OBLYTECH Logo
OBLYTECH Logo

Zero Trust Access in ServiceNow: Plugin and Policy Setup

Zero Trust Access in ServiceNow is two separate controls: Session Access trims roles at sign-in, and Continuous Authentication re-verifies users before they open sensitive tables or data classes. Each one needs its own plugin and a license, and configuring it requires an elevated role: security_admin for Session Access or ca_admin for Continuous Authentication.

Why the two controls are configured separately

Zero Trust Access starts from a plain premise: no user or device is trusted by default. Access follows least-privilege principles and identity is verified explicitly. The two features apply that premise at different moments.

Session Access acts at sign-in. It narrows what a user can do in one web session, using adaptive authentication policies built from IP address, location, role, group, identity provider attributes and user attributes. Continuous Authentication acts during the session. It guards chosen tables or data classes and asks for step-up authentication or single sign-on re-authentication when someone opens them.

Aspect Session Access Continuous Authentication
When it takes effect At sign-in, for the life of that session When a protected table or data class is opened
What it changes Removes or limits roles for the session Requires MFA step-up or SSO re-authentication
Plugin Zero Trust – Policy Based Session Access Zero Trust – Continuous Authentication
Role needed to configure security_admin ca_admin
License Paid, license required License required

Activating the plugins

Install each feature as its own plugin from the all available applications list under system applications. Search by name or identifier. If a plugin is missing from the list, it may need to be requested from ServiceNow personnel. Where domain separation and delegated administration are enabled, the installing user must sit in the global domain, or the install is refused. For that setup, see domain separation setup and administration.

Session Access comes from com.snc.zero_trust_session_access, a paid plugin. Continuous Authentication comes from com.snc.zero_trust_continuous_authentication, which also needs a license. For the SSO-based flow, add the multiple provider single sign-on installer, com.snc.integration.sso.multi.installer.

Switch on the properties next. Session Access depends on the Enable Zero Trust Session Access property, which defaults to false. Confirm it is enabled before testing. Continuous Authentication has a separate enable property. For the adaptive authentication side of Session Access policies, see adaptive authentication and trusted devices.

Building a Session Access role configuration

Each Session Access rule is a role configuration record with a name, a description, an adaptive authentication policy chosen through a lookup, an action, a role list and a group list. The action decides what happens when the policy matches:

  • Remove Roles takes the listed roles and their child roles away for the session at sign-in.
  • Limit To Roles keeps the listed roles and their children for the session and drops the rest.

Remove Roles suits an elevated role that should disappear from sign-ins coming from networks you do not trust. Limit To Roles suits a narrower working set. A fulfiller signing in from outside the trusted network can be reduced to a requester role for that session, so fulfillment privileges are unavailable during it. When one role appears in both lists, a system property sets which action takes precedence.

Keep three behaviors in mind:

  • Role assignments are not edited. The user’s role table and group memberships remain, and Session Access builds a reduced session at login.
  • The snc_internal and snc_external roles cannot be removed by a policy.
  • Scripts running in system context do not honor the reduced session roles, and integrations are not supported.

For the role model that these reductions work against, see role-based access control in ServiceNow.

Using identity provider attributes as policy inputs

Policies can read values that the identity provider sends in its SAML response or OIDC token, such as a risk score. Add the attribute as a policy input, then set a condition that covers a band of values. For example, a high-score band can remove an employee-level role while a moderate band leaves the full role set in place. Attribute-driven sessions also depend on the refresh token revocation interval, which defaults to 1800 seconds and must sit between the access token lifespan and the refresh token lifespan.

Configuring continuous authentication policies

Configuration requires the ca_admin role, an elevated role. ca_policy_admin can create, edit and view policies, and ca_auditor can view dashboards, policies and logs.

Complete the pre-work for each login path first:

  • Local and LDAP sign-ins step up with MFA. Users who have not set up MFA must do so first. From the Yokohama release, MFA is enforced for each local login. Confirm the MFA properties are active. For the other login methods on the platform, see ServiceNow authentication methods.
  • SSO sign-ins re-authenticate through the identity provider. The provider record needs its continuous authentication section completed and set active, and the readiness box on the multiple SSO record ticked. OIDC providers must redirect to the continuous authentication consumer endpoint and can offer re-authentication or their own MFA. SAML uses a default re-authentication script for all providers. Step-up scripts exist for Okta (ContinuousAuth_Okta_StepUp_Script) and for Entra ID or Azure (ContinuousAuth_Azure_StepUp_Script, which needs a claim added). For how single sign-on is set up in general, see single sign-on in ServiceNow.

Build the policy from the Policies tab of the Continuous Authentication application: select New, enter a name and description, and choose a table or a data class. Data classes are created through Data Classification and referenced in place of a single table, so one policy can cover a classified set of data.

Some tables cannot be protected. The sys_properties, sys_continuous_auth_policy and sys_user tables are excluded. Selecting a metadata table produces an error, and protecting one can affect configuration access for your users, so confirm that before saving the policy.

Select Save and Activate. The policy creates access control entries for the chosen resource, which the View ACLs action on the policy lists. For the mechanics behind those entries, see how access control lists work in ServiceNow. To test it, open the protected table as a user, select Authenticate, complete the prompt, and the table loads. Local users see an MFA step-up, and SSO users re-authenticate with the provider they signed in with.

High assurance sessions and their timers

A successful step-up creates a high assurance session that lasts for a set time. These properties control it.

Property What it controls Setting range or default
High assurance session length Minutes before the user must authenticate again 1 to 480 minutes
Default high assurance length at login Minutes granted at local login (default 5 minutes). Default 5 minutes
End-user display message Text shown when re-authentication is requested A default message is supplied
Failed attempts before logout Failed authentications allowed before logout 3 to 10

When the session length expires, the user must re-authenticate or step up again. The failed attempts setting caps how many tries a user gets before being logged out. For the wider session settings that sit alongside these timers, see session limits and hardening settings.

Users who handle high-privilege data, such as financial or personal information, can open a high assurance session in advance. Open the user profile, choose Profile, then select Create High-Assurance Session under Related Links and verify identity. That avoids repeated prompts during a long working session.

Mobile needs a separate decision. By default, high assurance is not required for mobile app sessions, even when a policy is active on the source table. Setting the mobile session property to false blocks mobile app sessions instead. Session Access on mobile is switched on through its own system property.

Monitoring, audit records and user messages

The Metrics tab reports total policies, protected classifications, failed step-up or re-authentication attempts, and how often policies are invoked. It displays 180 days of history, and a longer view requires a Performance Analytics license.

Audit retention is set per feature. Continuous Authentication keeps audit records for a period from 1 to 180 days. Session Access audit data defaults to 30 days and can be extended to 180.

Both features have a debug logging property. Enable it during an investigation and switch it off afterwards.

Common mistakes to plan around

  • A policy change does not reach a session already signed in. The user has to log out and back in for the new rule to apply.
  • Session Access is decided at sign-in. A user who moves from a corporate network to a VPN partway through keeps the access granted at login. For protection during an open session, put the sensitive resources under Continuous Authentication.
  • Turning off the Session Access property stops all reductions, so treat it as part of the control rather than a setting to toggle during testing.
  • Before protecting a metadata table, confirm your administrators can still reach the configuration they need.

Can ServiceNow staff reach our instance without our approval, and what does a customer approval setting not cover?

As of November 2026, support staff need your approval when the SNC Access Control plugin is set to require it. With that plugin, you can approve specified ServiceNow Customer Service and Support personnel for a defined time window and access type. It does not remove authorized ServiceNow Operations access to the underlying infrastructure.

What the approval setting covers

The approval control applies to Customer Service and Support access only. Each approval names the personnel, the time window and the access type. Those three fields form the record you review later, so define them before a support case needs access, not during one.

What it does not cover

Operations access to the underlying infrastructure sits outside your approval screen. Approval for Customer Service and Support therefore governs one access path. It does not answer who can administer the infrastructure beneath your instance, which is a separate question with separate evidence.

Permission records are a second gap. As of November 2026, new read-only permission records are distinct from older records that default to read/write. An approval process that reviews new requests alone can miss older grants that are still in place. Check the permission records themselves, not only the approval history.

Steps to check the support approval path

  1. Confirm whether the SNC Access Control plugin is installed and whether it requires approval. An unchecked setting is not evidence either way.
  2. Export the approvals granted over the review period, with personnel, time window and access type for each.
  3. Compare approved windows against the audit records you hold, and flag any window that closed without a review.
  4. List older read/write support grants and decide, grant by grant, whether each should stay. Read-only access is preferred where it is sufficient.
  5. Request a written description of how Operations access to the underlying infrastructure is controlled and reviewed.

The service trade-off

Restricting support access has a cost that the approval screen does not show. Restricted access may affect service levels, and availability measurement begins when necessary support access is granted. The wait for approval may therefore fall before measurement starts. Ask how approval time is counted before you agree to a restricted policy, and read the service terms alongside the security rules.

What to request in writing

  • The approval log for support access, with personnel, time windows and access types.
  • A list of support permission records, marking which are read-only and which are older read/write grants.
  • A description of how ServiceNow Operations access to the underlying infrastructure is controlled and reviewed.
  • The assurance report that covers that infrastructure access, with its service boundary and reporting period stated.
  • The written service-level terms that show how restricted support access affects availability measurement.

Frequently asked questions

Does Session Access delete roles from user accounts?

No. Role assignments and group memberships stay in place. Session Access builds a reduced session at sign-in, and the reduction applies to that session.

Can Session Access restrict a session that is already open?

Not for that session. The policy is applied at sign-in, so a user who changes network mid-session keeps the access they signed in with until they log out and back in. For checks during an open session, use Continuous Authentication.

Which roles are needed to set things up?

Session Access configuration needs security_admin, so an administrator elevates to it first. Continuous Authentication configuration needs ca_admin. Installing either plugin needs the admin role.

What happens when a user fails verification too often?

The failed attempts setting, which accepts values from 3 to 10, decides how many failures are allowed before the user is logged out.