OBLYTECH Logo
OBLYTECH Logo

Migrating NLU Topics to LLM Topics in Virtual Agent

Migrating NLU topics to LLM topics in Virtual Agent creates an LLM copy of each NLU or keyword topic and leaves the original in place. LLM topic discovery then matches a user’s wording against a plain-language description, so the topic no longer needs linked intents, keywords or entity mappings. The real work is choosing what moves and rewriting descriptions.

What LLM topic discovery changes

NLU discovery is a chain: a model bound to the session language, an intent that clears a confidence threshold, and often backup keywords. LLM discovery replaces that chain with the topic description, which the assistant compares with what the user typed.

An LLM topic does not need a declared intent or backup keywords. It can pull entity values out of a sentence without a prior mapping to an input node, and it can handle several topic switches in one session. For the wider concept behind these topics, see Virtual Agent topics explained.

Decide which NLU topics to migrate

NLU topics still suit predictable, structured conversations. The case for migrating rests on other signs: users phrase one request in many ways, similar topics keep getting misclassified, conversations lean on follow-up questions, or topics change often enough that maintaining utterances and retraining models takes real effort.

Sort the inventory in three passes. Retire topics with little or no usage rather than moving them. Check whether an existing topic already covers the case. Then rank what remains.

Priority Topic profile Reason
Migrate first High-volume topics Each discovery miss affects many users
Migrate first Frequent discovery failures The gain is largest where matching fails today
Migrate first Highly variable phrasing or multi-language use Description-based matching handles wording variation
Migrate later Predictable topics that already work well Little gain for the effort

Plan how NLU and LLM topics coexist

NLU and keyword topics are not available in LLM assistants, and LLM topics are not available in Virtual Agent for NLU. An LLM assistant does not fall back to NLU topics, so a topic you have not migrated is not discoverable there. Before moving a portal or channel to an LLM assistant, confirm that the topics its users need have been migrated or replaced. The Brazil release also marks Virtual Agent for NLU and Virtual Agent Lite for future deprecation, so plan existing NLU work now.

Migrating NLU topics to LLM topics, step by step

Confirm the prerequisites first. The user needs the virtual_agent_admin role or the sn_vad_genai.topic_migration_admin role. ServiceNow Otto for Virtual Agent must be installed, the Now Assist Topics skill must be turned on, and AI Search and ServiceNow Otto for AI Search must be installed and activated for Virtual Agent. When you update the Otto plugins, update the parent plugin first so dependent plugins follow in order.

Navigate to All > Conversational Interfaces > Assistant Designer, select the Asset library tab, and then select Migrate Topics to LLM.

Step What happens What to check
Select topics Choose the NLU and keyword topics to move Migrate fewer than 50 at a time
Review connections Topic blocks, notifications and Proactive Triggers tied to the topics are listed Dynamic topic blocks must be selected by hand
Settings Assistants, naming and description handling apply to the batch Assistant association controls where a topic is discoverable
Migrate topics Statuses move from Not started to Complete or Failed Keep the window open, then download the log
Review descriptions Edit each new description and optionally test it against the original utterances Fix flagged items before publishing
Publish Publish the topics you choose Unpublished topics stay on this step until you leave

Topic blocks publish automatically once migrated.

Two settings need thought. Assistant association decides where a migrated topic can be found. Testing a primary assistant includes topics from its secondary assistants, but testing a secondary assistant does not include primary ones.

The Keep current topic descriptions? switch is off by default. Left off, generative AI writes each description from the topic’s NLU intent, or from its keywords when there is no intent. Turned on, existing NLU descriptions carry across, which can cause issues for topics that had no description, and those topics need a description added before they publish.

Write descriptions that discovery can use

The description now does the job the NLU model used to do. LLM topics require a topic description, and a migrated topic with an empty one needs text before publishing.

Migrated NLU utterances make weak descriptions because they capture phrasing rather than purpose. Describe what the topic handles and what the user is trying to finish. A strong holiday calendar description names the kinds of question a user is likely to bring to it, such as what falls on a given date or whether they are off work on a particular day. A weak one just names the subject, which leaves the matcher guessing.

Lead with an action verb or a direct command. Write the wording as a direct request, and avoid prompts that invite a question in reply. Leave out pronouns and third-party references, because removing the subject generally stops the model attaching the request to the wrong person.

Node names matter too, because the LLM uses them to map input. Near-identical names such as AD Operation Type and AD Operation invite mis-mapping. Names that state the operation, such as AD Operation for Password Reset and AD Operation for Locked Credentials and Change Password, keep the mapping clean.

For input nodes, list the values to extract in the Detail description, with a value map that pairs each key with the phrases users are likely to say. If the input contains a phrase tied to a key, the key is extracted, so a reset key can be triggered by locked, expired or unable to sign in.

Migrated prompts behave in two ways. Plain text moves across unchanged. A script or data pill is replaced by a generic line built from Collect and the node name, and the Detail description field needs revising. Replace that line with a real instruction.

Read the migration log and fix flagged topics

The migration log lives in the topic_migration_execution_item.list table and downloads as CSV from the migrate step. It records each issue raised, the migration status and the source NLU topic.

Some issues block publishing until corrected. Others let you publish, but the topic still needs revising.

Issue in the log Can it publish? What to do
Node-level validation problem, such as a missing name or description No Correct the listed nodes
Topic-level missing required field No Fill in the topic property
Topic has no description No Add one on the Publish step or in topic properties
Script or data pill in an NLU input prompt Yes Rewrite the generic Collect line
Description not generated because the intent is missing, mis-mapped or has no keywords Yes Write the description by hand
Dynamic topic block not converted Yes Migrate the block and update its name in the script
Switch topic script not converted Yes Select the referenced topics; the script keeps using the NLU topic until then
Process failure during migration, node transformation or publish payload No Needs correction on the platform side

Publishable issues are the ones teams tend to leave behind. A topic that publishes with a switch script still pointing at an NLU topic keeps using the old path, so treat it as open work.

Test discovery and pilot one channel

Test from the Assistant Designer Asset library by selecting the topic and then Test. The chat window opens in the ServiceNow Otto chat widget.

Type the request into the chat. Clicking a topic from a menu proves nothing about discovery. If the topic belongs to several assistants, select Test skill discovery and choose the assistant under test, because results depend on it.

The test window shows what to change. Thumbs-up and thumbs-down feedback appears on LLM utterances, and the Analysis tab shows scores. A low score or an Unsure or Unknown rating points back to the description or the node instructions.

Discoverable and Visible are separate settings. A discoverable topic is invoked when it matches an utterance; the Show me everything button in the greeting lists the available topics. A topic must be Active before it can be marked discoverable.

Pilot the first batch in one channel. Watch fallback rates and discovery misses, refine the descriptions behind them, then move the next batch.

Frequently asked questions

Does migrating remove my original NLU topics?

No. The migration creates an LLM copy and leaves the NLU or keyword topic as it was. You review, edit and publish the copy.

Can an LLM assistant fall back to an NLU topic?

No. An LLM assistant does not fall back to NLU topics, so a topic you have not migrated is not discoverable there. Migrate or replace the topics a channel needs before moving that channel.

How many topics should go into one batch?

Fewer than 50, which leaves time to review and test before the next group starts.

Why will a migrated topic not show up in chat?

Check that the topic is published, associated with the assistant under test, and marked Discoverable. Then type the request into the chat rather than clicking the topic, and compare the description with the wording users actually type.