Automation Center (scope sn_ac) collects automations from ServiceNow flows, RPA Hub and third-party tools into one application. An admin installs it, sets a few system properties, schedules data imports, and then reads the Overview, Executions and Value dashboards. This guide follows the Brazil release.
How records reach the dashboards
Flows can be tracked as automations, RPA Hub supplies robots and bot processes, and external vendors send data over REST calls or the Automation Center API. UiPath data arrives through a UiPath spoke.
Each record passes through a fixed chain of tables before it reaches a dashboard. When a figure looks wrong, check which link is missing.
| Automation source | Tables that hold the record |
|---|---|
| Tracked ServiceNow flows | cmdb_ci_flow_automation, then cmdb_ci_automation |
| ServiceNow RPA processes and robots | cmdb_ci_rpa_process and cmdb_ci_rpa_robot |
| Third-party RPA processes and robots | cmdb_ci_base_rpa_process and cmdb_ci_base_rpa_robot |
| All automations, before display | cmdb_ci |
The Automation Attribute table (sn_ac_ci_attribute) stores the cost, time, source and associated automation for each process and robot, and the Value dashboard displays those figures. Automations reach the dashboards through cmdb_ci.
Installing the application and assigning roles
Installing takes the admin role and valid entitlements for the application and its Store dependencies. Read the Store listing first for dependencies, licensing and release compatibility. The application ID is sn_ac.
- Go to All > System Applications > All Available Applications > All.
- Search by name or by the ID sn_ac.
- Choose a version from the list beside the Install button.
- Review the Review Installation Details dialog, which lists the dependencies that install with it.
- Tick Load demo data on a development or test instance, then select Install.
The install adds plugins, Store applications, roles, scheduled jobs and tables. The Value dashboard draws on Performance Analytics (PA) tables, so it may look empty until the PA jobs run. Run them manually to see data sooner.
| Role | What it lets the holder do |
|---|---|
| sn_ac.automation_business_user | Create automation requests and goals, and move requests through their life-cycle stages |
| sn_ac.automation_technical_user | Schedule and configure data imports, view the Spokes & Transactions section, and see the Recommendations panel |
| sn_ac.automation_admin | Configure the application and edit the catalog onboarding property |
The incident and change widgets on the Executions dashboard also need the itil role, or the sn_incident_read and sn_change_read roles.
Setting the properties that shape the dashboards
Properties live under All > Automation Center > Administration > Automation Properties. The values below are the shipped defaults.
| Property | Default | What it controls |
|---|---|---|
| sn_ac.workspace.date.default_num_of_days | 7 | Days of data shown in the workspace |
| sn_ac.purge_automation_data_in_days | 14 | Days kept for execution data, import error logs, action logs and insights |
| sn_ac.reporting_currency | USD | Currency used in dashboards and reports |
| sn_ac.savings_averaging_window | 4 | Moving average for cost and time saved per run |
| sn_ac.use_recommended_actions | False | Enables the Recommended Actions application in the workspace |
| sn_ac.auto_onboarding_catalog_items | True | How new catalog items are onboarded as automations |
At True, new catalog items appear at once but without time and cost savings. At False, you onboard each item through the Automation Explorer, which is slower but shows savings per item.
Scheduling imports from third-party tools
A data import runs in five steps: schedule it, select a spoke, select an action, configure the batch import, then verify and test. Scheduling offers five patterns:
- Daily: one time each day, in 12-hour or 24-hour format.
- Weekly: a chosen day of the week plus a time.
- Monthly: a chosen date of the month plus a time.
- Run once: one date and time picked from the calendar.
- Repeat: a custom interval in days. Entering 20 in the Days field runs the import every 20 days.
Actions with an array output type show an output option at the batch step. Pick one of four batch methods:
- None sends the import as a single request.
- Offset pulls batches using an offset value.
- Time based pulls batches across time intervals.
- Token based pulls batches using a continuation token.
For 1,000 automation records at a page size of 100, the import needs ten pages, so the pagination must indicate both a page number and a page size.
Select Generate flow template, then edit the flow in Workflow Studio. Set the input parameters, which can be static (a fixed value such as a retry limit of 3) or dynamic (passed in at run time), and add the pagination. Run Verify flow, keep the flow inactive, then move to verify and test to confirm the records arrive correctly.
Reading the Overview dashboard
The Overview dashboard is the landing page of the Automation Center Workspace. Open it from All > Automation Center > Automation Center Home > Overview, or from Workspaces > Automation Center Workspace > Overview.
The Active automations section filters by date range, automation and department. Its charts cover criticality, executions by source, RPA and flow automations over time, Document Intelligence, and the top ten business applications used.
The Spokes & Transactions section needs the technical user or admin role.
| Figure | What it counts |
|---|---|
| Total entitled and installed spokes | Spokes you are entitled to and that are installed |
| Configured spokes | Spokes with a connection set up |
| Total entitled and consumed transactions | Transactions available, and transactions used so far |
| Applications and spokes with most transactions | Ranked by transaction count, last month by default |
The Future automations section shows new requests, requests by intake source (Web, Process Mining or Service Request), requests ready to deploy, and the latest requests.
Reading the Executions dashboard
An execution is one run of an automation. Open the dashboard from All > Automation Center > Automation Center Home > Executions, or from Workspaces > Automation Center Workspace > Executions.
Four filters sit at the top: Department, Automation, Source and Application. With no filter, all data shows. The main charts cover:
- Execution summary by state.
- Automation incidents and automation changes, which show incidents and changes that affect automations directly.
- Business application changes, for changes to linked applications.
- Execution state over time, defaulting to the last week.
- Execution summary by automation name.
The Transaction summary covers the last 24 hours of spoke activity, including in progress and failed transactions by flow, which helps locate a spike in failures.
The Insights panel lists issues within Automation Center. You can fix or dismiss each one, but leaving an issue open can cause an automation to behave unexpectedly.
Tracking value on the Value dashboard
The Value dashboard summarises goal and automation states, plus actual and estimated cost and time saved across active and future automations. Figures are smoothed by sn_ac.savings_averaging_window.
Creating requests, reviews and action requests
Three request types exist. An automation request proposes a process to automate. An action request asks for a fix to an issue causing automations to fail. A review request asks for an evaluation of an existing automation.
Go to All > Automation Center > Build > All Automation Requests, select New, complete the form and select Submit. Fill in any further fields your role shows, then save. Requests can also start from the Submit an Automation Request form in the Service Catalog.
Technical users and admins see the Recommendations panel, which can reuse or plan from an existing request once Recommended Actions is configured. Consider creating an automation goal first, so the request has a business target. When the request is ready, move it to the Planned state.
Managing requests and tasks on the Kanban board
The Kanban board shows requests and tasks in all states on one screen. You can update a state or create a task for a request there. The Request Board handles requests and the Task Board handles tasks.
Applying CSDM and domain separation
Automation Center uses CSDM tables, so Common Service Data Model guidelines apply to how its records are modelled.
Domain separation is supported at a basic level. It splits data, processes and admin tasks into domains, covering the interface, reporting and aggregations. Multi-tenant use needs the instance owner to configure it, with a flat or single-tier hierarchy that has at least one top-level domain. Action Center shows global and current-session domain data, while Connection Manager shows only the current session’s domain. One use case to plan for is a service provider replying to a tenant customer through chat, and the customer must see that reply. Test that path before you go live.
What ServiceNow Otto adds and where it is limited
ServiceNow Otto for Automation Center adds AI features. Three limits apply.
Availability comes first. Some Otto features are not offered in FedRAMP, NSC DOD IL5, Australia IRAP-Protected, self-hosted or other restricted environments, and some are limited to certain regions. Confirm what your instance supports before you plan around a feature.
Data goes to a central ServiceNow environment, which may sit in another region. ServiceNow uses inputs, outputs and edits to develop its products, and customers can opt out of future collection at any time.
Output may be inaccurate, incomplete or unsuitable. Test it against your own use case, keep a person reviewing it, and do not decide on AI output alone, especially in healthcare, finance, legal, employment, security or infrastructure work.
Frequently asked questions
Why does a new automation not show on the dashboard?
An automation passes through the cmdb_ci table before it displays. Check the table for its source, then check the matching Automation Attribute record (sn_ac_ci_attribute) for its cost and time values.
Why is the Value dashboard empty right after installation?
Its figures come from Performance Analytics tables, so run the PA jobs manually to see data before the next scheduled run.
How long does Automation Center keep execution history?
By default, execution data and related logs are kept for 14 days. Change sn_ac.purge_automation_data_in_days for a longer window.
Can a data import run every 20 days?
Yes. Choose Repeat in the schedule form and enter 20 in the Days field.