The hardening compliance score is the percentage that ServiceNow Security Center uses to show how closely your instance matches the recommended values for its security-related system properties and plugins. You read it in the security configuration console. Raising it means working through non-compliant settings, starting with the ones that carry the highest score impact.
Where Security Center fits
Security Center is a free ServiceNow Store application. It has been installed by default since the Vancouver release, and a new version is published to the Store each quarter, between family releases. Its predecessor, Instance Security Center, reached end of sales in September 2024 and can no longer be activated. Use the navigation paths on this page for Security Center.
The landing page gathers the main tools in one place: My Security Tasks, an instance summary, access management findings, a machine identity area for service accounts and third-party integrations, three security consoles and a Tools section. New modal windows within Security Center explain what each tool does and how it helps you reach your security goals, which suits newer and infrequent users. From Security Center 3.2 in the ServiceNow Store, the Security Center Admin role (sn_vsc.security_center_admin) grants admin-level access to Security Center consoles and tools without the full admin role.
Reading the security configuration console
Go to All, then System Security, then Security Center, and select the Security configuration console in the Security Consoles section. A navigation bar switches between three areas.
| Area | What it shows |
|---|---|
| Security hardening | The compliance percentage and its history over time |
| Security scanner | Results of automated checks for misconfiguration, vulnerabilities and inefficiencies |
| Customer Actions | The number of available security updates and their due dates |
The security hardening cards open the Security hardening page. Its three subsections, listed along the left edge, are All settings, Hardening compliance score trend and Hardening score comparison. An Update score button recalculates the score on demand.
How the compliance score is calculated
Each hardening setting carries a risk score from 0 to 10. For the access control concepts that sit alongside instance hardening, see access control lists explained. The compliance score is the sum of risk scores for compliant settings, divided by the sum of risk scores for all settings, multiplied by 100, and rounded up to a whole number.
A worked example shows the arithmetic:
| Quantity | Value |
|---|---|
| Sum of risk scores for compliant settings | 25.4 |
| Sum of risk scores for all settings | 34.9 |
| Unrounded result | 72.7 |
| Reported score | 73 |
Two consequences follow. A non-compliant setting adds its risk score to the total without adding it to the compliant side, so a high-risk setting left non-compliant pulls the score down further than a low-risk one. A setting that becomes compliant lifts the score in proportion to its risk score, so the settings with the largest risk scores shift the total by the greatest amount.
Each setting also shows a score impact as a percentage. It indicates how much the setting affects your security posture, which makes that column the one to sort by when you want the biggest gains first.
The score recalculates automatically on the first of each month and after Security Center is installed or reinstalled. Update score runs a calculation at any time, so you can check the effect of a change without waiting.
Severity and the layout of each setting
Each setting has a security risk entry based on the CVSS scale of 0.0 to 10.0.
| Severity rating | CVSS score range |
|---|---|
| Critical | 9.0 to 10.0 |
| High | 7.0 to 8.9 |
| Medium | 4.0 to 6.9 |
| Low | Above 0 up to 3.9 |
| None | 0.0 |
The configuration details follow a fixed layout: overview, configuration name, configuration type (for example a system property), data type, recommended value, default value, category, security risk, dependencies, functional impact and references. Read the functional impact field before you change anything, because it describes how the setting affects operation. Some configurations are completed by Customer Service and Support, and the setting marks them as such. Others need several properties and plugins changed together before the setting shows as compliant.
Working through non-compliant settings
The procedure requires the admin role. For how ownership of security changes can be arranged between teams, see the governance model guide. Work through it in this order:
- Go to Hardening, then All settings.
- Filter the Compliance Status column to non-compliant settings.
- Review the Score Impact column, which shows how much each setting affects your security posture as a percentage, and start with the largest values.
- Open each setting and read its details.
- Make the setting compliant, changing each property or plugin its configuration area lists.
- Return to the Security hardening page and select Update score to see the new value.
The detail page for a single setting shows priority as a number from 1 to 4, where 1 carries the heaviest weight. Keep that number separate from the CVSS severity ratings when you rank work.
Plan each change before you touch a property. For a structured way to run that check before any production change, see the testing and acceptance checklist. Assess the impact of hardening changes in a non-production instance first, confirm that the instance still behaves as expected afterwards, and involve staff who can judge the security consequences. A setting can be technically compliant and still break an integration or workflow that someone depends on, so test those flows. If a change needs someone outside your role to carry it out, use the +Create task button on All settings or on an individual setting. It creates a Security Task that completes the matching Customer Action, which keeps the work visible in My Security Tasks.
Filters, trends and score comparison
A saved filter keeps your review consistent between sessions. Open Show filter panel, choose Advanced view, build the filter, select Save Filter and name it. You can share it with Everyone or a specific group, and recipients also need Security Center permission. The Use existing filter button in Advanced View loads it again. This procedure also requires the admin role.
The trend view shows whether the score is moving the right way. For the other measures worth tracking alongside it, see KPIs and metrics that matter. Use the date picker to choose a range, then the Chart options button to add targets, thresholds (a defined normal range for scores, with an alert when a certain event occurs), forecasts and other analysis elements. The All Records table lists the collection date, the score and the number of non-compliant settings for each run, which is useful for exact figures in a report.
The score comparison page takes an Older date and a Recent date. A card compares the two scores as percentages. Charts group the settings whose status changed by priority and by security area, and a list shows each one. Settings that became non-compliant appear there too, which makes this the quickest way to explain a drop after an upgrade or a batch of changes.
Settings outside the score and baseline changes
Hardening settings are organised into baseline versions. Each baseline adds new settings and sometimes removes others, with release notes covering baselines from 1.0 through 9.0. Baseline versions align with family and store releases, so an upgrade can change which settings count toward your score even when your configuration has not changed. Check the baseline notes before assuming a setting was broken.
Some security properties sit outside the hardening baseline. For the mistakes teams often make with these controls, see common instance security and access control mistakes. The property sn_impact_common.whitelisted.url_HTML_injection, a string list in System Properties, controls which domains may appear in hyperlinks inside description fields of the Impact Workspace module. It is not part of the baseline, it does not appear on the hardening pages and it does not change your score. An empty value removes all hyperlinks from those fields, and links to domains not on the list are removed too. The property sits in the Validation, sanitization and encoding category with a severity score of 4.4, which is Medium. Only domains you trust belong on that list, because links to domains not on it are removed from those fields.
Keeping the score in a healthy range
Aim to raise the score by making non-compliant settings compliant where the change is safe for your instance. Test each change before you rely on it. For how these checks fit into an ongoing review, see the best practices guide.
The security posture console complements the score. Its Best Practices section shows how many best practices exist and how many you have applied, with a chart over time. Its posture dashboards show active integration accounts, active privileged accounts (users given extra roles such as High Security Settings or Import) and users who have never logged in. Reviewing those counts alongside the hardening score gives a fuller picture than either number alone.
Frequently asked questions
How often is the hardening compliance score recalculated?
It recalculates automatically on the first of each month and after Security Center is installed or reinstalled. Update score runs a calculation at any time.
Which role do I need to change hardening settings?
The filtering and settings procedures list the admin role. From Security Center 3.2 in the ServiceNow Store, the Security Center Admin role (sn_vsc.security_center_admin) grants admin-level access to Security Center consoles and tools without the full admin role.
Why can the score move after an upgrade if I changed nothing?
Baseline versions add and remove hardening settings, so the score is calculated over a different set. Compare your two dates on the score comparison page and check the baseline notes for the version you moved to.
Does a score of 100 percent mean the instance is fully hardened?
No. The score covers the settings in the hardening baseline. Properties outside the baseline, such as the Impact Workspace link property, do not change the score and need their own review.
What should I check before changing a setting?
Read the functional impact field, confirm whether the setting needs several properties or plugins changed together, and assess the change in a non-production instance first. Then confirm that the flows people depend on still work.
For the wider set of instance controls, the instance security and access control guide covers the design around them.