Unified Navigation is the header bar in ServiceNow’s Next Experience interface. It runs across the top of the page and holds the module filter, the All menu, favorites, history, workspaces, global search, the scope picker, notifications and the user menu. Which items appear depends on each person’s access and on admin customization.
Where the header sits and why it matters
In practice it is not a separate application you open from somewhere else. It is the control strip across the top of the page, so routes to modules, records, workspaces and preferences stay in one place. The Australia and Brazil releases list the same core header items.
Using the filter to reach a module, list or form
The filter field at the left of the header is the quickest way to reach a module. It tolerates missing letters, so a partial name still returns matches. In the Yokohama release, a system property sets how closely an entry must match; its default is 75, and 100 requires an exact match.
Two shortcuts work in the same field. A table name followed by .list opens that table’s list view, for example sys_properties.list. A table name followed by .do opens a form, for example sys_user.do. Both go straight to the page without opening the All menu.
By default the filter searches all menus except History. If a page you visited recently does not come up as a filter result, open the History menu instead, because History is excluded from filtering.
What the All, Favorites, History, Workspaces and Admin menus hold
The All menu lists all menu items and modules in the instance. Its refresh icon loads the latest items without clearing the cache.
Favorites holds the workspaces, classic environment pages and records you have marked. In the Australia release, a favorite can be renamed, given a different icon and colour, and placed in a folder structure. The contextual app pill shows where you are in the instance, and its star icon favorites the page on screen.
History lists your activity across the instance, which helps when you remember a page but not its name.
Workspaces lists the workspaces you can access. It appears when workspace access is available. If you have a single workspace, its name appears in the header in place of a menu. The Admin menu gives access to items for administrative functions.
Scope, update sets and instance tools
The Globe icon selects two scopes: the scope of the instance and the scope of update sets. The Update set option lets you choose the current update set, and a plus icon creates a new one. Changing it requires the admin role in the Australia release.
When you change your application scope, the system switches the current update set to that application’s default update set. You can choose a different one from the Update set list, and a check mark confirms the selection. Any application scope other than Global shows a red circle on the Globe icon.
Show instance tools is turned on by creating the system property glide.ui.next_experience.instance_tools_disabled and setting it to false. This places the application scope and the current update set in a row beneath the other tool icons, and it hides the Globe icon while it is on.
Searching from the header
In the Australia release, the search field handles two jobs. Entering a term and selecting View results, or pressing Enter, opens a results page. That page reports the total number of matches and previews results from each searchable table. A View all link for a table opens all of its matches and appears only when that table has more matches than the preview limit shows. A return link takes you back to the page where you started.
Exact matches work differently. Enter a record number without pressing Enter, and a preview tagged Exact Match appears. Selecting it opens the record directly, skipping the results page.
When the field is empty, it lists your recent searches and your recently viewed results. If you have access to search in workspace applications, an arrow at the right of the field switches between global results and results inside a workspace. An exact match opens in the workspace you selected.
The user menu and the admin items in it
The user menu holds personal and session controls: Profile, Preferences (display, accessibility, notification and Workspace settings), and Keyboard shortcuts, which opens with Command+/ on a Mac or Control+/ on Windows.
Administrators also see Impersonate user, which lets them act as another authenticated user for testing and review impersonation logs.
Elevate role marks a role as an elevated privilege role, so its rights are not available straight after login. Users who are granted the admin role cannot elevate to a privileged role; only the base system admin can elevate.
Notifications, Help and the other header tools
The notifications menu gathers the notifications that apply to you in one place. The Help menu holds Get help and What’s new, with a blue dot for new updates, and Provide Feedback sends comments about the current page to ServiceNow.
The Australia release also lists ServiceNow Otto, a panel that summarises records, chats, cases or incidents, offers help, and creates resolution notes. An administrator configures it in the AI Admin Hub console.
Setting up custom menus for users
An administrator can build a custom menu for a group. In the Australia release, go to All, then Unified Navigation Menus, and select New. The form takes a Name, a Menu Active check box, an Order, and an Application scope that defaults to Global. Hidden Roles and Visible Roles control who can see the menu.
To add items, open the menu from the Unified Navigation Menus list and select New. Each item has a Menu it belongs to, a Type of Application or Module, the application or module chosen, an application scope that defaults to Global, and an Order. If a new menu does not appear, check that Menu Active is marked, then refresh the instance.
Adding and ordering workspaces in the Workspaces menu
In the Australia release, go to All, then Now Experience Framework, then Experiences, and open the application. In its related lists, open the UX Application Category M2Ms tab and select New. That button appears when you have access to the selected application. Set the Experience Category to Workspace, keep the Application at Global or choose another, pick the workspace as the UX Application, and submit. Refresh the browser to see it in the menu.
The Order field on that form is enabled once the system property glide.ui.next_experience.workspace_sorting exists. In the Yokohama release, set that property to Order, enter sys_ux_registry_m2m_category_list.do in the filter, open the workspace record, enter a number in Order and select Update. The lowest number appears first.
System properties that control the header
These properties switch parts of the header on or off and tune its behaviour.
| Property | Default | What it controls |
|---|---|---|
| glide.ui.polaris.experience | true | Turns the Unified Navigation experience on for the platform |
| glide.ui.polaris.menus | true | Shows or hides the menus in the header; the release recommends hiding menus from specific roles when a menu is not wanted |
| glide.ui.polaris.global_search | true | Shows or hides the search field in the header |
| glide.ui.polaris.nav_filter_accuracy_score | 75 | How closely a filter entry must match; 100 requires an exact match |
| glide.ui.polaris.history.url.param_blocklist | [“tinyId”] | URL parameters ignored when duplicate History entries are removed |
| glide.ui.polaris.dark_themes_enabled | true | Enables dark theming |
Keyboard shortcuts in the Next Experience interface
Open User Menu, then select Keyboard shortcuts. In the Yokohama release, selecting Remap keyboard shortcuts makes the list editable, and no admin role is required.
Find a shortcut by scrolling or typing in the Search field. A pencil icon marks shortcuts that can be remapped, and not all shortcuts can be customized yet. Select the pencil, press the new combination and accept it with the green check mark. A shortcut needs at least one modifier and one letter, such as Command+K. Restore Defaults returns each remapped shortcut to its original value after a confirmation prompt.
Frequently asked questions
Is Unified Navigation a separate application?
No. It is the header bar of the Next Experience interface and runs across the top of the page. Its menus, filter and search are the controls that move you around the instance.
How is the filter different from global search?
The filter takes you to a module, list or form, and it tolerates missing letters. Global search takes a term and returns matching records from several tables on a results page, grouped by source. Typing a table name followed by .list or .do reaches that list or form directly.
Why might a menu or workspace be missing for someone?
What the header shows depends on user access and admin customization, so an item one person sees can be hidden from another. The Workspaces menu appears when workspace access is available, and an administrator can hide a menu from specific roles.
What does the red circle on the Globe icon mean?
It means the current application scope is something other than Global. Selecting the Globe icon shows the instance scope and the update set scope, and it is where you create a new update set.
Can I change the keyboard shortcuts?
Yes, for shortcuts marked with a pencil icon. Open User Menu, select Keyboard shortcuts, choose Remap keyboard shortcuts, and enter a combination with at least one modifier and one letter. Restore Defaults reverts the changes.