Connect Chat is the messaging feature inside ServiceNow for direct conversations, group conversations and conversations attached to a single record. It requires Core UI and is not available in Next Experience, although some of its functions can be reached from the Sidebar there. Administrators control whether the Follow button appears on task forms and which tables allow record conversations.
Three conversation types share one interface
Connect Chat supports three conversation types. A direct conversation pairs two people. A group conversation brings three or more people into one thread. A record conversation belongs to one task record and starts when someone follows that record. The types share an interface but store messages differently, and that difference matters when someone reviews the record later.
Record conversations keep comments and work notes in step
A record conversation follows a rule the other two types do not share: its messages are comments or work notes, the two entry types a form already uses. Comments and work notes added to the record appear in the conversation in real time, and comments and work notes written in the conversation appear on the record. Attachments follow the same path. A file attached in the conversation is also attached to the underlying record.
The conversation also becomes a record feed in Live Feed, and the reverse holds. In practice, someone who opens the record weeks later sees the discussion alongside the rest of its activity, instead of having to find an email thread that explains a decision.
By default, a message typed in a record conversation is saved as a work note.
Following a record starts a conversation
The Follow button and its menu
Record conversations start from the form header of a task. Clicking Follow adds you as a member of the record conversation and relabels the button Following. Joining and opening are separate steps. A plain click joins without opening, and the conversation can then be reached from the Connect sidebar. To open it at once, click the down arrow on the Follow button. The menu offers Open Connect Mini, which opens a mini window, and Open Connect Full, which opens the workspace.
Choosing a comment or a work note before sending
Click the message type icon beside the text entry field, select Comment or Work Note, and then type the message. The icon appears in record and support conversations, not in direct or group chats. Select Comment before typing when a message should appear as a comment on the record.
The sidebar, mini windows and the workspace
The Connect sidebar
The sidebar is the main entry point. It is collapsed by default and opens from the toggle icon in the banner frame, on the right edge of the interface. Its chat view lists your current conversations, offers a filter tool and includes a button for starting a new one. A number beside a conversation shows its unread messages.
Mini windows
A conversation opened from the sidebar appears in a mini window. Its header holds the icons for adding people, viewing the record, opening the workspace and closing the window. Closing a mini window leaves the conversation in the sidebar with its history intact.
The Connect workspace
The workspace is the full-screen view. Its sidebar sits on the left edge, a conversation pane shows the selected conversation, and a conversation tools area sits alongside. To reach it, go to Collaborate > Connect Chat, use the new window icon in a mini window, or choose Open Connect Full from a record’s Follow menu.
| Tab | What it shows |
|---|---|
| Info | Record details for record conversations, related records and links, each shown when it holds content |
| Record | A compact form view of records created from a support conversation |
| Knowledge Base | A compact view of the knowledge homepage |
| Members | Conversation members, with add and remove controls for group and record conversations |
| Attachments | Files shared in the conversation, with an Add Attachment control |
| Notification preferences | Alerts for the current conversation |
Turning on the Follow button and the Live Feed icon
Two settings decide whether a task form offers the Follow button. The table’s Live feed attribute must be true, and the system property glide.live_feed.task_header_button must allow the button. For tables that extend Task, the Live feed attribute is true by default, so the property is usually the setting to check.
The property takes four values. None hides both the Live Feed icon and the Follow button. Live feed shows the icon alone. Both shows the icon and the Follow button. Collaboration is the default, and with it the Follow button is available while the icon stays hidden in form headers. Setting the property to both brings the icon back. It sits under Collaborate > Administration > Properties.
To add record conversations to another table that extends Task, add a Live feed attribute set to true in the Attributes related list of the table’s Collection dictionary entry, reached from the list view through Configure and then Dictionary. With glide.live_feed.task_header_button set to both or live_feed, the show Live Feed icon appears in the form header. The admin role is needed for each step.
Turning record conversations off
There are two routes, and they reach different scopes. To remove the Follow button from task forms throughout the instance, set glide.live_feed.task_header_button to live_feed. This keeps the Live Feed icon but removes Follow.
To turn off record conversations for one table, set that table’s Live feed attribute to false in its Collection dictionary entry. This also removes the Show Live Feed icon from that table’s form header. Both changes require the admin role.
Switching off Connect Chat and the Connect overlay
Two separate switches reduce what users see, and they do different things.
Connect Chat can be disabled completely. Set glide.connect.chat.disabled to true through sys_properties.list, reached from the navigation filter. The Connect Chat sidebar icon disappears, and a user who tries to open Connect Chat from the navigation pane receives a message saying Connect has been disabled.
The Connect overlay is the layer that sits over the standard interface. Clearing Enable Connect in the frameset, the collaboration.frameset property on the Properties page, hides the overlay and its toggle icon. Any conversations open in the overlay move into the workspace, and users work from the full-screen view. Turning the overlay off does not disable Connect Chat. The frameset property also affects Connect Support.
Email alerts for people who are offline
When a user is offline and a Connect message arrives, the system waits for the number of minutes set in collaboration.email_interval before sending an email. The default is 3 minutes. The email bundles the messages received during the interval.
To change the interval, go to Collaborate > Administration > Properties, locate the property for the number of minutes to wait before collecting unread messages, enter a number and save. The admin role is required.
Requirements, browsers and access
Connect Chat requires Core UI. If Next Experience is turned on, Connect Chat stops working, although starting with the Brazil release, certain functions can be reached through the Sidebar in Next Experience.
Supported browsers are the latest public release of Firefox or Firefox ESR, the latest public release of Chrome, Safari 9.1 and later, and Microsoft Edge version 90.
Access is controlled by the connect.roles property, a text value that names the roles allowed to use Connect. A blank value means no role is required. Connect Chat does not replace legacy chat, and the two should not be used at the same time. For the wider platform context, see Instance Security and Access Control.
Moving from Connect Support to Agent Chat
Connect Support has been deprecated since the Utah release and can no longer be activated. Advanced Work Assignment and Agent Chat provide similar capabilities. The move has five stages, and each requires the admin role.
- Activate the Advanced Work Assignment and Agent Chat plugins.
- Review the existing Connect Support chat queues and decide which ones to recreate for the Chat service channel.
- In AWA Home, configure the Chat service channel, create its chat queues and establish agent work assignments.
- In Agent Chat settings, open the Chat Setup form, choose Agent Workspace as the fulfiller interface for live chat and enable the other live chat features you need.
- Activate the chat client on the end user Service Portal.
Existing queues cannot be carried across. Connect Support queues sit in the Chat Queue table, while AWA queues sit in the AWA Queue table, so each queue is recreated for AWA.
A chat that stays in routing without reaching an agent often still points at Connect Support. The sign is an interaction assigned to the Virtual Agent user with no awa_work_item record behind it. A common cause is a Chat Setup entry for the chat’s application that is still set to Connect.
Frequently asked questions
Can Connect Chat be used in Next Experience?
Connect Chat is not available in Next Experience and requires Core UI. Since the Brazil release, some of its functions can be reached through the Sidebar in Next Experience.
What kind of message does a record conversation produce by default?
A work note. To send a comment, choose Comment from the message type icon before typing.
How long does an offline user wait before receiving an email?
The default wait is 3 minutes, set through collaboration.email_interval. The email bundles the messages received during that interval.
Which browsers does Connect Chat support?
Supported browsers are the latest public release of Firefox or Firefox ESR, the latest public release of Chrome, Safari 9.1 and later, and Microsoft Edge version 90.