Service Observability (sn_sow_svcobs) is the ServiceNow application that displays external monitoring metrics for a service alongside its configuration item records in the Service Operations Workspace. External monitoring metrics are attached to the configuration items that make up a service, then shown to operators in that workspace. The Service Observability application delivers this: an administrator installs it, connects a vendor, and maps that data to services.
What the capability covers
Service Observability first appeared in the Yokohama release. It pulls metrics from the monitoring tools a team already runs and places them beside the CMDB records for the same service, so an operator can see application, infrastructure and network health for a service without switching tools. The practical payoff is a shorter mean time to resolution, because the operator can see the hosts and databases behind a service next to the service itself.
How the data is grouped
Entities fall into four categories. Application covers the service. Compute covers the hosts it runs on. Databases covers the database instances it uses. Networking covers the network devices the service uses. Each category has its own dashboard.
Installing the application
The install requires the system admin role. Confirm that the application and its ServiceNow Store dependencies carry valid entitlements, and read the store listing for licensing and release compatibility first.
Go to System Applications, open All Available Applications, and search for sn_sow_svcobs. If it is missing, it may need to be requested from the store. Choose a version, review the dependencies in the installation dialog, follow any prompts to obtain extra entitlements, and select Install. The install adds plugins, store applications, roles and tables, including the Service Observability UI, which provides the Overview and Observability tabs.
Connecting a data source
Go to Service Operations Workspace, then Configurations, then Service Observability, then Data sources. Select the vendor and complete the Add connection form. You can reuse an existing HTTP or HTTPS connection and credential, or create new ones. The saved connection is the one you pick later when you build a mapping.
The Australia release supports the vendors in the table below, along with MetricBase.
| Vendor | Credential type and what to supply |
|---|---|
| AppDynamics | OAuth 2.0: client ID, client secret, token URL, account name |
| Azure Monitor | OAuth 2.0: client ID, client secret, token URL, subscription ID |
| Amazon CloudWatch | AWS access key and secret key |
| Datadog | API key and application key |
| Dynatrace SaaS Classic | API token with entity and metric read scopes |
| Dynatrace SaaS Grail | Platform token with metric and bucket read scopes |
| Dynatrace on-premise | Environment-scoped API key and the MID Server name |
| LogicMonitor | Access token |
| New Relic | Account ID and API key |
| Prometheus, SolarWinds, Zabbix | Basic auth, plus the MID Server name |
| Splunk Enterprise | Bearer token |
| Splunk Observability | Access token |
| Cisco ThousandEyes | API key |
The connection address also varies: CloudWatch needs the region you monitor, Splunk Observability needs your realm, and Zabbix needs the server’s IP address. Zabbix also needs a MID Server, and that MID Server must be in an active state.
Mapping services to observability data
Go to Service Observability, open Configure Data mappings, and select Create mapping. Name the mapping so that its source is obvious to the next administrator. The service selector offers the top 30 recommended services, ranked by business criticality and by alert, incident and SLO activity over the past 90 days. You can also filter the full list. A service takes one mapping, so decide the grouping first.
Writing the tag rule
A rule has a data source, a tag key and a tag value. Both the key and the value are case-sensitive, and both must match the tags in your observability metadata. The value can be a literal string, such as a service name, or a variable such as the service placeholder, which lets one rule cover several services. When the key represents a service, the value field offers configuration item fields as variables.
Here is an illustrative case, not a real deployment. Take a billing API that runs on three hosts and writes to one database. If every metric from those entities carries a billing-api tag value, mapping the billing API configuration item to that tag brings the host and database charts into its Observability tab.
Exceptions and testing
Where an entity type uses a different tag, open the Exceptions card and give that entity type its own data source, key and value. The data mapping form allows for this kind of split, for example when database metrics carry a different tag key from the rest of the service’s metrics.
The preview panel tests the mapping against the first mapped service and lists the entities it finds, with results shown per source when exceptions exist. If the results look wrong, change the key or value and test again. Save the mapping, and the Observability tab on the Service Details page shows the matching dashboards.
Monitoring views on the Service Details page
The Overview tab shows reliability metrics from Service Reliability Management next to the observability metrics. The observability part includes rate, error and duration figures, plus open alerts, incidents and change requests from the configuration management database. The impacted systems chart lists services that appear on the service map, and the SLO error budget chart needs objectives configured in Service Reliability Management.
When an Overview metric looks unhealthy, the Observability tab gives the extended picture: host and database metrics drawn from your mappings. The usual path is to spot the issue, read the overall health, open the Observability tab, and then identify the owner of the entity lower in the stack who will start remediation.
Using MetricBase
MetricBase needs less setup. Select it as the source in the mapping, and the application finds hosts, databases and network devices through CMDB relationships without any tag rules. Until you add MetricBase charts, the dashboards show ServiceNow-native charts. To add one, duplicate the certified template so that the original stays intact, add a line visualization, attach a MetricBase monitorable item as its data source, configure the query, and save.
Customizing templates and variables
Dashboards come from vendor-specific templates. A template change affects the dashboards of each service that uses the same data source. The application saves a copy of the original on customization, and default dashboards carry a Certified tag. Charts can also show problem and business app records, MetricBase data, Splunk Enterprise data and, from version 1.10, Health Log Analytics logs.
Queries can use template variables so that one query serves many entities and the selected time window.
| Variable | Returns |
|---|---|
| ENTITIES_HOST | Metrics for the selected host |
| ENTITIES_MYSQL | Metrics for the selected MySQL instance |
| ENTITIES_POSTGRESQL | Metrics for the selected PostgreSQL instance |
| ENTITIES_SERVICE | Metrics for the selected service |
| ENTITIES | Metrics for the selected entity |
| START_TIME and END_TIME | The start and end of the selected range |
From version 1.10, any tag key used in a mapping can also serve as a variable. Amazon CloudWatch uses slightly different variables, covered in the advanced query topic.
Chart error messages point to specific fixes. A missing mapping needs one created. Authentication failure means the connection or its credential needs attention. No results means no metrics matched the selected entity. “Something went wrong” means the connection succeeded but the vendor did not respond, which can come from a timeout on the vendor side.
Running the AI analysis skills
Two generative AI skills read dashboards on your behalf. The analyze service health skill reviews the dashboards for a service, including charts not on screen, and reports insights and general health. The analyze dashboard skill summarizes one dashboard. Both must be activated before anyone can run them.
On a service record, select Analyze service at the top right. The result badge reads Analysis when no insights were found, shows an insight count, or reads Analysis unavailable. The analysis stays available for an hour and does not refresh automatically. After five minutes or a change in time period, it warns that it is out of date. The skill handles up to 50 images, excludes dashboards with more than 10,000 points, and works best on periods under 48 hours. It does not rank insights by their impact on an alert or incident, so the operator still makes that call. Once activated, it also runs automatically from the Investigate tab during incident investigation.
Roles and release history
The admin role, sn_sow_svcobs.admin, configures sources, mappings and templates. Operators and operations managers need membership in a user group of the srm type to see the full data set. Domain separation is supported at a basic level, and users see data inside their own domain.
Yokohama introduced the application with Dynatrace and New Relic as the first APM sources. From version 1.6.4, templates became customizable and services no longer needed activation. Datadog and business service mapping followed in version 1.7.3. Zurich added SolarWinds, CloudWatch, Azure Monitor and Splunk Observability, and version 1.10 added AppDynamics and Prometheus.
Frequently asked questions
Do I need an external monitoring tool?
Yes, unless your metrics live in MetricBase, which is also supported as a source. The mapping names one source, and an exception can point an entity type at a different one.
Who can connect a source and build a mapping?
The sn_sow_svcobs.admin role handles both. Installing the application requires the system admin role.
Why does a mapped service show no data?
Read the chart’s error message first. Tag keys and values are case-sensitive, so a capitalization mismatch can leave a chart empty. Check the tag key and value in the mapping against your observability metadata.
Does the AI analysis change my dashboards?
It builds its own optimized view of the charts for the analysis. Its results remain in the badge for an hour, and you rerun it to refresh them.