OBLYTECH Logo
OBLYTECH Logo

Catalog Builder: Building and Editing Catalog Items

Catalog Builder is the guided, visual workspace where business owners and service owners create and maintain service catalog items. Administrators set the rules in a template, builders fill in the item within those limits, and each published change passes through a draft copy before requesters see it.

Who does what in the builder

The work splits between people who set the rules and people who build items. The admin role configures the builder through system properties. A catalog_admin creates templates, restricts what builders can change and adds advanced capabilities, and can view and edit all catalog items. A catalog_builder_editor creates and edits items inside a template, and sees only the templates assigned to them. Item owners who hold the catalog_builder_editor role can edit the items they own.

Developers add scripts or qualifiers in the platform when a use case goes beyond the builder.

Setting up the builder before use

Setup happens through system properties. Three of them change what users see. The glide.sc.builder.preview_portal_id property sets the portal used for previews, and its default is swp. The glide.sc.builder.template_access property, default false, lets editors with template access change all items created from that template when set to true. The glide.sc.builder.item_filter_mode property decides which items a user can see and edit: default shows readable items but requires write access to edit, catalog_editor shows items where the user is the catalog editor or manager, and owner_only shows items the user owns.

Two more properties connect the builder to your own material. glide.sc.builder.content_url sends home page visitors to your building-process guidance, and accepts absolute or relative addresses. glide.sc.builder.item_review_flow names a review subflow that runs before publishing, covered further down.

Templates set the boundaries

A template is created from the Dashboard tab with Create a catalog item template, choosing Standard for a catalog item or Record Producer for a record producer. The wizard covers template details, item suggestions, a destination table for record producers, catalogs and categories, question sets, portal settings, access criteria, fulfilment flow and overrides. The overrides step is where restrictions live. Can Edit names the only attributes a builder may change. Must specify lists the attributes that need an answer, and item name and record submission table must be mandatory. Restricted selections limit multi-value fields to values in the template.

Template changes do not flow into existing items. A category added to a template is not added to an existing item, but the new restrictions still apply to it. Templates can be duplicated but not deleted from the builder; deletion happens in the platform, and the items then stop receiving the template’s restrictions.

Item states from draft to published

A new item starts as a draft. Checking out a published item for editing creates a draft copy, and the published item stays Published. A draft is inactive, is hidden from search and browse, and cannot have its Active flag changed. After submission an item sits briefly in Publishing, then becomes Published, the version the application uses.

Editing a published item uses a checkout. The builder copies the item along with its variables, UI policies and client scripts into a draft, and the published item keeps running with its Checked out field set to True. Submitting the draft merges the edits into the published item and deletes the draft copy.

Starting a new item

Choose Create a new catalog item from the Dashboard tab, continue past the overview, select a template and choose Use this item template. Templates are visible only to users they are assigned to. Select Build on your own, and decide whether to use the Build with ServiceNow Otto option, which is selected by default, or to build manually.

Each step saves as you move forward, and a dot beside a step name marks a mandatory field. The steps follow the template: details, destination for record producers, location, questions, UI policies, client scripts, settings, access, fulfilment and review. Template question sets stay locked into the item, and their questions cannot be edited from it.

Preview tests the item in the portal, in Now Mobile or in a Virtual Agent conversation, and allows answering questions without submitting a request. The Virtual Agent preview requires the Service Management Virtual Agent Topic Blocks plugin and one of the two Glide Virtual Agent plugins.

Adding questions and layout

Questions are grouped into text, option, choice, date and time, and display label families. Text covers single-line, multi-line and rich text. Option covers check boxes and Yes/No. Choice covers fixed-value drop-downs, table-driven drop-downs, record references, radio buttons and multi-select. Date and time covers date and date-time. Display labels cover plain and rich text.

Each question is set across tabs: Question for type, label, name, and the mandatory, hidden and read-only flags; Annotation for instructions; Additional Details for validation, source table and filters; Choices for option lists; and Default Value for the pre-selected answer. The name cannot contain spaces or special characters, though underscores are allowed.

Layout uses single-column and two-column containers. A single-column question set fits either container, while a two-column set cannot sit inside a container. Two consecutive check boxes form a virtual container, and any check box added after them joins it. The preview hides interactions for record reference, multi-select and table drop-down questions until they are saved and edited, and it does not show annotations.

Auto-populate and UI policies

Auto-populate fills one question from another reference-type question. For example, a Name of the manager field can take its value from a Select the requester question. Insert a Choice question with the Record reference subtype, point its source table at the user table, then on the Auto-populate tab choose the controlling question and the Manager lookup field.

UI policies change field behaviour when conditions match. Each has an Active flag, an order, an On Load option that applies the policy at form load, and a Reverse if false option. Each action targets one question and can set Mandatory, Read only, Visible and a message type. Scripts are needed for anything beyond those settings, and a UI type setting picks desktop, mobile or all. A policy with a script or several actions does not appear in the question’s behaviour settings list inside the builder.

Editing a published item

Select the item on the Catalog items tab and choose Edit. The builder creates the draft. If no review subflow is configured, submitting merges the changes and clears the checkout. With a review subflow, the draft moves to In review. A completed result merges the edits and moves the published item through Publishing to Published, which may take a moment. A failed result returns the draft to Draft for further work.

An item In review must have its review cancelled before editing, which returns it to Draft. Clear Item is active in the Basic info section of the Details step to deactivate an item, then select Submit on the Review and submit step to publish.

Configuring the review subflow happens in the platform. Copy the template named Catalog Builder – Item review subflow. For the platform subflow itself, see ServiceNow subflows explained. Its catalog_item input takes the draft’s sys_id, and its state output must read completed or failed, spelled exactly, because the value is case sensitive. Create a string property named glide.sc.builder.item_review_flow holding the subflow’s sys_id.

To change a question, use its edit icon on the Questions tab, and add UI policies on the UI Policy tab. A question that a published item uses cannot be deleted, but it can be deactivated and restored later with Insert De-activated questions. A question that has never been published is deleted outright. Questions inside single-row and multi-row variable sets cannot be edited in the builder.

Discarding drafts and moving items

Discard draft is available for draft items only. A draft without a published counterpart is deleted. A draft with one is deleted while the published item stays intact and reverts to its earlier data.

Items created or modified in the builder generate update sets named with the pattern CB_ template name, item name and timestamp. The prefix can be changed with glide.sc.cb.item.update_set_prefix, which accepts template_name, item_name and timestamp variables. Related records held in another scope travel in a batch under the parent item’s update set. Find the sets under Local Update Sets and transfer them to the target instance with the standard update set process.

What the builder does not cover

Several entities can be set in the platform but not created or edited in the builder. These include meta tags, execution plans, price settings, variable settings, tool tips, attributes, permissions, availability, lookup fields, unique values, help text and advanced reference qualifiers. Question types outside the supported list can be viewed but not edited. Items with more than two container levels, or with a two-column set inside a container, cannot be viewed or edited in the builder. Catalog client scripts can be written in the Client Script step of the builder by a catalog_builder_developer. Data lookup rules and advanced reference qualifiers are not created in the builder, so a catalog admin adds them in the platform, which accepts a draft item or a published item that is not checked out.

For the broader concept, see the catalog item concept guide.

Frequently asked questions

Who can edit a published item?

A catalog admin can edit any item. A catalog_builder_editor can edit an item they own, and when template access is enabled, editors with access to the template can edit items created from it.

Why is my change not visible after submission?

With a review subflow, a completed review moves the item through Publishing, and that switch may take a moment. If the review failed, the draft has been returned to Draft and nothing has been published.

Can I delete a question in a live item?

Not while a published item uses it. Deactivate it instead, and restore it later with Insert De-activated questions.

What happens to existing items when a template changes?

Existing items keep their current content. New restrictions apply to them, but new values such as an added category are not copied across.