Journey Accelerator builds employee transition plans from reusable parts. An administrator defines plan types, stage names, task templates and plan configurations once. A manager assembles a plan for each person from those parts, and the to-dos appear in the Employee Center. Build the parts in that order because a plan configuration cannot be active without at least one stage.
How the parts of a plan fit together
Journey Accelerator separates the design of a plan from the plan a person works through. Administrators build the design, and managers use it to set up a plan for one employee and then adjust the to-dos for that person. The roles follow the same split. For the wider view of who does what, see the roles and RACI guide. The administrator role (sn_ja.admin) manages the application’s components and data, the modifier role changes existing plans, stages and to-dos, and the reader role views plans, stages, to-dos and dashboards.
| Building block | What it controls | Where an administrator works |
|---|---|---|
| Plan type | The top-level label, such as New Hire, Promotion or Offboarding | Journey Accelerator > Manage Plan Types |
| Stage name | A named step inside a plan, such as Week 1 or Month 2 | Journey Accelerator > Manage Stage Names |
| Task template | A reusable to-do that appears in a plan’s list | Journey Accelerator > Manage Task Templates |
| Plan configuration | A plan type tied to an audience, with its stages | Journey Accelerator > Manage Plan Configurations |
| Plan header configuration | The labels and fields each role sees at the top of a plan | Journey Accelerator > Manage Plan Header Configuration |
For the wider picture, see the employee journey concepts page.
Build Journey Accelerator plan types and stage names first
Start with plan types, because everything else hangs from them. A plan type is the classification a manager picks when configuring a plan, so give it a title that is recognizable at a glance. New Hire, Promotion and Offboarding work as plain labels. A more specific title such as IT Senior Tech Promotion tells a manager exactly which track they are on. To create one, open All > Journey Accelerator > Manage Plan Types, select New, and enter the title. This step needs the sn_ja.admin role.
Each plan type also carries default header settings for the manager, employee and mentor views. Select the search icon beside a role to choose a different header configuration, then submit the form.
Stages come next. A stage is a named block inside a plan that holds tasks or to-do lists for a manager, mentor or employee. Create stage names under Manage Stage Names by selecting New and entering a title. Stage titles are visible to the people working through the plan, so write them as steps a reader can follow, such as Week 1, Day 1 or Month 2. Stages should follow a logical order, such as a time sequence, so readers move down the plan without guessing what comes next.
Task templates hold the to-dos
A task template becomes a to-do in the plan list that managers, mentors or employees see in the Employee Center. Create or edit templates under Manage Task Templates, then submit or update the record. This step needs the admin role. For the wider concept, see the journey task explainer.
Core task template fields
Each template starts with a name that describes the activity behind the task. Set the Table field to the Journey Accelerator Task table, because the template fields stay hidden until you do. Mandatory decides whether the task is required; leaving it unchecked makes the task optional.
The Type setting offers Regular, a standard to-do, and Calendar, a schedulable task that creates a to-do linked to a Microsoft Office 365 calendar event.
The Active box controls whether managers can use the template, so leave it unchecked while you revise a template. The Task short description is what users see inside the plan. The Task description holds the longer text. The Parent plan table points to Journey Accelerator Plan, the table that tracks plans.
Assign to source chooses the employee, the manager or the mentor as the recipient. When a plan lists several mentors, the first mentor receives the to-dos at first, and a manager can reassign them to other mentors after the plan is created.
Timing each task
The due date fields decide when a task is assigned, measured from the plan’s publish date. Relative due date trigger offers Created, End on, Start on and Updated. Use Start on, which is the default. Date offset type offers On and After, and After is the default and the recommended choice.
Number of offset days takes a count of days. Enter days and keep hours at zero. For example, Start on, After and 5 days assigns the task five days after the plan is published.
Reusing to-dos from a plan
Managers can add, change and delete to-dos inside an action plan, and save any of them as a template so the next plan starts with the same wording and timing. Saved to-dos are stored as Journey Accelerator Model Task records, which are used to copy a task. For broader process guidance, see the employee journey management best practices.
Plan configurations connect a type to an audience
A plan configuration takes a plan type and points it at a group of employees. Open All > Journey Accelerator > Manage Plan Configurations, then select New or open an existing record. The Title is what managers see when they choose a configuration, so name it for its audience, such as Sales Employee Plan Configuration. The Audience field selects the group of users and controls who can reach the plans built from it. The plan type field links the configuration to its classification. Short description and Description hold a brief and a full summary, and the Active box makes the configuration available for use.
A configuration cannot be made active until it contains at least one stage. To add stages, click Save on the configuration, then select New in the stage section, choose an available stage name, click Submit, and then click Update on the configuration.
Set role labels in the plan header
Each plan shows a header to three roles: Manager, Employee and Mentor. A header carries role-based permissions, custom field labels and a few role-specific preferences. Labels belong to one role, so you can change what a mentor reads without changing what a manager reads. Open All > Journey Accelerator > Manage Plan Header Configuration and select Default for employee to review the defaults. That header includes a field called Plan created by and a mentor field.
A common change is relabeling the mentor. Open the mentor field, enter buddy in the Custom label, click Update, then click Update again on the header configuration. The line This person’s mentor becomes This person’s buddy. The change applies to the employee header view.
To build a separate header, select New on the Manage Plan Header Configuration list, enter a name meaningful to that role, and submit. Reopen it, select New again, choose a detail such as Mentors can edit, enter the custom label, and click Update twice. Plan types that use the header show the new label.
A custom label applies to one mentor field, either the one for Mentor can view or the one for Mentor can edit. Decide which permission the mentor needs before you rename it.
Create plans automatically from lifecycle events
Plans can also be created from a lifecycle event. First, activate the activity called Create a new action plan for your employee, which is inactive by default. Go to All > Lifecycle Events > Manage Activity Configuration, open that activity, select Active and click Update. The role needed is sn_hr_le.admin or sn_hr_le.activity_set_manager.
Second, open the Create Journey Accelerator Plan template under All > Lifecycle Events > Administration > Manage HR Templates and set Create plan automatically. When it is true, a plan is created as soon as the lifecycle event activity is created. When it is false, the manager receives a to-do in the HR case and opens that case to create the plan.
Make plans reachable in the Employee Center
Managers, employees and mentors reach their plans through the Employee Center, so the menus need wiring. Install the latest Employee Center app and update its theme. Then create an activity configuration named Action plan items that points at the ja_plans portal page, with Internal navigation and order 100.
Next, create an Employee Center activity configuration for that activity. For managers, the filters check that the plan is active and that the logged-in user is the manager or a mentor with edit or view access. For employees, they check that the plan belongs to the user and is not in Draft. Last, add an Action Plans menu item under the More entry in the Employee Center main menu.
Frequently asked questions
Can a plan configuration be active without stages?
No. A configuration cannot be made active until it contains at least one stage. Add the stages first, then select Update so the configuration saves with them.
What is the difference between a plan type and a plan configuration?
A plan type is the classification, such as New Hire or Promotion. A plan configuration takes one plan type, names its audience, and holds the stages that audience works through.
When should a task use the Calendar type?
Use Calendar when the to-do should be linked to a Microsoft Office 365 calendar event. Regular covers standard to-dos that need no scheduling.
Does changing a header label affect the manager’s view?
No. Labels belong to one role, and the buddy example changes the employee header view. The manager and mentor headers keep their own labels until you change them.