OBLYTECH Logo
OBLYTECH Logo

How to Create a ServiceNow Workspace in Workspace Builder

To create a ServiceNow workspace, add it in ServiceNow Studio or App Engine Studio, then use Workspace Builder to set its name, URL, user access and navigation. Then build the home page, lists and record pages. Your role decides where you can build, and a new workspace stays basic until those parts are in place.

Confirm your role and the Workspace Builder install

Workspace Builder needs a role that matches the environment you build in.

Where you build Role that can add and configure a workspace
ServiceNow Studio admin or Guided Application Creator
App Engine Studio (AES) sn_app_eng_studio.user or delegated_developer

A delegated developer holds more permissions than a standard user and fewer than an admin. Members of the App Engine Studio Users group receive the sn_app_eng_studio.user role automatically.

Workspace Builder is available on the ServiceNow Store, and checking your entitlements comes first. To install it, search for Workspace Builder in Application Manager on your instance and select Install.

Add the workspace from ServiceNow Studio or App Engine Studio

In ServiceNow Studio, go to All > App Engine > ServiceNow Studio, select the create icon next to the Navigator panel, and choose File. Select the User interface file type, then Workspace, Continue and Begin.

In App Engine Studio, go to All > App Engine > App Engine Studio, open your application from My Apps, and next to Experience select Add. Choose Workspace, then Begin.

The first form asks for a name, a description, a URL and roles. The name defaults to the application name, and the URL is built from it and can be edited. Grant at least one role. A custom role has to be created in Security first.

Select Continue, then choose a primary table, the table workspace users view or update, plus any secondary tables. Workspace Builder generates a record page for the primary table automatically. Select Continue, then Done.

Then open the workspace in Workspace Builder to add and configure its components. In App Engine Studio, select the additional actions icon next to the workspace and choose Edit.

Learn the three areas of the Workspace Builder screen

The left navigation panel lists the pages, components and building blocks you can add. The middle canvas is an inline editing space for the home page in workspaces created in AES after the Tokyo release. For lists and other pages, it previews the settings you make. The right configuration panel holds the settings for the item you have selected. Workspace-wide settings open from the Workspace settings link in the header, on a form with General and Record navigation tabs.

Set the General settings and note which ones are locked in

Open the General tab, fill in the fields and select Save. Some settings are set when you add a workspace and cannot be changed afterward, so review them before you leave the add form. Add user roles one at a time.

Field What it controls
Name The workspace name that users see.
URL The relative address after your instance URL. It is generated from the name, and you can customize the path in the field.
Description A brief statement of the workspace’s purpose.
User access The people and groups who can open the workspace. Leaving it empty gives unrestricted access.
Search configuration The source of search results. Pick an existing profile, or use the Edit search application link.
Show tables included in search configuration Displays the tables the workspace searches.
Workspace theme The visual style. The field appears when Polaris is not enabled, and the themes come from the UX Themes table.

Selecting an AI Search profile requires AI Search to be enabled on the instance. The profile lets users select several facet values at once, view parent documents with their linked attachments and download them, and gives the workspace dark mode.

Choose the navigation type and the tables for new records

The Record navigation tab sets how users move around and which tables receive new records. Tabbed navigation opens a separate tab for each page, so users can work on several records at once and create records from the navigation. Breadcrumb navigation requires building the workspace in UI Builder. For AES workspaces, tabbed is the default and cannot be changed after creation.

The Table setting identifies the table that receives new records, along with its associated lists. Tables chosen when the workspace was created appear automatically. Select Add a table to bring in another table. You can add each table only once. Removing a table uses its delete icon, and no confirmation appears, but Cancel reverts the deletion. The Label is the short name for the new record option, so it should say what kind of record gets created.

Customize the home page

The home page is the dashboard users see first. It cannot be hidden or removed. Editing it in Workspace Builder is available for workspaces created in the Tokyo release and later.

Select Add new element on the home page canvas. The menu offers data visualizations, filters, headings, images and simple lists. A Library element adds an already-saved data visualization. Drag an element to move it, drag its lower-corner handles to resize it, and select Save in the canvas header. A data visualization needs its source table set in its settings. Elements missing from the menu have to be added in UI Builder.

Elements placed on a home page tab stay visible while users move between tabs.

Build lists and filtered lists

Lists are where users find individual records. Turn a list on from the Navigation configuration tab: select List in the navigation panel, choose the list, and select Activate list in the configuration panel.

Next, select Add list category and enter a name and a description. If the workspace’s table is not a core table, you must add list categories for it.

Under each category, select Add filtered list, then name it and choose its table. Each filtered list applies its own conditions, so it shows only the subset of records you define. A Task category might hold separate filtered lists for opened, unassigned and closed tasks. Under Apply conditions, use the condition builder, set the sort order and select Apply filter. Under Manage columns, move columns from Available to Selected, drag them into order and select Apply. Select Save, then use the canvas refresh icon to update the preview.

Configure record pages and the contextual side panel

Each record page is tied to one table, and each table can be linked to one record page. AES generates record pages for the tables you chose at creation. To add another, select + Create new from the Record pages menu in the header, enter a name and a table, then select Create. A table your organization created must contain at least one new field, or its form and records cannot be created.

Default record pages are read-only, so create a page variant to change one. Within Workspace Builder, you change the contextual side panel and related items. The form is edited in Table Builder, opened from the Edit form link under Record details.

Under Related information, add related lists, such as child incidents, as tabs, and order them with the arrows. The related table must already exist.

Select Contextual side panel in the navigation panel to switch components on or off. Attachments and templates are on by default. Turn on the Ribbon component toggle to show ribbons such as Active SLA, which displays time remaining, the SLA state and any breaches. Custom right tab components have to be added in UI Builder.

Turn on analytics and preview the workspace

Analytics is optional. Select Analytics in the navigation panel and turn on the Activate Analytics Center toggle. The Analytics Overview gives users dashboards, data visualizations and insights for tracking records and usage, and it displays current, refreshed content.

To check the result, select Preview in the Workspace Builder header. The workspace opens in a new browser tab. There, select Edit to make basic home page changes in place, and select Exit Editing Mode when you finish.

When Workspace Builder hands off to UI Builder

Several situations move the work into UI Builder:

  • Workspaces created before the Tokyo release, or workspaces that need more advanced functionality, are edited in UI Builder.
  • A workspace created before the Tokyo release must have its home page edited in UI Builder.
  • A workspace without a home page or lists must be edited in UI Builder.
  • Complex configurations, and accounts without the full AES entitlement, must use UI Builder.
  • Breadcrumb navigation requires UI Builder.

Frequently asked questions

Which roles can set up a workspace?

The admin or Guided Application Creator role works in ServiceNow Studio. The sn_app_eng_studio.user or delegated_developer role works in App Engine Studio.

Can I change the navigation type after the workspace exists?

For AES workspaces, tabbed navigation is the default and cannot be changed after creation. Breadcrumb navigation requires building the workspace in UI Builder.

Can the home page be hidden or removed?

No. It cannot be hidden or removed, but its elements can be resized, moved and configured.

Can I add another table later?

Yes. Use Add a table on the Record navigation tab. Each table can be added once, and each table links to one record page.

When should I use UI Builder instead of Workspace Builder?

Use UI Builder for workspaces created before the Tokyo release, workspaces missing a home page or lists, breadcrumb navigation, and complex configurations.

Is analytics required?

No. Analytics is optional and is turned on with the Activate Analytics Center toggle.