OBLYTECH Logo
OBLYTECH Logo

Sustainability Disclosures and Reporting Frameworks Guide

A sustainability disclosure is a report on how an organisation performs on environmental, social and governance issues. In Operational Sustainability Management it is tied to reporting frameworks such as GRI, SASB and CSRD. Frameworks and citations come from one library, and the report is drafted in Microsoft Word with live figures before it moves through approval.

What a disclosure is inside the application

A disclosure is a managed record, not a loose file. Investors, customers, employees and the public read these reports, so the application tracks each one through its states and approvers. Users with the disclosure manager role run them.

Disclosure requirements come first. They are the expectations an organisation must meet before it can produce a disclosure, usually set by a regulator or a recognised framework.

Organisations publish disclosures for transparency, risk management and legal compliance. In some regions the law requires disclosure, and falling short of those requirements can bring legal and financial consequences.

How authority documents and citations define the content

The application separates requirements into two layers. An authority document is the regulatory framework or standard that sets out what to report, such as GRI, SASB or CSRD. Beneath it sit citations, the individual items inside that document. One authority document holds many citations.

A citation is the item an organisation actually answers. Take energy. A GRI citation asks for energy consumption from renewable sources, while a SASB citation asks for total energy consumed under its own code. One internal energy figure may answer one, the other or both, depending on how it is split. Keeping them as separate citations shows which requirement each number satisfies.

Once the application is installed, the citation form includes a Reporting requirements and recommendations field with the guidance the reporting organisation supplies. For a greenhouse gas intensity ratio, that guidance sets out the denominator, the scopes and gases counted, and the arithmetic. It also asks that Scope 3 intensity be reported apart from Scope 1 and Scope 2. Read it before collecting data.

Choosing a framework in Unified content management

Unified content management is the central library for frameworks, citations, metric definitions and emission factors. Installing it from the ServiceNow Store saves building each framework’s requirements by hand. For the related policy, audit and evidence work, see policy, audit and evidence management.

Frameworks covered in the Brazil release

Framework or regulation Available from
Global Reporting Initiative (GRI) Included in the library
Sustainability Accounting Standards Board (SASB) Included in the library
Task Force on Climate-related Financial Disclosures (TCFD) Included in the library
United Nations Sustainable Development Goals Included in the library
SustainableIT Version 18.0.3
European Sustainability Reporting Standards (ESRS, CSRD) Version 18.0.3
International Sustainability Standards Board (ISSB) Version 19.1.0
IFRS Sustainability Disclosure Standards Version 19.1.0

Activating a framework and its citations

Activation needs the admin role (sn_esg.admin) and follows a fixed sequence:

  1. Open the Operational Sustainability Workspace and select Unified content management.
  2. Select the framework version, then select Activate.
  3. Read the disclaimer, select Agree, and tick the citations you need before selecting Next.
  4. Tick the metric definitions you want and select Submit.

Citations install active. Metric definitions install inactive, and you can edit them before you use them. When a newer framework version is published, select the framework and choose Update.

Emission factors behind the calculations

Frameworks define what to report; emission factors turn activity data into greenhouse gas figures. An emission factor is a multiplier. You multiply an activity figure, such as units of fuel or electricity used, by the factor to get the emissions it produced. The library already holds four sets, so you do not have to set each one up.

Emission factor set Source
eGRID Included in the library
GHG Emission Factors US EPA
UK GHG factors DEFRA and DESNZ
US Environmentally-Extended Input-Output (USEEIO) Included in the library

Activate the sets that meet your reporting requirement.

Disclosure types and their purpose

The application supports seven types. The type you choose at creation decides which Word template, if one exists, the document is built from.

Type What it covers
Annual report Yearly financial and business review that may touch on sustainability
ESG report Environmental, social and governance performance, also called a sustainability or CSR report
Regulatory and framework Disclosures required by authorities or set by standards bodies
Request for information Questions sent to suppliers or partners about their practices
Ratings and indices Data supplied to bodies that rank companies on sustainability
Supplier questionnaire Questions asked of suppliers about environmental, social and governance practices
Others Any disclosure that fits none of the types above

Building a narrative disclosure

Narrative disclosures are the format new users receive from version 18.0.3 onward. The document is drafted in Microsoft Word, with data pulled in by the ServiceNow Reporting add-in. Create one from the Narrative disclosures list by selecting New.

Owner is the person who moves the disclosure through its states and can start a sync. Approvers must sign it off. Data classification marks the report Public, meaning it may be made public, or Private, meaning it must stay private. The State field starts at Draft.

Choosing where the document lives

Tick Upload to remote storage to keep the document on SharePoint. The Remote storage section then asks for a document path and a list of collaborators. Remote storage needs the OneDrive integration and the sn_docs_onedrive plugin active first, which is platform setup rather than report work.

Leave the box clear to work locally: download, edit, add metrics, upload back. Local disclosures follow the same approval route, but the sync step applies only to SharePoint storage.

Working through the lifecycle

A disclosure moves through Draft, Work in Progress and Completed. Completed is reached only after every named approver signs off, and a rejection sends it back to Work in Progress. If a template exists for its type, the document is built from it. Admins create templates as Word files up to 10 MB, one per type.

Pulling governed data into the Word report

Figures come from reporting configuration records, not typed numbers. An administrator with the sn_esg_msoff_intg.admin role creates each record with a source: a table, a report or a data visualisation. Active records are the ones offered in the document. Reports are limited to list, pivot, multi-level pivot, horizontal and vertical bar, and pie charts. Stacked and grouped bar charts are not supported.

Filters control what is read. Each names a field and the exact record to read, and you can add as many as needed. Entity-level metric data can aggregate by year, quarter, month, week or date, so a parent location’s yearly Scope 1 total can roll up its sub-locations. Related fields make one filter depend on another: a city filter related to a country filter narrows the city list once a country is chosen. Related fields must carry a higher order value, so plan the order first.

In Word, select Insert Link, sign in, then use the Data, Table or Chart tab to choose the configured item and value column. Inserted items become content controls, and Manage Links refreshes the ones you select while keeping formatting. If the underlying data changes, the data owners receive an email asking them to refresh the document.

Approvals, supporting documents and metrics

Approval is a gate. When several approvers are named, each must approve before the disclosure reaches Completed. A rejection from any one of them returns the disclosure to Work in Progress for resubmission.

Secondary documents, such as sustainability reports, governance documents, third-party certifications and ethics or supply-chain policies, add context and validation. The generated document stays as the primary document and cannot be deleted. Just the latest version of a secondary document is kept, so upload a revised policy as a new version.

Metrics are added from the Related metrics list. Hand-added metrics can be removed later, but metrics from the Microsoft 365 reporting app cannot, so settle the list before the first draft circulates. After a sync, the changes appear on the Overview page under Disclosure summary.

Reusable claims for reporting

A claim is a statement about something the organisation did: an achievement, a commitment, an event or an activity. Claims sit in one repository, so one statement can feed several reports. They can be qualitative or quantitative and can pass review. Tracking shows which disclosures use each claim.

From Word, choose Create claim under ServiceNow Reporting, sign in and complete the Claims for reporting form. A useful claim names a specific action, a date and a place, so a reviewer has something to check.

Practical cautions before you start

Four habits prevent rework. Do not select and delete the document’s content, because metrics tied to it stay tracked. Leave Document ID and Disclosure Number untouched after creation. Close the Word document before syncing, then allow about a minute for the tracking table to update. Use current framework content: the SASB and GRI content accelerators were deprecated from the Xanadu release and are no longer activated on new instances.

Which climate disclosure rules are active, paused or voluntary in the US, Canada, Australia and New Zealand as of November 2026?

As of November 2026, California SB 253 Scope 1 and 2 reporting is active, first due November 10. SB 261 and SB 253 Scope 3 are paused by an injunction. The SEC climate rule is stayed. Canada’s CSDS standards are voluntary unless mandated. Australia’s AASB S2 is mandatory for qualifying entities and phasing in. New Zealand’s NZ CS standards apply with interim relief.

Status by market and obligation

  • Active, US: California SB 253 Scope 1 and 2 reporting covers U.S.-formed entities doing business in California with annual revenue above US$1 billion. The California Air Resources Board has set November 10, 2026 as the first-year deadline.
  • Paused, US: SB 261 and SB 253 Scope 3. A Ninth Circuit ruling on November 9, 2026 blocked enforcement while litigation continues.
  • Stayed, US federal: The SEC’s 2024 climate rule never took effect. The SEC proposed full rescission on May 29, 2026, and final timing is unclear.
  • Voluntary, Canada: CSDS 1 and 2 apply only where a government or regulator mandates them. OSFI B-15 is a separate supervisory framework for in-scope federally regulated financial institutions.
  • Mandatory, Australia: AASB S2 applies in cohorts that start with financial years commencing on or after January 1, 2025, July 1, 2026 and July 1, 2027.
  • Active with relief, New Zealand: NZ CS 1 to 3 apply from periods beginning on or after January 1, 2023, subject to statutory thresholds and interim FMA relief extended in September 2026.

Sorting an entity into the right category

  1. California SB 253 turns on U.S.-formed entities doing business in California, so a foreign parent must check every U.S.-formed company in its group.
  2. Apply the size test for that regime. Australia uses two of three size criteria, and New Zealand starts from listed market value, quoted debt and sector asset tests.
  3. Check when each financial year starts, not when the report is filed.
  4. Check the relief in force. CARB enforcement discretion lets first-cycle SB 253 submissions go in with or without assurance, and AASB S2 first-year relief allows omission of Scope 3 and comparative information.

What to ask for before you commit

  • An applicability matrix by entity and year, marking each obligation as active, paused, stayed or voluntary, with the date last checked.
  • A map from each disclosure to its metrics, sources and approvers, so a reviewer can trace a figure to its inputs.
  • A carbon dashboard is not enough on its own. Ask how the climate-financial narrative for SB 261, AASB S2 and NZ CS is produced and reviewed.

Mistakes that cost time

  • Treating the SEC rule as current because it was adopted in 2024. It was stayed before it took effect.
  • Assuming the Scope 3 injunction ends all California duties. Scope 1 and 2 reporting still applies.

No platform decides applicability or relief. Record who checked each legal position and when.

Frequently asked questions

Does a disclosure need a framework installed first?

A disclosure can start blank when no template exists. The framework supplies the citations and metric definitions the report answers against, so install it before choosing metrics.

Why is a framework missing from my list?

Availability depends on the instance version: SustainableIT and ESRS/CSRD arrived in 18.0.3, ISSB and IFRS standards in 19.1.0.

What happens when the underlying data changes?

The data owners receive an automatic email asking for a refresh. Open Manage Links, select the items and refresh them.

Who can start a narrative disclosure?

Remote storage requires the disclosure manager or program manager role. A local disclosure requires the disclosure manager or admin role.