OBLYTECH Logo
OBLYTECH Logo

OT Change Management in ServiceNow: Models, Playbooks, Approvals

ServiceNow’s Operational Technology Change Management application offers a Basic change model without approvals and an Advanced model with approvals. Your choice sets the playbook stages and whether reviewers are involved. Apply a model in Guided Setup, then raise changes from the Industrial Workspace, an OT device, an incident or a remediation task.

Changes to OT devices can affect production, so OT change requests are managed per site, and users see the requests that belong to their own sites, and requests at other sites depending on their roles. For a sector view of the same operational technology work, see the utilities operational technology page. For the wider operations product set, start at the ITOM overview for IT operations teams.

Choosing between the Basic and Advanced models

The first decision is whether a change needs a sign-off before anyone touches a device. The Basic model runs the change process without approvals. The Advanced model runs with approvals: an approval change policy is attached, and an approval group reviews the request before implementation starts.

Aspect Basic model Advanced model
Approval None Approve stage with named reviewers
Playbook stages Initiate, Plan, Implement, Close Initiate, Plan, Approve, Implement, Post-implementation Review, Spin-off Tasks, Close
Approval policy Not applied Included; teams can create their own

Applying a change model in Guided Setup

A model must be applied before anyone can raise an OT change request. The role required is sn_ot_change_admin or admin.

  1. Open Industrial Workspace Admin and go to Guided Setup.
  2. In the Operational Technology Change Management category, select Get Started.
  3. Next to the Change Models section, select Configure.
  4. Select the model that fits your organisation.
  5. Edit the model record as needed.

When the step completes, the model is applied and OT change requests can be created.

Walking a Basic change through its playbook

The Basic playbook has four stages, and each holds fields the team completes as the change moves forward.

Stage What the team records
Initiate Short description, description, category, site, watch list, work notes list. Priority (impact and urgency), Risk and Impact (effect on industrial processes). Requested by, Assignment group and Assigned to.
Plan Justification, implementation plan, risk and impact analysis, backout plan (how to reverse the change in place), test plan, and the planned start and end dates.
Implement One task, Perform the change, marked complete once the change is made on the targeted OT devices and finished.
Close Close code (reason the record was closed) and close notes.

The backout plan is worth writing before scheduling, because it defines how the change is reversed in place if necessary. The Scheduling Assistant can fill the planned dates from an open downtime slot on the calendar, which suits a line that has a fixed stop window. For the general idea behind planned windows, see change window explained.

Two assignment rules matter. The assignment group must be of type OT. And when the assignment group changes, the Assigned to field clears, so the new owner has to be chosen. For how assignment groups work across the platform, see assignment groups explained.

What the Advanced playbook adds

The Advanced playbook keeps Initiate and Plan, then inserts an Approve stage before work starts, adds an Ensure LOTO task to implementation and a safety check to the post-implementation review, and adds Post-implementation Review and Spin-off Tasks stages.

The Approve stage has one task. A reviewer shown on the task form selects Approve or Deny and records the reason in Comments.

The Implement stage has three tasks: Stop the function, completed after the targeted OT devices are halted if that is needed; Ensure LOTO, a lockout procedure that prevents machinery from starting by accident during maintenance or service, marked complete when that procedure is finished; and Perform the change.

The Post-implementation Review has four checks: electrical, network, quality and safety. Each is ticked when that check is done. The review can also create additional OT change tasks for remaining work and records when the lockout is revoked. The Spin-off Tasks stage then lists all the change tasks from the review that must still be completed.

Approval requirements and the approval flow

Approval applies to the Advanced model. The Basic model has no change approval policy.

Requirement What it means
Site level The site or area where the change takes place
Site approval group Members who can review and approve change requests
Role required Approvers hold the sn_ot_change_read role
Percentage of approvals 51 percent of the approval group must approve before the change moves forward

On creation, the platform invokes the flow from the change model, applies the change approval policy, evaluates the decision records, runs the matching approval definitions, and adds the site-level approvers to the change record. For how flows like this are built, see the Flow Designer overview. Teams that need different rules can create their own policy and add approvers manually to the group.

A reviewer can edit the request as necessary before approving it. Keep group membership current, because the 51 percent threshold is calculated from it.

Roles and visibility across sites

Change models are records, and roles decide who uses them and who manages them.

Role and site role Access to change models
sn_ot_change_write with editor, viewer or viewer-all site role Use a model for their own records
sn_ot_change_write with no site role No access
sn_ot_change_read, any site role or none No access
sn_ot_change_manager with editor or viewer site role Create, edit, delete, assign and remove models for any site
sn_ot_change_manager with no site role Cannot view or edit site models; can only view base system models not tied to a site
sn_ot_change_admin Create a change request for any site using a change model

A writer with no site role finds no models, so the site role must be granted alongside the write role.

Starting a change request from four places

Change requests can be raised from the Industrial Workspace, and the chosen model’s playbook then guides the work.

An OT device record is the second route. From the All OT Devices list, open a device, go to Related Records, open the OT Change Requests related list and select New. Site or business service and OT Device fill in automatically. The OT Device field fills only when Industrial Process Manager is enabled. Equipment model entity fills only when Industrial Process Manager is enabled and one entity is linked to the device; with several entities the field stays empty.

The third route is an OT incident. Select Create OT Change on the incident, choose the model and create the record. Site, Equipment Model Entity, OT Device (CI), short description, description and priority carry across. Priority 1 to 4 stays the same, and an incident priority of 5 becomes 4 on the change.

The fourth route is a remediation task, which requires sn_ot_change_write or sn_otvr.remediation_owner. If no model is active, the user sees an error asking them to contact the OT Change admin, so confirm a model is applied before remediation owners rely on this path.

Change tasks and notifications

A change often splits into steps for different people. A user with sn_ot_change_write opens the change record, finds the Change Tasks related list and selects New. Each task holds a short description, description, OT device, parent change request, state, type, assignment group, assigned user and watch and work-note lists. An empty assignment group means automatic assignment. Users find their tasks under OT Tasks > Assigned to Me, Assigned to My Groups or Unassigned.

Email notices follow the same events. Assignment changes notify the assignee and the assignment group. Comments reach the requester and the watch list, approval and rejection reach the assignee and group, and a hold reaches the requester. Assignment notices include the site, OT device, equipment model entity and description.

Installing the application and its prerequisites

An admin installs the application from All > System Applications > All Available Applications, searching by name or by the ID sn_ot_chg_mgmt. Two plugins must be active first: CMDB CI Class Models (sn_cmdb_ci_class) and ISA Equipment Model (sn_isa_model). The install also needs at least one store application, either Operational Technology Manager, which creates the foundational data and relationships for OT, or Industrial Process Manager, which creates the ISA-95 equipment model data foundation. Entitlements for the application and all its associated store applications must be valid.

Teams that have not yet brought OT devices into the platform should work through the OT discovery connection steps first, because device details feed the creation routes above. For the wider discovery setup, see ITOM discovery. For the CMDB side of OT devices, see OT visibility in the CMDB.

Frequently asked questions

Which change model should a team choose first?

If the change needs a sign-off before work begins, choose Advanced, which adds an Approve stage and an approval policy. If it does not, Basic moves the change through planning and implementation without approvals.

Who can apply a change model?

The role required in Guided Setup is sn_ot_change_admin or admin. Users who write change requests need sn_ot_change_write and a site role to use a model.

Why does a user see no change models?

A writer with no site role has no access to change models, and a reader has no access in any site role. Granting the write role with an editor, viewer or viewer-all site role gives access.

What does the 51 percent rule mean?

The change moves forward once 51 percent of the site approval group has approved it. The group’s membership sets how many approvals that requires.

Why is the equipment model entity empty on a new change?

A device linked to several entities leaves the field empty. It fills automatically only when one entity is linked and Industrial Process Manager is enabled.