Otto for Virtual Agent comes in three chat modes: standard, enhanced and premium. Standard chat sits in a fixed widget. Enhanced chat adds a resizable window, search and several active conversations. Premium chat appears across the platform and adapts to the task. Each mode suits different portals and channels, so the choice starts with what the instance supports.
Choosing between standard, enhanced and premium chat
The mode decides how much a user can do without leaving the conversation. This table sets out the differences that matter when planning a rollout.
| Capability | Standard chat | Enhanced chat | Premium chat |
|---|---|---|---|
| Chat window can be resized and moved | No | Yes | Yes |
| Several conversations active at once | No | Yes | Yes |
| Interactive side view for sources and files | No | Yes | Yes |
| Portal search bar can open a chat | No | Yes | Yes |
| Conversations stay open after a task finishes | No | Yes | Yes |
| View all topics option | Yes | Yes | Yes |
Standard chat is a conversational support experience inside a static chat window. The default AI disclaimer should not be modified or removed. If an administrator changes or removes it, the administrator becomes responsible for telling users they are dealing with an AI system, and ServiceNow is not responsible for the effects of those changes.
Enhanced chat runs in a window that can be resized and moved around the page. Users can keep several conversations going and open sources in the interactive view beside the chat. It also changes search. A query typed into a portal search bar can start a chat, or land on a results page with a synthesized answer at the top. When the full-page option is switched on, those queries open a chat tab instead, and the conversation stays in sync with the floating window. The full-page option appears in guided setup when AI Search is also enabled on the portal.
Premium chat opens from the Otto icon or when text is typed into the omnibar. Premium chat is not offered to all instances. Eligibility is checked automatically, and the option appears once an instance qualifies. Instances that use regional data routing do not qualify.
Working inside the premium chat window
The input box starts as a single line and grows when the text passes the width of the field. A plus icon opens a web search switch, which can be turned on or off during a conversation, and a file upload option. A conversation accepts up to 10 files with a combined limit of 50 MB.
The Chats list places the newest conversations at the top. An active chat moves into the Closed section after two hours of inactivity. That timer is the Conversation Idle Timeout field on the messaging channel record in the Messaging Channels table, so an administrator who wants a longer window changes the value there. Closed chats are read-only and cannot be reopened. They appear when the Show closed chats setting is enabled under the assistant’s chat experience.
When search finds nothing, the fallback options are a live chat request, a web search, a generic ticket or a custom fallback topic written by the administrator. One live agent chat can run at a time, and ending it moves its transcript into the closed list.
Channels: where Otto for Virtual Agent can appear
Otto for Virtual Agent is available through portals, the mobile app and Microsoft Teams. Slack and Google Chat connect through their own integrations, and Microsoft Copilot runs through the Teams integration. The table summarises what each channel needs before it is switched on.
| Channel | Modes available | What it needs first |
|---|---|---|
| Service portal | Standard, enhanced or premium | Enhanced chat needs AI Search on the portal. Premium depends on eligibility. |
| Mobile app | Enhanced through all three components. Standard chat gets the chat launcher and custom app, for existing Otto for Virtual Agent customers only. | A mobile search configuration for the search widget |
| Microsoft Teams | Conversational integration | A Now Virtual Agent bot or a self-configured bot, and the assistant linked to the Teams tenant |
| Slack | Conversational integration | AI Search enabled, and response streaming switched on |
| Google Chat | Self-configured bot | Virtual agent admin role plus external app install admin or admin role, and a bot created beforehand |
| Microsoft Copilot | Through the Teams integration | Teams plugin version 10.1.1 or higher, and a Copilot licence or the free Copilot chat licence |
The mobile app offers three components. The mobile search widget opens a full-screen chat when a user types in the search bar, and it supports the full-page experience only. The chat launcher opens native Virtual Agent from the chat function. The custom app places the native interface inside a third-party app built with the Mobile SDK. AI Search is not available inside a custom app, so search runs in the customer’s own app.
Prerequisites to check before switching a mode on
Start with AI Search. Enhanced chat in a Service Portal needs AI Search enabled on the portal, and the portal must carry the Faceted Search widget. The default Typeahead Search widget is needed for the full-page option. Customised widgets should be reconciled with the latest versions first.
Switching enhanced chat on also moves that portal to the VA Search Profile, which replaces the search profile named in the portal’s search application configuration. Search results on that portal can change after the switch, so review them. A chat-only setup does not need AI Search, but the default chat widget button must still be present.
Premium chat needs two further checks. The instance must qualify, and the network must allow traffic to the premium chat service. Organisations with an allow-list firewall must add the premium chat service domains to their outbound list before enabling it. Without them, chat fails or looks unresponsive.
Setting up Microsoft Teams and Slack
Slack needs AI Search enabled first. An admin completes the setup for each channel.
For Microsoft Teams, the admin opens Assistant Designer, selects the Assistants tab and chooses Edit on the default ServiceNow Otto for Virtual Agent tile. The assistant chosen must already be integrated with the Teams tenant, so confirm that first. On the assistant’s configuration page, the admin opens display experiences, selects Channels, chooses the Teams channel and saves.
For Slack, the admin opens Assistant Designer, selects Edit on the Slack-integrated assistant and confirms it is linked to the correct workspace. Under display experiences, the admin ticks the Slack channels to use. Then, under chat features, the admin ticks the option to allow response streaming and saves.
Setting up Google Chat and Microsoft Copilot
Google Chat requires the virtual agent admin role together with the external app install admin or admin role, and starts with a self-configured bot. Update the version field on the Google Chat app, then select the bot under the assistant’s display experiences and channels. In Channels and Integrations, open the Google Chat tile, manage the self-configured bot, edit its configuration, tick the Google Chat box and save. The bot’s configuration tab then offers a manifest zip to download. Premium chat notifications are not supported for Google Chat at this time.
Microsoft Copilot reuses the Teams integration. A Copilot user can get answers and take actions from Copilot itself, and Copilot can hand a request off to Otto in Teams. The Custom Engine Agent replaces the older Declarative Agent and gives Copilot full access to Otto, including multi-turn conversations. It requires Teams plugin version 10.1.1 or higher. The route also needs a Copilot licence, or the free Copilot chat licence, and the Xanadu release of the Conversational Integration with Microsoft Teams application.
System properties that shape chat behaviour
Several behaviours are set through system properties, some of which sit only in the System Property table.
| Property | Default | What it changes |
|---|---|---|
| sn_nowassist_va.enable_suggested_queries | false | Search queries feed the greeting for later conversations |
| sn_nowassist_va.max_suggested_queries | 6 | Maximum number of suggested queries in the greeting |
| sn_nowassist_va.enable_nass_show_all_option | false | Displays the View all topics link on the chat’s greeting screen |
| com.glide.interactive_view.enabled | true | Opens the interactive side panel beside the chat |
| com.glide.cs.doc_qna.va_attachment.max_attachments | 3 | Attachments allowed at one time |
| sn_nowassist_va.use_planner2_response_as_fallback | false | Set to true for an LLM-written fallback message |
Frequently asked questions
Which chat mode should a team choose first?
Standard chat is the simplest, since it needs no search setup. Enhanced chat suits portals that want the search bar and chat to work together. Premium chat suits instances that qualify and want contextual help across the platform.
Does enhanced chat need AI Search?
A chat-only setup does not need AI Search, but the portal still needs the default chat widget button. The search side of enhanced chat, including the full-page option, depends on AI Search being enabled.
How long does a chat stay active?
An active chat moves to the closed list after two hours of inactivity. The Conversation Idle Timeout field on the messaging channel record sets that limit.
Can users reach a person from the chat?
Yes. In standard chat, the admin picks the escalation route during guided setup: a live agent or a record producer that creates an incident or case. Premium chat offers a live agent request, and one live agent chat can run at a time.
Can Otto for Virtual Agent work inside Microsoft Copilot?
Yes, through the Teams integration. It needs Teams plugin version 10.1.1 or higher and either a Copilot licence or the free Copilot chat licence.
For a broader view of how Virtual Agent fits into self-service, see the hub page and the Virtual Agent guides.