ServiceNow shortcuts are key combinations that move you around the platform and run common actions without relying on a mouse. In the Brazil release, Control+/ on Windows or Command+/ on macOS opens a modal listing the shortcuts for the screen you are viewing. You switch shortcuts on in your own accessibility preferences, and Linux is not currently supported.
Turning keyboard shortcuts on in your user preferences
Shortcuts are controlled by a personal setting, so you do not need an administrator role to change them. Open the user menu, select Preferences, then select Accessibility. Select or clear the Enable keyboard shortcuts option to turn shortcuts on or off. The role required for this step is none.
When the preference is on, shortcuts respond and the shortcut list can be opened from the user menu. When it is off, shortcuts are not available. The preference exists to improve efficiency and productivity, and it suits users with mobility impairments, users who want faster navigation and people working in high-efficiency environments.
Reading the shortcut modal on each screen
Press Control+/ on Windows or Command+/ on macOS to open the shortcut modal. The shortcuts it lists are specific to the screen you are viewing. Keyboard shortcuts also depend on the browser and the operating system you use, and the Linux operating system is not currently supported.
The modal has a search field that searches the shortcuts available on the current screen. Entries are grouped into four categories: Page Action, Page Navigation, Global Navigation and General.
The Next Experience reference is split into four tables: common shortcuts, header menus, focus shortcuts and additional shortcuts. The sections below follow the same order.
Common shortcuts for everyday actions
These are the common combinations in the Next Experience interface, with their Windows and macOS keys.
| Action | Windows | macOS |
|---|---|---|
| Show the shortcuts for the current page | Control+/ | Command+/ |
| Compose an email | Control+Alt+e | Command+Option+e |
| Create a new record | Shift+Alt+n | Shift+Option+n |
| Favorite or unfavorite the current page | Control+Shift+f | Command+Shift+f |
| Impersonate a user | Control+Shift+i | Command+Shift+i |
| Open the instance landing page | Control+Alt+z | Command+Option+z |
| Open the instance toolbar to change domains | Control+Alt+t | Command+Option+t |
| Refresh the list | Shift+Alt+r | Shift+Option+r |
| Save the record | Control+s | Command+s |
Opening the header menus from the keyboard
Each header menu has its own combination. The Otto menu has two entries, one for text entry and one for voice input.
| Menu | Windows | macOS |
|---|---|---|
| All menu | Control+Alt+a | Command+Option+a |
| Admin menu | Control+Shift+a | Command+Shift+a |
| Favorites menu | Control+Alt+f | Command+Option+f |
| Help menu | Control+Shift+/ | Command+Shift+/ |
| History menu | Control+Alt+h | Command+Option+h |
| Workspaces menu | Control+Alt+w | Command+Option+w |
| Notifications menu | Control+Shift+k | Command+Shift+k |
| ServiceNow Otto menu, text entry | Alt+Shift+a | Option+Shift+a |
| ServiceNow Otto menu, voice input | Alt+Shift+v | Option+Shift+v |
| User profile menu | Control+Shift+u | Command+Shift+u |
Voice input is controlled by a user preference, and that preference appears only when the administrator has enabled ServiceNow Otto voice input for the instance. From the Zurich release, starting with patch 4, voice input is set under Additional chat features instead. The Yokohama release called the text-entry menu the Now Assist menu, with the same keys.
Moving keyboard focus to parts of the page
These shortcuts apply keyboard focus to one area of the page, so the next keystroke acts on that area.
| Area | Windows | macOS |
|---|---|---|
| Global search | Control+Alt+g | Command+Option+g |
| Main content of a page | Control+Alt+p | Command+Option+p |
| Breadcrumb navigation | Control+Shift+c | Command+Shift+c |
| Side navigation page | Control+Alt+1 | Command+Option+1 |
| Workspace tab | Control+Alt+2 | Command+Option+2 |
| Page tab | Control+Alt+3 | Command+Option+3 |
| Record tab | Control+Alt+4 | Command+Option+4 |
| Contextual sidebar | Shift+Alt+x | Shift+Option+x |
| Activity Stream compose text field | Shift+Alt+c | Shift+Option+c |
| First action button | Shift+Alt+t | Shift+Option+t |
| First field in the form | Shift+Alt+f | Shift+Option+f |
| First tile in the Activity Stream | Control+Alt+x | Command+Option+x |
Control+J moves focus forward through the major elements of the page, and Control+Shift+J moves it backward. Shift+Alt+H moves focus through the headings of the form.
Additional shortcuts for lists, the Agent inbox and email
This last group opens tools and panels. List search (Shift+Alt+S) and list filter (Shift+Alt+B) open the two list tools directly.
| Action | Windows | macOS |
|---|---|---|
| Open the Agent inbox | Shift+Alt+i | Shift+Option+i |
| Open the sidebar discussions chat | Shift+Alt+d | Shift+Option+d |
| Open the list search | Shift+Alt+s | Shift+Option+s |
| Open the list filter | Shift+Alt+b | Shift+Option+b |
| Open the OpenFrame window | Shift+Alt+z | Shift+Option+z |
| Cycle through the page layouts | Shift+Alt+l | Shift+Option+l |
| Expand or collapse the resizable pane | Shift+Alt+p | Shift+Option+p |
| Reply to the most recent email correspondence | Shift+Alt+e | Shift+Option+e |
Changing key combinations on your own profile
Open User Menu, select Keyboard shortcuts, then select Remap keyboard shortcuts. Find a shortcut by scrolling the list or by entering text in the Search field.
A pencil icon marks each shortcut that can be changed; system-defined shortcuts cannot be. Select the pencil, enter the new key combination and select the check mark to save it. You do not need to delete the old combination, because entering a new one replaces it. A new combination must include at least one modifier key, such as Ctrl, Command or Alt. If the combination is already in use, the system displays a notification.
Restore Defaults returns all remapped shortcuts to their original keys after a confirmation dialog. Changes apply to your user profile and persist across sessions.
Core UI shortcuts in the classic environment
The classic environment has its own table of shortcuts. Core UI is the name for working in the classic environment with Next Experience switched off, and Core UI shortcuts use access keys. Access keys depend on your browser and operating system, so you press them together with another alphanumeric or navigation key. Available shortcuts are based on the UI version, and if a combination does not respond, a different access key may be needed for your browser and operating system.
| Action | Windows | Mac |
|---|---|---|
| Activate the global search field | Alt+Ctrl+G | Control+Option+G |
| Toggle the application navigator | Alt+Ctrl+C | Control+Option+C |
| Activate the navigation filter field | Alt+Ctrl+F | Control+Option+F |
| Impersonate a user | Alt+Ctrl+I | Control+Option+I |
| Navigate to the main content on the page | Alt+Ctrl+P | Control+Option+P |
Keyboard shortcuts are enabled by default in Core UI. To switch them off for yourself, open User menu, select Preferences, select Accessibility, and clear the Enable keyboard shortcuts option.
Administrator controls for turning shortcuts off or changing them
Both controls sit in the User Administration area and need the admin role. Administrators use the User Preferences table to decide which shortcuts are available to users and what their key combinations are. That covers switching shortcuts off for all users, switching off individual shortcuts and changing key combinations.
To disable keyboard shortcuts for all users, open All, then User Administration, then User preferences. Search for glide.ui.keyboard.shortcuts.enabled, make sure the System check box is selected, change the value to false and select Update. To disable one shortcut, search for its preference name, such as glide.ui.keyboard.shortcuts.main_frame, and change its value to false.
To control which shortcuts are available, open All, then User Administration, then User Preferences. Select Name in the search bar and type *keyboard, which returns every user preference with keyboard in the name. Setting glide.ui.keyboard.shortcuts.allow_in_input_fields to true lets users run shortcuts while they type in a field. To disable any of the shortcuts below, change its value to False. The shortcut-specific preferences include:
| Preference | Shortcut it controls |
|---|---|
| glide.ui.keyboard.shortcuts.main_frame | Move keyboard focus to the main content, Ctrl+Alt+P |
| glide.ui.keyboard.shortcuts.global_search | Move keyboard focus to the global search bar |
| glide.ui.keyboard.shortcuts.impersonator | Open the impersonator window |
| glide.ui.keyboard.shortcuts.navigator_filter | Move keyboard focus to the filter in the application navigator |
| glide.ui.keyboard.shortcuts.navigator_toggle | Toggle the application navigator open or closed |
A preference whose name ends in key_combo sets the key combination for that shortcut.
Email shortcuts for response templates and drafts
Workspace email has typed shortcuts that need the email_composer role. Open a workspace record, then open either the mini email composer or the full composer. The mini composer opens from the Compose section, where you select the Email tab. The full composer opens from the More Actions icon, where you select Compose Email.
In the email body, type /r to view response templates, /d to view drafts or /e to view email templates. Type a keyword after the shortcut to search, then select the action or press Enter.
Frequently asked questions
Do I need an administrator role to turn keyboard shortcuts on?
No. The role required for the Enable keyboard shortcuts preference is none. Open User Menu, select Preferences, select Accessibility and select or clear the Enable keyboard shortcuts option. Administrators decide which shortcuts are available to users and can switch them off for all users, as set out in the administrator section above.
Why does a shortcut do nothing on my screen?
Confirm the preference first, because with Enable keyboard shortcuts off no shortcuts are available. Then check your browser and operating system, since they determine the keys, and note that Linux is not currently supported. In the classic environment, the Core UI access keys apply instead, and a different access key may be needed for your browser and operating system.
Can I change a key combination?
Yes, for shortcuts that show a pencil icon. Use Remap keyboard shortcuts, select the pencil and enter a combination that includes Ctrl, Command or Alt. System-defined shortcuts cannot be changed. Restore Defaults returns remapped keys to their original values.
What happens if a key combination is already in use?
The system displays a notification. Choose a different combination with at least one modifier key. Entering a new combination on a shortcut replaces the one it had before, so you do not need to delete the old key first.