The service catalog cart is shaped by four connected controls: cart layout records, the checkout model, search properties and the catalog home page. Administrators set each one from Service Catalog settings and cart layout records. This guide covers them in the order a catalog team usually reaches them, using the Brazil release as the reference.
Where cart layout settings live
Cart behavior is set on cart layout records. An administrator opens All > Service Catalog > Catalog Definitions > Maintain Cart Layouts, selects the widget or screen, and edits it there. The admin role is required for cart layout records.
Records fall into three families: cart widgets (the Shopping Cart widget and the Item Ordering Widget for order guides), preview screens (one-step, two-step and wish list carts) and the desktop order status screen. Classic Mobile records also exist for the Classic Mobile app, and this guide does not cover them.
Editing sections and labels
Each record offers sections for components, columns, buttons and button labels. Components covers items such as delivery times, item descriptions and prices. Columns controls which fields appear as table columns. Buttons selects controls such as Add to Cart, Edit Cart and Delete Item. Button Labels replaces the default wording. The sections on offer depend on the record.
A label change applies on each screen where that button appears, so renaming Continue Shopping changes it everywhere it shows. Leave the Target value at its default. Place a test order after saving.
Properties that override the layout
Some instance properties take precedence over a layout record. The glide.sc.price.display property, which controls when prices and subtotals appear in the cart, overrides the layout’s price settings, particularly on the order status screen. The glide.sc.allow.quantity property, which lists roles allowed to use the quantity selector, overrides relevant layout settings too.
Three older checkout properties are deprecated once cart layouts are enabled, because check boxes on the layout record have replaced them. Cloning during checkout moves to the Clone Checkout check box, the request item number moves to the Request Item Number column check box, and the two-step Back to Catalog option moves to its own check box. On upgraded instances, the Clone Checkout box takes the value the old property held, so verify it after an upgrade.
Item-level overrides and macros
Catalog items can carry their own settings. Add the Use cart layout check box and item fields such as Omit price in cart, No cart, No order and No quantity to the item form. Clearing Use cart layout reveals those fields for that item, and they win over the general layout. A layout can hide prices across the cart while one laptop keeps its price visible. Note each override before changing a layout, or an edit may seem to have no effect.
Column macros, under All > Widget Macros > Column Macros, set the horizontal arrangement of cart contents, and you can reorder, hide or deactivate them. Default macros cannot have their functionality edited, but they serve as a reference. Custom macros, written as Jelly scripts, are added from the cart layout record and do not affect upgrades. For the cart’s JavaScript methods, see the CartJS API guide.
One-step or two-step checkout
The one-step model is the default for catalog items. Checkout leads straight to the order summary or status screen. The two-step model adds a confirmation screen, where the requester can edit the order, choose a delivery location or upload an attachment before pressing Submit Order.
Catalog wizard orders default to two-step through the glide.expert.checkout.twostep property. A catalog offering both gives requesters two different cart experiences, so settle the model before you publish.
Turning on two-step checkout
Open Service Catalog > Catalog Administration > Properties and select Yes on the property Use the two step catalog checkout model (default false). The admin role is required. The Show the ‘Back to Catalog’ button on the two step checkout screen property defaults to Yes and gives a route back to the catalog; clear it to hide the button.
Changes to the Cart Preview Screen (Two Step) record show only while this property is enabled.
Delivery address and shipping fields
By default, the delivery address comes from the client script named set location. With two-step checkout on, that script places the requester’s formatted address in the Deliver to field.
On the two-step preview record, Shipping Location and Shipping Address cannot be enabled together. Shipping Address adds an editable Shipping address field. Shipping Location adds an editable Shipping location field plus a read-only Shipping address field.
Checkout form columns
The checkout form has a description column by default. Enabling Show the request item number for each line item on the checkout screen adds a number column. The Field name to use for the description column of the checkout form property, under Catalog Policy properties, can name another column in the Catalog Item [sc_cat_item] table. If it is blank, short_description is used. Choose a field that is filled in on your items, or the column will look empty.
Cloning one request for several people
Cloning creates up to ten copies of one request, each for a different user, such as one piece of equipment for several named people. To set it up, open Maintain Cart Layouts, select the Order Status Screen, go to the Components tab and tick Clone Checkout. In the Cart category of catalog properties, set the roles that can use bulk ordering. A blank role list lets all users bulk order.
On the checkout page, enter the extra users in the Copy this Request for reference fields, up to ten copies in total. A separate request is created for each user, and multi-row variable set data carries into every clone.
Search and navigation on the catalog home page
Search properties sit under Service Catalog > Catalog Administration > Properties. For what to do with the queries people type, see the portal search analytics article.
Restricting search and inactive categories
By default, anyone who can open the catalog homepage can search. The glide.sc.can_search property restricts this by role. A blank value lets all users search. Search results include inactive categories by default; setting glide.sc.search.disabled_cats to No keeps them out. This suits a category still being built. Security constraints can also hide an item that otherwise matches.
Order guides, record producers and wizard launchers hide the search field by default. The glide.sc.item.cannot_show_search property lists those class names. Removing sc_cat_item_producer from the list turns search on for record producers.
How keyword results are ordered
Keyword results are ranked by where the term appears. Item names rank first, then the item Meta field, then item descriptions and short descriptions. Category names and descriptions follow, and catalog names or item class values come last. The Meta field feeds Zing search, and when AI search is enabled it also feeds keyword search, so populating Meta is a direct search decision. If Meta is empty, Zing falls back on short descriptions and names.
Results come from the catalog being viewed, and an item appears when it is active, has valid catalog and category links, and the user may view it. To regenerate the text index for the Application File [sys_metadata] table, go to System Definition > Text Indexes, open that table and select Regenerate Text Index.
Refining the Request for field
Auto-completion in the Request for field matches the letters typed. The glide.sc.request_for.columns property adds sys_user columns to this list, which help tell apart two users with the same name. The glide.sc.request_for.order_by property sorts matches by one column, such as department.
Shaping the catalog home page
Administrators and catalog administrators can add, remove and arrange categories, enable content types, set behavior properties and write renderers. A renderer is a set of UI macros that defines how a catalog or category looks.
Categories and previews
Categories can nest, and one catalog item can sit in several categories. A category with no active items in its hierarchy does not appear in the catalog. The roles in glide.sc.category.canview.override, which default to admin and catalog_admin, can view any category even when entitlements would hide it.
By default, a category shows the first two items with the preview expanded. You can change the number, open previews in a pop-up, or hide the Exists in categories information. Dynamic categories show commonly requested items and knowledge articles, on the right side of the homepage by default.
Newer instances and dashboards
On new instances, dashboards handle homepage work. On upgraded instances with Next Experience, existing homepages open by direct URL but cannot be edited; the Homepage deprecation help tool converts them into responsive dashboards.
Migrating to cart layouts on upgraded instances
New instances have cart layouts enabled by default. On upgrade, a check looks at your cart macros: uncustomized macros enable cart layouts, while customized ones keep them off until you migrate, which an admin does.
Move customizations of sc_catalog_homepage_cart, sc_catalog_requested_for, catalog_item, catalog_cart_default and sc_cart_main first, along with any change to the com.glideapp.servicecatalog_category_view UI page or the Catalog Cart dynamic content. Save copies, revert to standard, remove the matching Customer Update [sys_update_xml] record, and run the background script that sets the layout property. Rebuild the customizations you want to keep as widget macros, then set glide.sc.use_cart_layouts to Yes.
How should a team measure whether the highest-volume catalog requests complete after go-live, and who keeps the items maintained?
Measure each high-volume request as a journey, starting from a baseline taken per item. The core figure is successful submissions divided by eligible initiated journeys for that item, reviewed weekly alongside fulfillment and manual repair. Each item needs one named owner, with a backup, who reviews its completion and changes it on a fixed cycle.
Define what counts as a complete request for each item
Completion is not the same as a submitted form. Before go-live, write down what the requester must reach for each high-volume item: submission, an approval where one applies, and a fulfillment task closed without rework. A request sitting in an approval queue for a week is a stalled journey, not a success.
Take the baseline per item soon after go-live
Record a baseline for each item soon after go-live, not one instance-wide average. A blended rate hides a broken equipment request behind a healthy password reset. Count every eligible requester who started the journey, including people who opened the form and left, and fix the reporting week and exclusions so later weeks compare directly.
Find the points where high-volume journeys stall
One completion number shows that a journey is failing, not where. Label each stall point separately, because each one needs a different fix.
- Abandonment at the cart or checkout, where requesters leave without submitting.
- Approval waits, where the request sits untouched with one approver.
- Mandatory fields the requester cannot answer, which show up as abandoned submissions or manual workarounds.
- Manual repair after fulfillment, where someone corrects data the form should have captured.
Give each catalog item a named owner and a backup
Ownership sits with a person, not a shared inbox. The owner is accountable for the item’s form, approval routing, descriptions and completion figure. The backup comes from the same group and can decide when the owner is away. If only one administrator can edit items, that person is a single point of failure.
Run a maintenance cycle after the launch team steps back
Catalog maintenance is continuing work. Policies change, approvers move roles and fields drift from how people actually ask. In practice a fixed review, quarterly, catches drift before it becomes a rebuild.
- Confirm the owner and backup for each high-volume item.
- Pull each item’s completion figure, with its denominator beside it.
- Choose the stall fixes small enough for this cycle, and submit a test request after each change.
- Log what changed and who approved it, so the next reviewer can see why an item looks the way it does.
Agree on these records by handover
- Named owners and backups for each high-volume item.
- The baseline per item taken after go-live, with the formula written out.
- A review calendar and a record of past changes to each item, including who approved them.
Frequently asked questions
Can requesters cancel from the checkout screen?
They can when the instance allows it. The glide.sc.checkout.cancel property lets ESS users cancel from checkout, and ticking the Cancel Request box in the layout shows the Cancel button even when that property is No.
Which checkout model suits a new catalog?
One-step is the default and the simpler start. Move to two-step when requesters need to edit the order, pick a delivery location or attach a file before submitting.
Does search show inactive items?
Inactive categories appear in results by default. Set glide.sc.search.disabled_cats to No to exclude them.
Why do my two-step preview changes not appear?
The Cart Preview Screen (Two Step) record shows changes while the two-step checkout property is enabled. Turn that property on first.