OBLYTECH Logo
OBLYTECH Logo

Configuring Now Assist Skills for CSM: Setup Guide

Configuring the generative AI skills for Customer Service Management means installing the CSM plugin and running a guided setup for each skill. That setup sets the triggers and inputs, availability, roles and display location. The Australia release calls the product ServiceNow Otto for CSM.

What you need before you configure a skill

The skills ship in the sn_csm_gen_ai plugin, which has to be installed first. On the Xanadu release, where the product was still called Now Assist for CSM, the application was supported from Vancouver Patch 4.

On Australia, the install runs through AI Admin Hub. Open Settings, select Plugins, choose Get plugins and confirm Install Plugin. Finish the install in the store tab, return to the console and select Refresh. At least one AI-generated application must be installed first.

The side panel is a separate switch. On Xanadu, go to Now Assist Admin, open Now Assist Experiences, select Now Assist panel and choose Turn On. That needs at least one Now Assist application installed and the sn_nowassist_admin.nsa_admin role. Users need the now_assist_panel_user role to open it. On Zurich, the switch lives in AI Admin Hub under AI Experiences and requires sn_generative_ai.nsa_admin. AI agents also need the panel turned on and case summarization active.

On Xanadu, these skills generate their output through Now LLM Service. On Australia, the provider you choose controls the intelligence layer for the whole capability.

The five settings each skill shares

Each skill has its own configuration, but the configurations share the same five components.

Component The question it answers Example
Trigger When does the skill generate output? Chat summarization can run when a chat passes from one live agent to another
Input Which data feeds the output? Resolution notes read the description, short description, work notes and additional comments
Availability When is the skill active? Available at all times, or limited by conditions set in a condition builder
Access Which roles may use it? A default agent role applies unless it is changed
Display Where does it appear? On forms and workspaces, or in the ServiceNow Otto panel

On Australia, each step has a Back button for returning to a previous step. Finish with Review and Activate, close with Done, then select Activate. For the ITSM version of this setup, see the ITSM skill configuration guide.

Working through the guided setup

Start from the Skills tab. On Xanadu, go to All, then Now Assist Admin, then Features. On Australia, go to All, then AI Admin Hub, then AI Skills. Choose the Customer workflow group, select CSM as the product and use Activate skill on the tile. The flow then runs through these screens, in order:

  1. Triggers or inputs, then save and continue.
  2. Output, for resolution notes.
  3. Availability.
  4. Input sources, for chat summarization, chat recommendation, sentiment analysis and suggested steps.
  5. Access.
  6. Display.
  7. Review, activate and close.

Checking the fields that feed resolution notes

Resolution notes are generated from the short description, description, work notes, additional comments and email fields. Changing the names or labels of those fields can cause issues with generation, so keep the defaults.

Choosing customer portals as input

Chat summarization and chat recommendation ask which customer-facing portals supply their input. In chat summarization, the default product portal cannot be modified or deselected, and a portal that another product already uses cannot be selected. Pick the portals your customers actually write through, because the skill takes its input from conversations in those portals.

Allowing time for record clustering

Suggested steps adds a record clustering stage that runs as a background job. With 5,000 or more cases it takes at least 30 minutes, and you are notified when it completes, so you can leave the page while it runs.

Deciding who can use a skill and where it appears

The roles chosen in Define access control who can use the skill, and the same roles then appear in Select display. If the access step is left unchanged, a default agent role applies. Custom roles from before an upgrade are updated by a script. Newer roles must be added in Define access and then selected in Select display, or they stay inactive. For the wider role design behind this, see the security and access design guide.

Display has two options. In-product shows the skill on forms and workspaces. The panel option, named Now Assist panel on Xanadu and ServiceNow Otto panel on Australia, appears after the panel is turned on. For each display type, open the chevron and enter the roles that should see the skill there.

Setting different skill configurations per domain

On an instance with domain separation, change the current domain, then open All, AI Admin Hub, AI Skills. Select the global configuration, confirm the pop-up and choose Yes, edit.

Domain configurations inherit the global settings unless they are overridden. The edited skill is renamed in the form “Skill Name for Domain Name”. A configuration activated in a parent domain also applies to its child domains, while one activated in a child applies just to that child.

Activation order matters. Activate the global configuration first, then the parent domain, then the child domain. If a child is activated before its parent, the parent cannot override it, and both skills stay active in the child domain. Check the active skills in each child domain after any parent change. For the service side of this setup, see the Now Assist implementation page.

Copying and customizing a skill

A copy is the safer route for changes, because it leaves the default configuration intact. To make one, open the more options icon next to the skill in the All available skills or Active skills section and select Make a copy. The copy is listed in the Active skills section, where you can edit its name. A clear name helps the language model identify the skill.

In the default setup, only one version of a skill can be active at a time, so activating a copy deactivates the version that was active before. Test the copy first. For the wider governance questions around changes like this, see the governance model. On Australia, cloning can also be done from AI Skill Kit, for the latest versions of base skills.

Prompt changes happen in AI Skill Kit and need the sn_skill_builder.admin role. Duplicate the prompt for its provider, add any pre or post processors and conditions, then finalize and publish it. A finalized prompt can be edited, but it has to be finalized again before the skill is republished. Adjust inputs first, then test on a sample record. For the wider rollout sequence, see the implementation roadmap.

Tracking how skills are used

The Skills Performance dashboard sits under AI Admin Hub, then Performance. Its date, product and skill filters apply to the whole page, and it reports nine CSM skills.

The default widgets show how often each skill is selected, triggered and successfully executed over time, the number of unique daily users, the share of generated content that people accept compared with content they write themselves, and thumbs-up and thumbs-down feedback. Two custom widgets break usage down by customer agent and by assignment group. Select View skill details to drill into one skill. For the broader measures to track next to these dashboards, see KPIs and metrics that matter.

Record pages and the solution action

The CSM default record page and the CSM Interaction record page are the ones set up to display generative AI elements in CSM Configurable Workspace. In UI Builder, set the CSM default record page and the CSM Interaction record page as the defaults. Each record page has an order value, and the page with the lowest order value is the default.

On Xanadu, the case form also needs the Propose Solution UI action and declarative action, which let an agent propose a solution that includes the AI-generated resolution notes. Both actions are inactive by default, and the standard Propose Solution UI action for Customer Service Management has to be deactivated before the Now Assist for CSM version is activated.

The eighteen CSM skills on Australia

Skill What it produces
Chat summarization A short summary of a conversation with a live agent or virtual agent
Call summarization A summary of an agent and customer call in the active chat window
Resolution notes A summary of how a case was resolved, for reuse on similar cases
Knowledge generation A draft knowledge article from work done on a resolved case
Chat reply recommendation Suggested replies based on the conversation
Email recommendation Suggested email responses based on the case context
Sentiment analysis An assessment of case sentiment with the reasoning behind it
Suggested steps Steps drawn from clusters of closed cases with similar resolutions
Sidebar summarization A summary of sidebar discussions with requesters and experts
Case summarization A summary of case details shown on the case record
Activity response generation Recommended text for resolution notes, work notes and comments
Trending topics dashboard Case trends with filters for region and progression
Sentiment analysis dashboard Customer sentiment across cases and its drivers
Customer summarization A summary of interactions and case history in one view
Special handling notes summarization Key handling instructions taken from customer records
AI in portal case form Real-time help for customers while they complete a case form
Service recommendations for interactions Suggested services or products based on customer history
Complaint case summarization A structured summary of a complaint and its severity

What AI allowance should a CSM quote state, now that Otto succeeds Now Assist and some actions use more than one Assist?

A CSM quote should state five things about AI: the Assist capacity included in the package, which actions draw on it and how many Assists each one uses, whether development and sub-production use is counted, what additional capacity costs, and the measurement period. Name the product as ServiceNow Otto.

Why the Now Assist line in older paperwork does not carry over

Older quotes and renewal notes often still say Now Assist for CSM. As of November 2026, Otto is the successor name to Now Assist for CSM, but package names alone do not show what rights a contract grants, so the written order governs.

An Assist is a usage unit, not a count of features. One skill run can draw more than one Assist. The common failure here is pricing AI per skill or per agent, then finding that a larger action uses more than the sheet assumed.

The five parts an AI line in a quote should contain

  1. Included AI capacity. The Assist allowance in the package, stated as a number for a named period. Take the figure from the written order, not from a sales summary.
  2. Chargeable actions. Each action that draws on Assists, with its Assist cost. Flag the multi-Assist actions by name and keep agentic workflows separate from summarization skills.
  3. Development and test consumption. Sub-production usage counts, so a build team testing in a non-production instance adds to measured Assist use. Quote test volume beside production volume.
  4. Additional-capacity price. The rate charged once usage passes the included amount. As of November 2026, the public material reviewed did not establish one overage rate for Advanced or Prime, so take the figure from the quote itself.
  5. Measurement period. Whether the allowance resets monthly, annually or across the term, and what happens to unused capacity. Ask for the rule in writing.

Why package inclusion does not mean unlimited use

Being included in a package does not establish unlimited consumption of every AI capability. Name each action the wording covers.

Questions to put to the seller before signing

  • Which planned actions draw on Assists, and how many does each use at our expected volume?
  • Does the allowance cover sub-production instances, or production only?
  • What is the additional-capacity rate, and is it written into the order?
  • Over what period is usage measured, and what happens to unused capacity?

How to check actual use against the quote after go-live

As of November 2026, the Skills Performance dashboard sits under AI Admin Hub, then Performance, and its date filter lets you pick the period to review. None of the default widgets is labeled as an Assist count, so set a monthly review that compares skill counts with the Assist volume the quote assumed, and ask the seller how consumption is metered before go-live.

Frequently asked questions

Do skills need the side panel?

No. An in-product skill appears on forms and workspaces without it. AI agents do need the panel.

Which provider runs the CSM skills?

On Xanadu, Now LLM Service generates the responses. On Australia, one chosen provider controls the intelligence layer for the AI-generated skills.

Can I change a base skill directly?

Rather than changing it directly, use a copy, which keeps the default configuration intact. Make a copy, rename it, adjust its inputs or prompt, test it on sample records and then activate the copy.

Why does a child domain still show a skill I changed in the parent?

Child domains inherit the global configuration, and a parent override flows down to them. A mismatch usually comes from activation order. If a child was activated before its parent, the parent cannot override it. Activate in the order global, parent, then child.