OBLYTECH Logo
OBLYTECH Logo

Workforce Optimization for CSM: Forecasting and Scheduling

Workforce Optimization for Customer Service combines demand forecasting, shift planning and schedule management in one manager workspace. Demand Forecast turns contact history into agent counts at 15, 30 and 60-minute intervals, and managers publish schedules that agents can see on the team calendar. Time-off and shift-swap requests then move through defined approval steps.

How Demand Forecast turns contact history into staffing numbers

Demand Forecast shows agent staffing at 15-, 30- and 60-minute intervals on the team calendar, beside the coverage already scheduled. Contact volume for cases and interactions is forecast at 15-minute intervals from historical records, and resource conversion formulas turn that volume into agent counts.

Slots are color-coded. Red marks an understaffed slot, yellow an overstaffed one, and green a slot where staffing matches demand. Gray marks a slot that needs no staffing. Take the 07:00 to 07:15 slot, where demand is nine resources and coverage is eight. It is one agent short, so it appears red and displays 9 and -1. Moving that agent’s break from 07:00 to 07:30 fills the slot, which turns green.

Setting up the data behind a demand forecast

Setup starts with a Data Collection Definition, which names the records to collect from cases, interactions or any other table, using conditions and a date field. An index on that table, built on the same date field and conditions, is part of the procedure.

Three background jobs move the data. A daily scheduled job collects the previous day’s records for each 15-minute interval and each assignment group, and stores them in MetricBase, the time-series store. An on-demand job, Collect historical data, pulls 15-minute data for the past three years. A scheduled job named Forecast resources for future produces the staffing forecast and writes it to the Agent Forecast metric.

Collected series are kept at one-hour intervals for three years. Daily-interval forecasts keep history for 1,098 days, and anything older than three years is cleaned up and cannot be saved. Once the historical job has run for a definition, the Is historical data collected flag is set to true, so back-dated records added later will not trigger a new historical collection.

Formula parameters hold a fixed value or a script, in hours, minutes or absolute numbers, and the application ships with defaults such as Average Case Work Time and Average Chat Work Time. A resource conversion formula turns the forecast and parameters into an agent count at each interval, and the Group Forecast Configuration module attaches it to assignment groups. Each group takes one configuration, while a configuration can serve several groups. The MetricBase plugin, com.snc.clotho, must be enabled first.

Roles control each step. The sn_agent_forecast.admin role is needed to forecast agent numbers for a shift, sn_agent_forecast.user covers staff alignment analysis, and forecast parameter and adjustment work also needs sn_csm_wfo_workspa.manager.

Adjusting a forecast before it goes live

Forecast parameters set the period length, the periods to forecast and the interval, which is 15, 30 or 60 minutes or daily. The default algorithm is Seasonal Trend Loess. A manager can forecast up to 28 days ahead at the 15, 30 and 60-minute intervals, and up to 365 days ahead at the daily interval. History is shown alongside, 14 days for the short intervals and four weeks for daily, and system properties adjust both windows.

A forecast starts as a Draft, which can be previewed before anything is published. Publishing sets it to Published, and the forecast job then uses it. One forecast is in the Published state at a time, so publishing a new one makes the earlier one inactive. The team calendar reflects a published forecast after that job runs, and an administrator can run the job on demand.

Manual adjustments cover known events the history does not show. Each has a start and end date-time and a unit, either Percentage or Number. A percentage of 15 raises the forecast by 15%, while a number of 15 adds 15 to it. The value applies to each group. Two groups of two agents with an adjustment of 15 in Number units give 17 each, a total of 34. Adjustments pass through Draft and Ready to Publish before the forecast job applies them. End Now stops an active adjustment early.

A midweek national holiday with an expected rise in sales could be handled with a 10% increase for the affected period, overlaid on the original series.

Building shift and schedule plans

Scheduling runs from the Schedule icon in the Manager Workspace. A shift plan takes a name, a time window, a time zone, start and end times and the days it applies to. Selecting Use agent time zone takes each agent’s time zone from their user record.

A schedule plan takes a name, a start date and an end date, and is saved with Save schedule before shifts are added. Work shifts are added with an event type, then agents are assigned. Publishing moves the schedule to Published so agents can see their shifts, and a published schedule can be unpublished, edited and published again.

Moving agents between shifts needs a move-agents feature that an administrator enables. A manager picks the source shift, the target schedule and shift, the agents and effective dates, and can choose to return them afterwards. The option appears for published schedules that have not ended. A Move Request record is created before the change runs, so the history survives a partial failure.

Breaks, on-call rotations and shift sign-up

Breaks belong to a shift. Each has a name, a duration, an earliest start and a latest end. With an 11:00 to 15:00 window, a one-hour break and four agents, the scheduler staggers the breaks across the four so the shift stays covered.

On-call shifts take a name, a group, a time window, a time zone, the days they apply to and a rotation start date. A scheduler then creates the rotation and adds agents.

A manager can enable Request Agent Signup on a schedule plan and set a deadline. Agents then sign up for the shifts they prefer, and a shift an agent has ranked as a top preference is auto-assigned when auto-assignment is enabled for that shift.

Time off, shift swaps and approvals

Agents request time off for the span they need and can swap a shift with a peer. The team calendar shows who is scheduled for coverage and who has taken time off.

A peer swap has two steps. The requesting agent names a colleague who can work the shift. The colleague approves or rejects it under My Approvals in the Agent Workspace. An approval moves the request to the manager’s approval queue.

Managers approve or reject time-off and shift-swap requests from the mobile application, where each request arrives as a notification.

A manager can also swap a shift directly from the shift pop-up, choosing the agent who will work it. This route skips approval.

Checking staffing alignment on the team calendar

On the Team Calendar tab in the Manager Workspace, selecting Day shows a Total resources needed row for the chosen day, giving the forecast demand for the number of agents at each selected interval. Colored slots show whether scheduled agents are below, above or equal to that demand. Week and month views carry a Total coverage/demand row, where a downward arrow means the forecast sits below the agents needed that day, an upward arrow means it sits above, and a checkmark means they match.

Measuring schedule adherence and syncing with Outlook

Clock-in and clock-out events, generated as presence status changes, feed the reports. Adherence measures how closely an agent follows the schedule. Conformance compares time at work against the scheduled time, calculated as minutes worked in the shift plus overtime, divided by scheduled shift minutes. By default, adherence above 70 and conformance between 80 and 120 are the target range, and agents outside it are highlighted in red. An administrator can change these thresholds.

Managers view the Time Worked Summary and Time Attendance from the Schedule Adherence list. The summary shows time clocked in outside scheduled events, which catches a training session an agent forgot to clock out of. Managers can also modify clock-in and clock-out times.

Managers and agents can sync their calendars with Microsoft Outlook. An administrator installs the Microsoft Exchange Online Spoke, sets sn_wfo_outlook.enable_outlook_sync to true, and adds the users’ email IDs in the User table. The setup requires Graph API permissions that include Calendars.ReadWrite and Calendars.ReadWrite.Shared. Agents can then synchronize their team calendar and events with Outlook.

Frequently asked questions

How far ahead can a manager forecast staffing?

A manager can forecast up to 28 days ahead at the 15, 30 and 60-minute intervals, and up to 365 days ahead at the daily interval. The start date is the current date.

How does a manager account for an event the history does not show?

The manager creates a manual adjustment with a start and end date-time and either a percentage or a fixed number. It is overlaid on the forecast, applied to each group, and used once it is published and the forecast job runs. End Now stops it early.