OBLYTECH Logo
OBLYTECH Logo

Cloud Catalog Item Order Forms: Fields, Visibility and Defaults

A cloud catalog order form is what a requester completes before a cloud resource is provisioned. You shape it through the blueprint behind the item: add a variable, then set it as mandatory or read-only, hide it, give it a default, and place it with the Order value.

What the order form is built from

Each field is a variable inside a variable set, and each variable set belongs to an operation on a blueprint. The Provision operation controls the form a requester sees on the first request. General Info and Provision are the two base variable sets, and extra sets create additional tabs.

Part of the form Where it lives What you control
Variable set Variable Sets related list on the operation Which tab the field appears on
Cloud variable Cloud Variables related list on the set Type, label, default, availability
Order value Order column on the set Position on the form
Rules Rules related list on a variable Changes to other fields at runtime

Adding a new field to the order form

Open the blueprint, select the Catalog tab and click the Provision tile. In the Variable Sets related list, open the set where the field should appear. For the first tab, that is General Info. Click New in the Cloud Variables related list, then work through the form.

  1. Choose the variable Type, such as Single Line Text, CheckBox or Date.
  2. On the Question tab, enter the label the requester reads. The Name fills in automatically in lower case.
  3. Use the other tabs for visibility, help text, default value and access rights.
  4. Click Submit, set the Order value, then click Try It on the form banner to preview the form.
  5. Go back and toggle the catalog item to Publish.

A lower Order value moves a field higher. In the example, an email address field with order 1 sits after the Logical Datacenter field and before the Cloud Account field.

One limit matters early. A field added this way is not available for orchestration. If an automation step needs the value, add the field through the cloud template or the blueprint instead.

Controlling mandatory, read-only and visible fields

To change an existing field, toggle the blueprint from Published to Draft first. Then open the Provision tile, select the variable set, and open the variable.

Setting Where to find it Effect for the requester
Mandatory Mandatory check box on the variable form Must enter a value when selected
Read only Availability tab Cannot edit; used to fill a value automatically
Visible Availability tab Field is shown or hidden
Variable set Variable Set form Field moves to another tab
Tooltip Question tab Text bubble on hover
Help text Annotation tab, with Show help selected Text shown above the field

Read only and default value work together. A read-only field shows its default and blocks edits. A field that is not read-only keeps the default, but the requester can overwrite it. Reference fields need the Sys ID of the record that holds the default.

Business Service is the worked default example on this page: it points at the Email business service record by Sys ID, is read-only, and is mandatory. Help text names Email as the default.

Setting default values

A default can be set in two places. A default on the property applies to all users with no conditions. A SetValue action on a blueprint rule applies when its conditions are met. Use the property when the default is the same for everyone. Use a rule when it depends on who is asking.

Defaults on a list field

The schedule profile field draws its choices from a pool that returns static names from the schedule profile table. The default must therefore match one name exactly. Enter it on the Default Value tab. The example uses an 8-5 weekdays schedule profile. The default must match the schedule profile Name value as text, so copy the name from the table rather than retyping it.

Defaults on a reference field

The business service field refers to a record, so its default needs a Sys ID. In the standard interface, not the Cloud Admin Portal, enter cmdb_ci_service.list in the application filter, find the service, right-click it and choose Copy sys_id.

Open the BusinessService variable form, create a rule with a name and description, save it, and add an action. Set Action Type to SetValue, Target Field to BusinessService, and Value to the Sys ID. Submit. The result matches a property default, but conditions can narrow it. For instance, the default can apply to members of a group that handles one service, sparing them a long list.

Location that follows the cloud account

The Cloud Account variable ships with two rules. ReloadLocation runs first and reloads the catalog form so Location gets a fresh value, passing the chosen account as a key value. TriggerChangeEvent Location then fires the rules attached to Location, including the reloads for OS Profile and Network.

Location choices come from the CloudLocationPool resource pool, which reads the Associated Datacenter table; the requester sees the Alias column. Those associations form when the administrator creates the cloud account and runs discovery on its datacenter. If the location looks wrong, check that table first.

Scripted values, removed fields and tabs

Three further patterns follow. A field can be removed for a group, such as hiding Cost Center for members of the Database group, using rules and a resource pool. A stack name can be built from the requester’s ID through a script include called by a rule action, while the field stays editable. Fields can also be grouped into tabs. To add a tab, create a variable set and move fields into it through the Variable Set setting.

Quota limits on template-based items

From the Australia release, quota checks apply to cloud template-based catalog items. A quota limit maps to a catalog, and a policy can send a notification, start an approval subflow, or both, once the limit is exceeded. In the example, a 20 GB storage quota lets a 40 GB volume provision the first time. The next request above 20 GB then fails.

A catalog not mapped to a quota gets no quota calculation. The stack count quota is a base system quota that counts active stacks and needs default limits for each user or group before it takes effect. The Resource Order Control policy starts in draft, and without a published policy, provisioning stops once a quota is exceeded. For setup steps, see the guide to automating cloud governance with quotas and policies.

Building the catalog item and its templates

Start in the Cloud Admin Portal under Design, then Cloud Catalog items, then New. Choose Source as Cloud Template or Custom; Custom requires an existing blueprint. New blueprints cannot be created from the Orlando release onward, so use a cloud template for new items. On submit, the system generates variable sets, lifecycle operations, rules, and pre- and post-provision operations.

For help choosing between template routes, see the guide to choosing a cloud service catalog template route.

Notes before you build

The Brazil release marks Cloud Provisioning and Governance as being prepared for future deprecation. On new instances it is hidden and no longer installed, though it remains supported. Legacy workflows are no longer supported from the Zurich release onward. Existing custom workflows can keep running, but new automation should use Workflow Studio flows and subflows. The overview of cloud provisioning and governance covers how these pieces fit together.

Frequently asked questions

Why does a new field not feed into orchestration?

A field added through the variable set is not available for orchestration. Add it through the cloud template or the blueprint when an automation step needs its value.

Can a requester change a default value?

Yes, unless the field is read-only. A read-only field gives the requester the default and blocks edits.

What does the Order value change?

It sets the field’s position on the form. A lower number moves the field higher. Use Try It after each change to check the result.

How exact does a schedule profile default need to be?

The default must match a schedule profile name exactly, because the pool returns static text. Copy the name from the table rather than retyping it.

What happens when a quota is exceeded?

The first request over the limit can still succeed, as in the 40 GB example. The next request above the limit fails. A published policy can also send a notification or start an approval.

Do I need to republish after editing?

Yes. Toggle the blueprint back to draft before editing, then toggle the catalog item to Publish once the form is ready.