A CMDB certification task asks a named reviewer to check the field values on a set of configuration items and mark each certification field as certified or failed. Administrators can start a policy on demand, reviewers work through records in CMDB Workspace, and a reset returns a task to Review not completed. Each step has its own role requirement.
What a certification task asks the reviewer to do
Information in the CMDB arrives from several places. Discovery populates it, third-party tools import into it, and people enter records by hand. Some of that information has to be checked for accuracy, for regulatory or procedural reasons, and certification is the mechanism for doing that check on a schedule. For the general idea behind this kind of review, see the concept of attestation.
A certification schedule defines which fields on which table need verifying. Certification can target specific fields, such as operating system and CPU count, on a filtered group of records, for example all Windows servers in one location. The schedule generates the tasks and assigns them automatically.
Each policy execution creates a certification instance, which groups that run’s certification tasks so progress can be read as a whole. The task owner performs the work. On the Core UI build, the Certification Task Escalations workflow sends automatic reminders to the task owner and the assignment group once 50 percent of the time before the Complete by date has elapsed. The owner’s manager also receives them, where one is set, at 75, 95 and 100 percent of that time. The Data Certification experience in CMDB Workspace does not provide escalation.
Within a task, the column headers with a check mark are the certification fields, meaning the values being verified. Other columns are display fields that help the reviewer recognise each record.
Running a certification policy on demand
Scheduled runs are not the only way to start a check. In CMDB Workspace, a user with the sn_cmdb_admin role can run a certification policy whenever it is needed, regardless of the policy’s recurring schedule. A manual run does not interfere with the policy’s specified schedule.
The route is Workspaces, then CMDB Workspace, then Governance. Open the Data Manager link under Management tools, then select Policies in the Data Manager navigation panel. Run the policy from its tile in the Published policies section or from the policy’s details page, then confirm in the Run Policy dialog by selecting Run.
Two limits apply. Only one policy can run on demand at a time, and the policy you choose must not already be running.
Finding your tasks and reassigning them
Reviewing requires the sn_cmdb_user, sn_cmdb_editor or sn_cmdb_admin role. Open Workspaces, then CMDB Workspace, then Tasks, and select Certification in the Tasks navigation panel. Managers see the tasks of their direct reports, and user group managers see the tasks of members in their group.
The reassignment options depend on the situation. If an unassigned task belongs to you, select Assign to me from the Reassign menu. If a task was assigned to you by mistake, use Request reassignment, give a reason and submit it. If you know the right reviewer, use Reassign to move the task to another group or user, with a reason. Several tasks on the same page can be reassigned in one action.
Cancelling is a separate permission. A certification task can be cancelled only while it is In progress or Not started, and the role needed is data_manager_admin or sn_cmdb_admin.
Certifying, failing and editing field values
Select the records you want to conclude in the Review not completed tab, then choose Certify or Fail. For bulk work, tick the check box in the first column header and select the link that offers all items in the list. The result applies only to fields still waiting for review. A field already marked as certified is not changed by a bulk Fail, so a bulk action will not overturn an earlier decision on that field. Records with a concluded review move to the Review completed tab, where their results and field values can still be changed.
Reviewing one record at a time gives more control. Select a single record and its field values appear in a field review section on the right. When you select several records, the values are hidden. In that section you can fail selected fields, certify selected fields, or choose Edit fields. After you correct a value and select Update, you can certify the updated field. Select all fields applies the chosen result to every field on the record.
Two policy settings change what you can do. If the policy disallows empty attribute values, a CI with empty fields cannot be certified, so the only option is to fail it until its empty attributes are filled in. If the policy disallows updates to field values, a non-compliant CI cannot be changed from the task, so it has to be failed.
When every record in the task has been reviewed, the Submit button becomes available. The Submit task link in the Ready to submit notification does the same job.
Handling records that failed review
Failed items collect in a separate list that updates as tasks are reviewed. Viewing this list requires the sn_cmdb_admin role.
Expand a task to see the records and fields that failed. The Element column names each failing field, and the Certification Document Id column links to the record. From there you can correct the value in the task, or open the record or CI form directly and update it there.
Resetting a task to restart the review
A reset restarts certification for a task. It sets every certification result on the task back to Review not completed, removes any comments added during review, and puts the task back on the list of tasks that need review.
A reset does not change field values that were updated during certification. Corrections already made to the records stay in place. Only the review results and comments are cleared.
Before you can reset a task, at least one attribute must already have been reviewed, meaning certified or failed. The role required is data_manager_user, and that user must have access to the task. Reset runs from Workspaces, then CMDB Workspace, then Tasks. Open the task, select Reset on the task page, then select Confirm in the reset dialog box.
Monitoring progress, retention and reporting
In CMDB Workspace, the Data Certification Dashboard manages certification instances and tasks and shows their progress, status and insights.
Retention is handled apart from other policy types. Certification policy execution records are excluded from routine cleanup. The archive rule for certification instances archives those records two years after creation and destroys them seven years after they are archived. Certification task records have their own archive rule, which also archives related records. This separation lets the retention period for certification records be extended.
Planning, activating and migrating certification work
The legacy Data Certification plugin is deprecated and no longer available for new activation. The latest experience is included with CMDB Workspace.
Planning comes before the first schedule. Answer three questions before creating one: what information needs certifying, when it is due, and who will perform the work. Creating a certification filter requires the certification_admin role, plus access to the tables the filter uses. For the wider governance context, see CMDB governance.
If an organisation used the legacy build on Core UI, its schedules might not appear automatically in CMDB Workspace. Open the Data Manager overview, select Import on the banner, and confirm the import into draft policies. Successfully converted schedules are deactivated. Assign to empty and Last run date are not migrated. Legacy certification tasks stay unchanged and can still be reviewed. The two builds are not synchronised, so a definition created in one does not appear in the other.
Domain separation has basic support in Data Certification. Users need the right domain permissions to see tasks in a separated domain. Changing the domain on a task changes who can view it, while changing the domain on an instance does not change how the application works.
Frequently asked questions
Can a reviewer certify a CI that has empty fields?
Not under a policy that disallows empty attribute values. The CI cannot be certified until its empty attributes are populated, though the reviewer can still fail it.
Why can’t I see field values when I select several records?
When more than one record is selected, the field values are not displayed. Select a single record to see its values in the field review section.
Does a reset undo corrections made during review?
No. A reset clears the review results and comments on the task, but field values updated during certification stay as they were.
Who can cancel a certification task?
The role needed is data_manager_admin or sn_cmdb_admin. Cancellation is available only while the task is In progress or Not started.
Can I run two certification policies on demand at once?
No. Only one policy can run on demand at a time, and the policy you start must not already be running. A manual run does not change the policy’s recurring schedule.