To add a configuration item by hand, use the create experience in CMDB Workspace, where the Identification and Reconciliation Engine checks identification rules and flags duplicates before saving. To change a CI’s class, edit its Class field, but treat downgrades and switches with care, since attributes the new class lacks are dropped.
Creating a CI by hand in CMDB Workspace
Manual creation suits configuration items that discovery will not produce for you. The create experience applies IRE processes and the requirements of the chosen class, so the identification rules enforce uniqueness before the record is saved. The form asks for identifier attributes because the class’s identification rules need them to decide whether the record is unique.
Two ways into the create experience
The first entry point is the Create CI quick link on the Home view of CMDB Workspace, which opens a Select class page. The second is to drill into a class group bar on the CI Summary tab of the CI overview tile. The drilled class then becomes the class of the new record, provided an administrator has not excluded it.
Classes without a valid identification rule appear grayed out and cannot be chosen. For an excluded class, the list shows a New button that creates the record through the classic Core UI without IRE processing, so the duplicate and identification checks are skipped.
Working through the Create a new CI pages
The flow runs in a fixed order, and each page depends on the answers before it.
| Page | What you enter | What to watch for |
|---|---|---|
| Select class | The class from the drop-down list | Classes without an identification rule cannot be selected |
| Required attributes | Mandatory attributes, identifier entries, and a dependent-upon CI where needed | Criterion attribute sets decide what makes the record unique. Continue after the identifier values runs the duplicate check; a match opens the CI already exists dialog with Review existing CI |
| Additional attributes | Values for attributes an administrator has requested | The requested fields appear here |
| Relationship definition | Relationships to other CIs | The parent or child role depends on the relationship type |
| Review | Confirm the summary | Create saves the CI; Back changes the definitions |
The criterion attribute drop-down omits any set built on the Product instance identifier attribute. Relationships to the User and Group tables can be created, but IRE does not process them, so do not expect the same reconciliation treatment for those links.
The role needed is cmdb_manual_ci_ire_access, which the sn_cmdb_editor role contains by default.
What the new record looks like afterwards
A manually created CI gets a discovery source of Manual via IRE and an operational status of Design until it is configured, after which you change it to Operational. A developer who needs follow-up work after a create can implement the ManualCreateCIExtPoint extension point, using getAppId() and postInsertCI().
Drafting a CI with the agentic workflow
For people who are not CMDB specialists, the create-CI agentic workflow takes a plain-language request. It confirms the class, asks for what the identification rules require, checks for duplicates, and then creates the record. In the Australia release, the create-CI agentic workflow runs as ServiceNow Otto. In the Xanadu release, a CI creator agentic workflow sits under Now Assist for CMDB.
It can suit tables that operational technology teams populate, where physical equipment is entered by hand rather than picked up by discovery.
Start it from the Create CI quick link, or from the Otto icon by typing a request such as create a CI. Role requirements depend on the version. In the Otto line, versions 2.4 and earlier need sn_cmdb_editor and now_assist_panel_user. Version 2.5 needs sn_cmdb_admin with now_assist_panel_user. Version 3.0 uses sn_cmdb_editor with now_assist_panel_user.
Controlling which classes and attributes appear
Narrowing the class list
By default the class list for a new CI holds nearly the whole CMDB hierarchy. Narrow it with config identifiers. Settings live in the sn_cmdb_ws_ci_class_config table. Each row names a config identifier, a CI class, an Active flag, a Feature field preset to Create CI, an Apply to hierarchy flag, and an Operation that includes or excludes the class. Create one identifier for each class or branch you want to include or exclude. A workspace without its own identifiers falls back to the Default entry. Editing needs sn_cmdb_ws.config_editor.
Requesting extra attributes
The same framework lets an administrator request attributes during creation. Requests live in sn_cmdb_ws_ci_additional_attributes, with a config identifier, a CI class, an Active flag, the attribute list, and an Apply to hierarchy flag. Set these requests and class limits before users start creating CIs, so they do not face the long default list.
Reclassifying an existing CI
Reclassifying changes a CI’s Class attribute. The change can move a CI to a more specific class, to a parent class, or across to another branch. The roles needed are sn_cmdb_editor, asset, or itil.
Each class has its own attribute set, derived from its parent plus its own additions, and reclassifying adjusts that set to match the new class. Attributes the new class does not define are removed along with their values. A new record is inserted into the new class table, keeping the CI’s original sys_id.
Upgrade, downgrade and switch
| Operation | Direction | Example | Effect on attributes |
|---|---|---|---|
| Upgrade | To a more specific child class | cmdb_ci_computer to cmdb_ci_server | The child class’s additional attributes are added |
| Downgrade | To a parent class | cmdb_ci_server to cmdb_ci_computer | Attributes that the child class alone defines are not carried over |
| Switch | To a class on a different branch | cmdb_ci_linux_server to cmdb_ci_win_server | Acts as a downgrade followed by an upgrade, so attributes are lost as in a downgrade |
Avoid downgrades and switches where you can, because they can lead to data loss. If one is necessary, record the attribute values you need before making the change.
To change the class, open a list view for the class, such as the server list, and confirm the Class column is shown. If it is not, personalize the list to add it. Double-click the Class value, choose the new class, and confirm with the green check box.
Reclassification during IRE processing
Reclassification also happens during data loads, and automatic reclassification is on by default. Three system properties control it: glide.class.upgrade.enabled, glide.class.downgrade.enabled, and glide.class.switch.enabled, all true in the base system. Setting one to false makes IRE reject that reclassification in the payload and create a reclassification task for review.
A second set of properties sits above these. The glide.identification_engine.update_without_upgrade_enabled, update_without_downgrade_enabled, and update_without_switch_enabled properties are false in the base system. Setting one to true lets IRE apply the attribute updates in a payload while skipping that class change, and these take precedence over the first set. Per payload item, classUpgrade, classDowngrade and classSwitch override the glide.class.* settings, and updateWithoutUpgrade, updateWithoutDowngrade and updateWithoutSwitch match the update_without_* settings, on the CreateOrUpdateCIEnhanced() and createOrUpdateCI() APIs. Reclassification is limited to pairs of classes whose identification rules are identical.
Restricting reclassification with rules
A reclassification restriction rule blocks one class change while the rest of the payload still updates the CI. Rules live in the cmdb_ire_reclassification_restriction table, with a name, a source table and inheritance setting, a target class and inheritance setting, a type of Downgrade or Switch, and an Active flag. A rule covers one direction, so block both directions with two rules. Creating rules needs the sn_cmdb_admin or itil_admin role. sn_cmdb_editor and itil have read access only. The glide.identification_engine.reclassification_restriction_rules_enabled property is true by default, and the skipReclassificationRestrictionRules payload flag tells IRE to ignore the rules for one item.
Rules suit cases where a connector might push a CI into a class that loses data.
Keeping CI records healthy after creation
Marking attributes as mandatory
In the CI Class Manager, select the class in the Hierarchy view, expand Class Info, open Attributes, click Added, and double-click the Mandatory value of the attribute to set it to true. Editing the dictionary needs sn_cmdb_admin or itil_admin plus personalize_dictionary. The setting is global, so the field is flagged on each form where it appears. The Required metric feeds the completeness KPI, and the CMDB Health dashboard reports the share of CIs with one or more empty required fields.
Deleting CIs from the CI Class Manager
Deleting needs sn_cmdb_admin or itil_admin. Open the CI Class Manager, select the class, choose CI List, tick the CIs, then use Actions on selected rows and Delete. Large policy-based cleanups belong in CMDB Data Manager.
Deleting a CI that another CI depends on removes the dependent relationship. The dependent CI becomes an orphan, is not deleted straight away, and the system then tries to cascade-delete orphaned dependents so stale records do not accumulate.
Frequently asked questions
Can I choose a class that has no identification rule?
No. The Select class page grays out any class without a valid identification rule, so it cannot be picked. The agentic workflow steers away from such classes too.
What happens to attribute values when a CI changes class?
The attribute set changes to match the new class. Attributes the new class does not define are removed with their values, and attributes both classes share are kept.
Why did a reclassification create a task instead of changing the class?
Usually one of the reclassification properties is set to false for that direction. IRE then rejects the change in the payload and creates a task for a person to review.
Does the create experience catch duplicates?
Yes. Pressing Continue after the identifier values checks for a match, and a match opens the CI already exists dialog so you can review the existing record.
For the class structure behind these steps, read the CMDB class explanation. For the wider CMDB area, return to the CMDB hub.