OBLYTECH Logo
OBLYTECH Logo

ServiceNow Security Center Scan Suites and Auditor Checks

A scan suite is a group of Security Center checks that run together. In the Brazil release you build one from the Scanner tab, add checks and child suites, and attach a schedule. The default Access Controls Auditor suite cannot be edited, so clone it. Findings from each run can be compared, and you can turn them into Security Tasks by hand.

What a scan suite is and where the Auditor suite fits

A suite is a collection of checks, and the scanner runs it as one unit. You can use a base system suite that ships with the instance or build your own. Auditor is the default base system suite. It holds security best-practice checks covering system properties, plugins and tables.

Defining suites deliberately matters because a stable suite can be rerun and its results compared with earlier ones.

Building a custom scan suite step by step

Creating a suite requires the admin role or the Security Center viewer role. Open the Scanner tab in Security Center, select Suites in the left panel, select New, enter a name and description, and save. After the first save, four tabs appear, and each one shapes the scan.

Tab What you do there What it changes in a scan
Checks Select Edit, pick checks, move them across with the add arrow, then save Sets which checks execute
Child Suites Add suites beneath this one Child suites also execute whenever this suite is used
Parent Suites Add the suites that should include this one Running a parent also runs this suite
Schedule Select New and enter the scheduled scan details Sets when the suite runs, using hour:minutes:seconds

Parent and child links support layering. A broad parent can call a narrow child suite that covers one area, such as public endpoints, so the narrow suite is maintained once and reused.

Cloning the Access Controls Auditor suite

The default Access Controls Auditor suite cannot be modified. If your practice differs from the default, duplicate it. The clone needs the admin role.

  1. Go to All, Instance Scan, Suites, then select New and enter a name and an optional description.
  2. Right-click the form header and select Save.
  3. In the Checks tab, select edit and add conditions. A filter such as Category is Security and Application is Global narrows the collection.
  4. Select run filter, choose the checks you need, and move them across with the add arrow.
  5. Save, then select Execute Suite Scan.

Start from All > Instance Scan > Suites. For the wider concept, see Instance Scan explained. To see what the default suite runs, open Auditor from the Suites list and review its Checks tab. Opening a check shows what it evaluates and the steps to correct any finding it returns.

What the Access Controls Auditor checks evaluate

Access control lists restrict data by requiring users to meet a set of requirements before they can interact with it. The Access Controls Auditor checks test the instance against eight criteria.

Criterion What gets flagged
SCRIPT processors Processors not protected by a CSRF token
Knowledge base contribution Knowledge bases with neither Can Contribute nor Cannot Contribute criteria
Empty ACLs ACLs with no security attribute, no role, or the public role
Client-callable script includes Scripts not secured by an ACL
UI Pages Pages not secured by an ACL
Tables Tables without ACLs
Dual-role users User records holding both internal and external roles
Public knowledge Knowledge bases and articles open to all users

Two deserve extra attention on an inherited instance. An empty ACL, or one that uses the public role, may provide open access to the content it protects. A dual-role account blurs the line between company staff and outside parties, which the access model relies on.

Reading the broader Auditor checks

Each Auditor check carries one of three finding types, which signal how much judgment it needs.

Finding type Examples
Resolution Recommended Out-of-date store apps, insecure GlideRecord calls, script includes with no ACL, empty ACLs, HTML sanitization disabled, UI Pages without ACLs, outdated password hashing, and several record producer and UI action checks
Review and Decide Large allowed IP ranges, public GraphQL schemas, public knowledge base articles, public REST endpoints, public Service Portal pages, public UI Pages, roles containing admin, users with valid local passwords
Inform Inactive security feature plugins

The JavaScript library check can be ignored on instances first provisioned on Tokyo or later, because its records carry deny rules by default. Instances provisioned earlier may still hold allow rules. Before you block a library, check the JavaScript Content provider Access Tracking table for the date it was last accessed.

Large IP ranges need a similar pause. A smaller CIDR number means a larger block, so block 8 is much bigger than block 16. If false positives pile up, adjust the largestExpectedCIDRBlock variable to match your network.

Public exposure findings call for a decision about intent: confirm the exposure is deliberate, or fix it. A public REST endpoint or page can be intentional, so the check asks for confirmation of intent rather than removal. The same logic applies to roles containing the admin role: if the grant is deliberate, mute the finding.

Local passwords need a conversation with the integration team. Users with a locally set password can authenticate through APIs even when local login is disallowed, and integration accounts depend on that. Keep a short, justified list and review the rest.

Reading results, findings and comparisons

Each run creates a scan result, listed under Results in the Scanner tab. A result shows its status, type and execution time in seconds. Read the Failures tab first when a result looks thin. It lists the failed checks with the error message for each failure. A check that errored tells you nothing about the instance, so treat it as a coverage gap until it is fixed.

A scan finding is a reference to a record that broke a check’s rule. It shows the source record, the details of the rule it broke, and how to resolve it. Each finding carries a priority from 1, the highest, to 4, the lowest.

Comparison needs at least two scans of the same suite. Select a scan in the Scan Suite list, then choose a First Scan and a Second Scan. The page shows finding and check counts at each scan, two charts of changed findings (by criticality and by security area), and a filterable list of findings. The Auditor suite findings page tracks the same idea over time. It charts findings between two chosen dates, and you can add a target, threshold, forecast, trend or statistics. The records list names the checks the suite ran, so a moving line can be traced back to a check.

Turning findings into Security Tasks

Security Tasks keep follow-up work in one place. Open them from All, Security Center, Security Tasks. Cards above the list filter the tasks to upcoming, overdue or open, and each card shows a running count.

Roles shape what people can do. Administrators can view, create, assign and delete tasks. The Security Center viewer role can view tasks but not create, edit or delete them. The Security Task manager role can work on assigned tasks but cannot edit tasks assigned to someone else.

Tasks can be created by hand with the +Create Task button or generated automatically. The automatic triggers are:

  • a metric breaching its threshold, with one open task per metric;
  • a security event notification firing, with one open task per policy;
  • the hardening score falling by the threshold amount or more, which defaults to 3;
  • a Customer Action being installed;
  • a new banner announcement being published.

The worked example is a score that falls from 97 to 94, which creates one task once the 94 score is calculated. A further fall to 91 the next day creates no second open task. Settings live under All, Security Center, Security Center Properties, where you enable or disable automated tasks and set the degradation threshold as a positive integer.

Scheduling a suite

A schedule decides when a suite runs unattended. Go to All, System Security, Security Center, select Security scanner in the Tools section, then Suites, open the suite, and use the Schedule tab. Changing a schedule requires the admin role or the Security Center viewer role.

Five fields matter here. Name labels the schedule. Run sets the frequency and reveals the timing fields. Active controls whether the schedule is live, and an inactive schedule does not execute, which makes it the first thing to check when a suite seems to have stopped. Conditional enables a Condition field where you write a script, and the suite runs when that script evaluates to true, which suits maintenance windows. Run as tz sets the timezone the schedule uses to decide when to start.

Frequently asked questions

Can I edit the default Access Controls Auditor suite?

No. Clone it, then change the copy and execute that.

Why does the security scan comparison page look empty?

It needs at least two scans of the same suite before it has anything to compare.

Who can create a scan suite?

Users with the admin role or the Security Center viewer role can create one, and the same two roles can change a schedule.

Should I act on each JavaScript library finding?

Not automatically. On instances first provisioned on Tokyo or later the check can be ignored. On earlier instances, check the access tracking table before blocking a library that is still in use.

For the console these tools sit inside, see the Security Center hardening console and compliance score. For the policy side, read security posture control in ServiceNow and the instance security and access control best practices.