Making a subflow available to a conversation
A conversational subflow is a Workflow Studio subflow that a Now Assist conversation can run for a user. Preparing one takes five steps: turn on the subflows and actions skill, grant the right roles, use supported input types, add hint text to each input, and publish. Then run the compatibility check, mark the subflow conversational, and attach a skill.
What a conversational subflow does
A standard subflow runs when a flow or another subflow calls it. A conversational subflow adds a second entry point: a person describes what they need, the assistant asks for the missing values, and the subflow runs with the answers.
Workflow Studio offers a selection of preconfigured subflows that are available to run from Conversational Interfaces.
Preparing a subflow for conversation
Work through these items in order:
- Turn on the subflows and actions skill.
- Give the people who build and test the subflow a role that reaches conversational features.
- Choose inputs whose data types are supported for conversations.
- Add tooltip hint text to each subflow input.
- Publish the subflow.
Hint text is a required step for each input, so write it as the question a requester would answer. “The mailbox address the message should come from” gives the assistant more to work with than “Sender.”
Running the compatibility check
Open Workflow Studio, select Subflows, go to the Conversational compatible tab, and select Run compatibility check. Admin, flow_designer or now.assist.creator permissions are required. By default the check covers only subflows created since the last check. Select Complete scan to check all subflows, which is the option to use after an existing subflow changes.
The check runs in the background, and it takes longer as the number of subflows grows. Conversational settings can be configured only for subflows on the resulting compatible list, so a subflow that is missing from it needs the check run again. Run the check after each create or update.
Supported input data types
A subflow or action must include only inputs with supported types to be compatible with conversational interfaces. The platform type names and the Workflow Studio labels differ, so the table gives both.
| Platform data type | Workflow Studio label |
|---|---|
| array.string | Array of Strings |
| boolean | True/False |
| calendar | Calendar Date/Time |
| choice | Choice |
| date | Date |
| datetime | Date/Time |
| date_time | Date/Time |
| document_id | Document ID |
| due_date | Due Date |
| glide_date | Date |
| glide_time | Time |
| glide_date_time | Date/Time |
| GUID | Sys ID (GUID) |
| html | HTML |
| integer | Integer |
| long | Long |
| longint | Long Integer String |
| reference | Reference |
| schedule_date_time | Schedule Date/Time |
| string | String |
| string_full_utf8 | String (Full UTF-8) |
| table_name | Table Name |
Configuring the conversational settings
Open the subflow from the Subflows list, open Conversational settings from the side panel, and select an existing skill or create a new one. The general settings control whether the subflow can be reached at all.
| Field | What it controls |
|---|---|
| Is conversational | Makes the subflow callable from a conversation through the skill |
| Subflow skill name | The name the virtual agent shows in its list of topics |
| Subflow skill description | Search terms and keywords a user might type to call the subflow |
| Assistants where subflow is discoverable | The virtual assistants that can surface the skill |
| Roles which can access this | The roles a user needs before the skill appears to them |
The description is matched against what users type, so list the phrases a requester would actually use. Generate skill metadata can fill empty description fields with generative AI. It does not overwrite text already in place, so write the descriptions you care about first.
Roles must be set in both the subflow settings and the conversational settings. Use the condition builder to specify who sees the skill. Creating records in the sys_email table requires sn_conv_fa.csa_email_write by default.
Inputs and outputs
The Show/hide checkbox controls whether an input or output appears in the conversation. A mandatory field cannot be hidden until it has a default value. A visible input with a default lets the user accept it or type something else. A hidden input with a default passes its value without asking the user anything.
Describe this input and Describe this output hold the search terms for each field. Mandatory inputs and outputs must have a description.
Override with reference lets the user choose an existing record value from a table and reference field instead of typing one. Pick a field with meaningful, unique values; a name field on the user table is a typical example. The option is offered for Email, Integer, Long, Long Integer String, String and String (Full UTF-8) inputs. It is not offered for GUID inputs, because each table already stores a unique Sys ID, so a GUID input does not need it. It is not offered for Document ID or Reference inputs, which are overridden automatically with display values. A condition on the reference lookup narrows the list.
Advanced options
- Include in discovery makes the subflow discoverable from a virtual agent.
- Include in list of topics adds it to the list of topics the agent offers.
- Promote skill moves it higher when a user asks to see all available skills.
- Use autonomous mode lets the subflow create, view, update or delete records without asking for confirmation.
- Enable follow up retains the context of earlier messages, so a user can add details or ask follow-up questions.
- Show errors from subflow and actions shows the specific error message from the subflow. When it is off, the user sees a generic message.
- Channels sets the default channels where the subflow is available.
Save the skill when you finish, or use Save and test.
Testing before users see it
The person testing needs the flow_designer role. From the Subflows list, select the subflow, choose Test, and pick Trigger via a conversation. The other option, Trigger by entering inputs, runs the subflow without the conversation layer.
Select the skill and the AI assistant, then run the test. Answer the assistant’s questions as a requester would, then review the execution details.
Building with Now Assist
From Workflow Studio, choose New > Subflow and select the Build with Now Assist tab to generate an outline from text, an image, or both. The preview can be regenerated after you change the directions. Each generate or regenerate counts as an assist on your Now Assist subscription.
Roles for conversational access
Roles govern who can change conversational settings and who can run the skill.
| Role | Access it grants |
|---|---|
| Virtual Agent administrator (virtual_agent_admin) | Read and write to Virtual Agent tables, conversational experiences and Now Assist admin operations |
| Workflow Conversational Admin (sn_conv_fa.conv_fa_admin) | Read access to flows, subflows and actions; read and write to conversational experience settings |
| Flow/Action Designer Conversational Workflow (sn_conv_fa.conv_fa_designer) | Read and write to conversational experience settings; limited access |
| Action Designer (action_designer) | Read and write to Workflow Studio actions; limited access |
| Flow Designer (flow_designer) | Read and write to Workflow Studio flows and subflows; limited access |
| Email Write (sn_conv_fa.csa_email_write) | Write access to the sys_email table for conversational subflows and actions |
Use a specialized role wherever it covers the work, and reserve the admin roles for the people who maintain the configuration.
Choosing the language model for generated descriptions
Generated descriptions use a default language model, set by an admin in the OneExtend capabilities list, filtered to the Conversational subflows and actions application. Two records apply: the Input output description generator and the Skill description generator. On each record, open the OneExtend Definition Configs tab, set Default to true for the chosen model and false for the others, then select Update. The Australia release lists Anthropic Claude, Azure OpenAI, Google Gemini and Now LLM as preconfigured options. This setting affects only description generation, not how the subflow runs.
Frequently asked questions
Can one subflow have more than one conversational skill?
Yes. Open Conversational settings and choose Create a new skill. Each skill has its own name, description and role settings, and the panel lists existing skills first.
Why does a subflow not appear in conversational settings?
Only subflows on the conversational compatible list can be configured. Run the compatibility check, using Complete scan if the subflow changed after an earlier check.
Can an input be collected without asking the user?
Yes. Give the input a default value and hide it with the Show/hide checkbox. A mandatory input needs a default before it can be hidden.
What does a user see when the subflow fails during a conversation?
That depends on the Show errors from subflow and actions option. When it is on, the user sees the error message defined in the subflow. When it is off, the user sees a generic message.
Does the language model setting change what the subflow does?
No. The default model generates descriptions for skills, inputs and outputs. The subflow logic is unaffected.
Where this fits
A conversational subflow is still a subflow. If the building blocks are new, read the subflow concept page first, then return to the Flow Designer hub to add the conversational layer.