OBLYTECH Logo
OBLYTECH Logo

Workplace Reservation Management in ServiceNow: Setup Guide

Workplace Reservation Management lets employees book meeting rooms, conference rooms, desks and other reservable workplace services from the portal. Setup covers installing the application, recording buildings, floors, areas and spaces, grouping them into reservable modules, then adding views, purposes, access rules, quick-booking slots and check-in behaviour.

Before you install: prerequisites and record order

Install the application from the ServiceNow Store. It requires the Workplace Service Delivery – Core plugin (sn_wsd_core) at version 2.0 or later, so check that plugin under Subscription Management first. Install any dependencies listed under System Applications before the application itself.

Booking features depend on companion applications such as Workplace Core, Workplace Central, Workplace Space Management and Workplace Case Management. For the wider service picture, see the Workplace Service Delivery overview, and for how the workflows connect, the workplace service delivery workflows article.

Record the buildings, floors and areas your site uses. Spaces are added under Administration, then Workplace spaces, by a user with the sn_wsd_core.admin role, and each space can be assigned to an area so employees can browse by area.

Building reservable modules

A reservable module groups similar items so they appear under one category on the portal, such as meeting rooms, conference rooms and other rooms in a room module. Open Administration, then Reservable Module, and set a name, an inline title, a display order, an active flag, an active-from date and an image.

Choosing what the module returns

Selection type decides the result layout. Specific unit shows each item. Container shows groups, such as one entry per area, with a quantity available. For a location-based module, set the reservable type to Location and point the table at the Space table and its extended tables.

When a filter targets a location, set Active and Is reservable to True. Without those conditions, inactive items that cannot be reserved appear as available.

The bookable quantity of a container comes from the Capacity column on each space record, and a container can be booked as many times as the combined quantities of its spaces allow.

Limits that shape a booking

Setting Default Effect
Max days in future Unrestricted when unset Blocks dates beyond the value; recurring series cannot run past it
Max number of occurrences 180 Caps the length of a recurring series
Max days for multi-day 1 A value of 0 is rejected; above 1 the All day option is disabled on the reservation portal
Max number of days for browse near a person 7 Limits colleague-based search; cannot exceed Max days in future
Time increment 30 minutes Set through the time_picker_interval_size widget property

Override approval policy can follow the space setting, require approval or remove the requirement. Apply to shift enables shift-based bookings, which do not support recurrence.

Views, purposes and access rules

Reservable views decide how items are shown: card, map or schedule. Create a view under Administration, then Reservable Views, and complete Name, Label, Application, Icon class name and Active. DXF floor maps are not supported.

A view reaches employees once it is attached to a module. Card and schedule views are attached by default until switched off, and display order is set on the Reservable Module View Configuration record.

Purposes describe how an item is used, such as quiet rooms or collaboration rooms. A user with the sn_wsd_rsv.manager role creates the purpose, and its description stays internal. The purpose is then added to a space or room through its Reservable Purposes related list.

User criteria decide who can see a module. Create a record under Administration, then User Criteria, and attach it to the module through the User criteria related list.

Quick Reservation time slots

The Quick Reservation widget on the Workplace Service Portal home page lets an employee pick a time slot instead of typing start and end times. Create slots under Administration, then Reservable Time Slots, and attach each slot to a reservable module whose Available in setting includes Quick reservation.

Check-in, check-out and automatic cancellation

On the module, set Override check-in policy to require check-in, tick Cancel reservations exceeding check-in time, and enter a Time before employee can check-in value, such as 10 minutes. Two properties control timing: sn_wsd_rsv.time_before_check_in_out_reminder sets when the host reminder email is sent, in minutes (default 30), and sn_wsd_rsv.time_when_reservation_cancelled_without_check_in sets when an unchecked booking is cancelled (default 30).

The Check-in/out reminder job runs every 30 minutes. Take a booking that starts at 5 PM with a 5 minute reminder setting. The check runs at 5:05 PM and reads the Space Occupancy table. The result depends on the sensor:

  • Space occupied: the booking checks in automatically, moves to In progress, and the employee gets a push notification saying no further action is needed.
  • Space unoccupied or the reading is invalid: the employee is asked to check in and confirm, or to release the booking.
  • No reading and no check-in, with cancellation enabled: the booking is cancelled.
  • No reading and no check-in, without cancellation: the booking moves to Confirmed, and the Reservation daily tasks job closes it at the end of the day.

Unchecked bookings are cancelled after the time set in sn_wsd_rsv.time_when_reservation_cancelled_without_check_in, which defaults to 30 minutes (only where cancellation is enabled on the module).

Occupancy readings come from a third-party provider, such as the Metrikus spoke, and are held in the Space Occupancy Data table. The stale-time property sets how old a reading can be before fresh data is requested; the example value is 30 minutes. For a broader view of how facilities work is organised, see the facilities service management workflow article.

Check-in and check-out do not work for reservations spanning multiple locations, and group reservations are checked in one person at a time.

Virtual meeting links and floor map display

Microsoft Teams needs the Teams Communications spoke for meeting links and the Teams Graph spoke for recordings, with Azure authentication and OAuth. Zoom needs the Zoom spoke and an Integration Hub action for recordings, with the redirect URL allow-listed and meeting and recording scopes granted. The sn_wsd_rsv.meeting_provider property sets the provider.

To show who booked a space on a floor map, set sn_wsd_core.floor_plan.portal.show_reservation_details to true and enable the Show name option in Map view.

How employees book a space

Employees open Employee Center, then Workplace Services, then Browse all Workplace Services, and select New general Reservation. The role needed is sn_wsd_core.workplace_user. Browse all is the default path; the others are browse near a person, browse by area, browse by neighborhood and browse all spaces. The Employee Center guides cover the portal itself, and the plain-language introduction to Employee Center is a good starting point.

Browse near a person ranks spaces by proximity, checking the colleague’s floor plan coordinates first, then the area, then a tag, and falling back to the whole floor.

Dates beyond Max days in future cannot be selected, and an invalid date beyond that limit resets to the current date. Past dates cannot be chosen, and an end time cannot fall before the start time on the same day. My favorites first is selected by default on Browse all and Browse by area searches.

Recurring bookings

Recurring patterns are daily, weekly and monthly. Specify the number of days and the number of times the reservation repeats, and for weekly series select the days of the week. A series cannot be edited in bulk.

Services, groups and shifts

Employees can request extra services while making a reservation. They are not available for recurring reservations, and each extra service requested creates a workplace case. A group reservation books several spaces for different people, creating one reservation per person under a parent record; invitees cannot be added to it.

A shift reservation is searched by building, type, shift schedule, start date and recurrence.

Reservation states and recurring conflicts

Awaiting approval means the request is waiting on an approver. Confirmed means the space is booked, and New Space sits beneath it when the application has moved the booking. Conflicted means an occurrence could not be placed. In progress appears once check-in has run. More HR service delivery guides sit in the HR service delivery hub.

Conflicts mostly affect recurring series, because only the first occurrence’s availability is checked at booking. With auto-resolve on, the application looks for a replacement space: the space closest in capacity on a floor map (then one with more capacity, then one with less), or one in the same area or on the same floor when there is no floor map. Favourites come first, and the employee is notified. A resolved occurrence is marked Exception.

If no replacement is found, the occurrence stays Conflicted, and the employee uses the Actions menu on the summary page to change that occurrence, cancel the series or share the reservation.

Does a desk-reservation count show how many people are actually in the building, and what must be fixed before reservation data supports space decisions?

No. A desk-reservation count shows how many bookings exist for a space or time window, not how many people are in the building. Bookings include no-shows and recurring occurrences, and they miss anyone who arrives without booking. Before the data supports space decisions, check-in must be enforced, occupancy readings wired in, and floor and capacity records corrected.

What a booking record actually says

A booking holds a start time, an end time and a state. Confirmed marks a space as taken for that slot, while a booking moves to In progress only after a check-in.

Where a booking count overstates presence

  • No-shows. Without cancellation on the module, an unchecked booking moves to Confirmed and stays in the day’s data until the daily job closes it.
  • Recurring series. Each occurrence is handled separately, so a weekly pattern adds an entry every week.
  • Group reservations. Each person holds a reservation under a parent record, so a report counting both levels counts each person twice.
  • Multi-location bookings. Check-in does not work across multiple locations, so these bookings cannot reach In progress.

Where a booking count understates presence

A booking count cannot see use that happens without a booking, because it only counts reservations. Sensor readings are recorded as occupied or unoccupied, which shows whether a space is in use, not how many people are in it. Confirm the sensor output before any report uses headcount wording.

What to fix before the data supports space decisions

  1. On each module that feeds a decision, turn on the check-in requirement and the automatic cancellation option for that module, so unchecked bookings close out.
  2. Compare the stale-time property with sensor reporting frequency. Each sensor must report inside that window, or its readings will routinely go stale before the next one arrives.
  3. Choose one unit per report: spaces in use, checked-in bookings or people. Never add them into one total.
  4. Audit the Capacity field on every space record, because it sets the bookable quantity that limits how many bookings a container can take.
  5. Check floor plan coordinates and area assignments, since browse-near-a-person ranking uses them first.
  6. Agree the purpose and retention period for occupancy and badge data before storing it. Badge data kept without a stated purpose is hard to justify later.

What to test in a short pilot

Pick one floor and record a manual headcount at the same times each day for a representative run of working days. Set it beside bookings, checked-in bookings and sensor-occupied spaces for the same window. The largest gap shows which fix to start with.

Ask the implementer to confirm in writing the definition of each booking state, whether closed bookings remain in report data, how often each sensor reports, and how invalid readings are handled.

Frequently asked questions

Which items can employees reserve?

Meeting rooms, conference rooms and desks, plus any reservable workplace service an administrator has added to a module.

What is the difference between a reservable module and a reservable view?

A module groups similar items into one category. A view controls how those items are displayed, as card, map or schedule, and takes effect once it is attached to a module.

What happens if an employee does not check in?

It depends on the sensor and the cancellation setting. An occupied space checks the booking in automatically. With no reading and cancellation enabled, the booking is cancelled; without cancellation, it moves to Confirmed.

Can a recurring reservation be edited in one go?

No. A series cannot be updated in bulk, so each occurrence is edited separately. Extra services and shift-based recurrence are not supported for recurring bookings.