OBLYTECH Logo
OBLYTECH Logo

Digital signatures and e-signature in ServiceNow workflows

ServiceNow handles digital signatures through a native e-signature plugin. A signer can type or draw a signature, confirm their login credentials, or acknowledge a managed document or knowledge article. A separate control, Approval with e-signature, makes an approver re-enter credentials before a change request changes state. This page covers activation, templates, approval controls, the Docusign connector and HR acknowledgments.

Turning on the e-signature plugin

Activation starts with the plugin com.snc.esign. An administrator with the admin role opens All > System Applications > All Available Applications > All, finds the plugin with the filter and search bar, and selects Install. The plugin includes demo data and activates related plugins if they are not already active.

With domain separation and delegated admin enabled, the administrative user must be in the global domain.

Activation also installs two roles and two tables.

Component Name and identifier Purpose
Role E-signature administrator (sn_esign.admin) Manages the e-signature module
Role E-signature manager (sn_esign.config_manager) Manages e-signature configurations
Table E-Signature Configuration (sn_esign_configuration) Holds e-signature configuration
Table E-Signature Acknowledgement (sn_esign_acknowledgement) Holds acknowledgment records

Assign these roles to the people who will build templates.

Building an e-signature template

A template defines what the signer reads and how they confirm it. Users need the sn_esign.admin or sn_esign.config_manager role. Open All > E-signature > E-signature template and select New or an existing record. The form fields are below.

Field What you enter
Name A label for the template
Task table The task table the template is associated with
Document type Knowledge article or managed document. The matching field then names the specific item the signer will sign
Signature type Acknowledgment, Credential or Signature
Acknowledgment text An optional check box with text the signer must select before signing completes. It works with any signature type and is limited to 1,000 characters

The signature type sets how the signer proves agreement. With Signature, the signer types or draws a signature. With Credential, the signer confirms their login credentials. With Acknowledgment, the signer accepts the document by completing the task. A policy that needs confirmation of reading suits Acknowledgment. A contract that needs the signer’s own name on the page suits Signature.

After you submit the template, use it in task forms to request signatures from users.

Requiring credentials on change approvals

Approval with e-signature is delivered by the plugin com.glide.e_signature_approvals, which lets approvers approve or reject a record by re-entering their login credentials. It requires the admin role to activate, and the Code Signing Signatures plugin (com.glide.code_signing.signatures) must be installed first. The feature is validated against Title 21 CFR Part 11 electronic signature requirements, and the plugin is required for compliance with that regulation.

When an approver selects Approve or Reject, an Approver Authentication dialog opens before the state changes. That dialog appears for the list context menu options, the Approve and Reject UI actions on the form, and a change of the State field to Approved or Rejected. If the credentials fail, the approval stays unchanged. The system checks credentials against local user records or an active single sign-on integration, so credentials have to be set up before you turn the feature on.

Each signature stores the printed name of the signer, the date and time, and the meaning of the signature, which is approval or rejection. These go into the record’s activity stream and audit history as field changes on the Approval record.

By default the Change Request (change_request) and Standard Change Proposal (std_change_proposal) tables are supported. Adding a table means approvals on it need e-signature authorization.

Credential sources and SAML

Credentials can come from local User (sys_user) records or from a remote identity provider reached through Multi-Provider Single Sign-On (SSO) with SAML 2.0. For SAML 2.0 update 1, e-signature adds three properties to the SAML2 Update1 Properties table, including an assertion consumer index that defaults to 1. Life science customers using e-signature should deactivate the User self-lockout prevention business rule.

Connecting Docusign as a signing channel

When the signature has to happen in Docusign, a third-party service, the Docusign eSignature spoke carries the result back into a ServiceNow flow. It needs an IntegrationHub subscription and depends on the REST action step (com.glide.hub.action_step.rest), the IntegrationHub runtime (com.glide.hub.integration.runtime) and the Flow Designer dynamic inputs (com.glide.hub.dynamic_inputs). The spoke was built for Docusign eSignature API version v2 or v2.1 and may work with later versions. The latest spoke version is 4.5.2.

A flow can send a document from a ServiceNow attachment or a Docusign template to one recipient or a list, pause until it is signed through a webhook, and attach the completed envelope to a ServiceNow record for audit.

Setup needs a Docusign account, administrator credentials and a configured Docusign application with its client ID, integrator key, secret keys and RSA keypairs. The Flow Designer support for the Service Catalog plugin (com.glideapp.servicecatalog.flow_designer) must be active. Choose one authentication method.

Method Where it is configured What the administrator records
JWT grant System Definition > Certificates, then System OAuth A Java Key Store certificate, a JWT signing key under JWT Keys, and a JWT provider under JWT Providers
Authorization code grant Workflow Studio, Integrations tab, Outbound connections A connection with a name, connection URL, API version (default v2.1), authorization and token URLs, OAuth client ID and secret, and the OAuth redirect URL, then Configure and Get OAuth Token

Sandbox and production environments use different authorization and token endpoints. If you connect several Docusign accounts, create a child alias for each one. At runtime the system selects the alias that matches the account. Docusign REST calls can run on the instance or, optionally, through a MID Server.

The inbound trigger needs the system property glide.oauth.inbound.client.credential.grant_type.enabled set to true, an application registry for external OAuth clients, and an activated inbound trigger in Workflow Studio. Activating it generates the callback URL, which goes into a custom connect configuration in Docusign.

The spoke ships with two sample flows: Send a Document for Digital Signature, and Send employment offer to candidate using Docusign template. Each starts from a catalog item, which you activate under All > Service Catalog > Maintain Items. To customize a flow, copy it into a new application scope.

Acknowledgment checkboxes on HR documents

A check box with custom text states what the signature means, such as review, approval, responsibility or authorship. The option covers the E-Signature and Sign Document task types, and Credential acknowledgments. HR documents linked to HR tasks can carry the check box in three ways:

  1. From an HR task, add the task to an HR case, set the HR task type to E-Signature, and select an e-signature template. It applies to that one task.
  2. From an HR task template, select the HR task table and task type, attach a document if needed, and enter the acknowledgment text. The check box then appears each time that HR service is requested. A Sign Document task needs a PDF on the parent HR case.
  3. From an HR document template, enter text in the Acknowledgment text field. The check box appears whenever the document is associated with an HR case, for both HTML and PDF templates.

HR Document Templates is deprecated. Starting with the Brazil release, it is no longer supported or available for new activation. Document Templates is the replacement.

Turning e-signature off

Plugins cannot be removed, but e-signatures can be disabled. Go to System Definition > E-Signature Registry and set Enabled to False on any table that no longer needs them.

Frequently asked questions

Which signature type should I pick for a simple acknowledgment?

Pick Acknowledgment. The signer accepts the document by accepting and completing the task, and no typed or drawn mark is needed. Choose Signature when the signer must produce their own name or drawing on the document.

Who can build an e-signature template?

Users with the E-signature administrator role (sn_esign.admin) or the E-signature manager role (sn_esign.config_manager) can create and modify templates. Assign those roles to the people who need them.

Why does an approver get a credential prompt when they approve a change request?

The Approval with e-signature plugin requires the approver to re-enter their login credentials before the state changes. The plugin is validated against Title 21 CFR Part 11 electronic signature requirements. If the credentials fail, the approval stays unchanged.

What is recorded when someone signs an approval?

The printed name of the signer, the date and time of the signature, and whether it meant approval or rejection. These are stored in the record’s activity stream and audit history.

Can a flow wait for a Docusign signature and then continue?

Yes. The Docusign eSignature spoke can pause a flow until the document is signed, using a webhook. This needs an IntegrationHub subscription, one of the two authentication methods, and the inbound trigger. The completed document can be attached to the ServiceNow record.

For a step-by-step view of connecting ServiceNow and Docusign on this site, read the ServiceNow and DocuSign Integration Guide.