questions about campaign operation
Why is an assigned content manager unable to create an audience?
Check the Allow Ownership for Audiences setting before adding more roles. When ownership is enabled, sn_cd.content_manager does not grant audience creation. Have an administrator review whether the ownership policy or the person’s assigned responsibilities should change.
What is needed before campaign analytics can capture results?
Set up and activate a tracking profile before using Content Analytics for the campaign. On the campaign, select Tracking on and choose the Tracking profile. Decide what employee action should count as success before interpreting the captured metrics.
Can I reuse an existing campaign’s structure?
The Clone campaign button copies the campaign, stages, and content. Review the resulting audiences, dates, and message text before publication so that copied settings fit the new communication.
Why are example campaigns missing from the builder?
Demo campaigns depend on demo data being loaded when the Content Experiences plugin is installed or upgraded. Ask the instance administrator to check that installation choice if you need the examples for learning or configuration review.