OBLYTECH Logo
OBLYTECH Logo

CSDM Assessment: Scope, Sessions, Roles and Deliverables

A CSDM assessment measures how closely a ServiceNow instance matches the Common Service Data Model at each maturity stage, from Foundation Data through Fly. A platform architect runs it in a series of working sessions with the platform owner and data owners, ending in written findings and a next-step plan.

What a CSDM assessment measures

The Common Service Data Model sets out how applications, services, offerings and the infrastructure beneath them should be recorded in ServiceNow. The CSDM gives prescriptive guidelines for modelling services in the CMDB, so records for applications, services and their infrastructure follow one structure. An assessment checks whether an instance’s records follow the model and, where they do not, what needs to change.

Each assessment looks at the maturity stage being judged and at the mix of people, process and technology that creates and maintains the data. The broadest version examines all three together. Narrower versions focus on one stage but still ask who would act on the findings.

The five maturity stages

Stage What it examines Builds on
Foundation Data The foundation data that the rest of the CSDM relies on Starting point
Crawl Application Services and Business Applications Foundation Data
Walk Technical Services and Technical Service Offerings Foundation Data and Crawl
Run Business Services, Business Service Offerings, Request Catalog Items and the Business Service Portfolio Foundation Data, Crawl and Walk
Fly A scope option that can be chosen like the others –

The stages depend on one another. Crawl requires Foundation Data to be completed first, Walk requires Foundation Data and Crawl, and Run requires all three earlier stages. Judging business services while the application records beneath them are incomplete tends to produce findings that shift once those records are repaired. The CSDM implementation steps page sets out the phased order in more detail.

Choosing the scope before work starts

Scope is set in its own working session. The team reviews the CSDM guiding principles, then weighs the organisation’s priority applications and services against its current maturity. The options are one stage (Foundation Data, Crawl, Walk, Run or Fly) or an in-depth assessment of the agreed scope that examines people, process and technology. Testing the model against records from the services the business relies on tends to give more useful findings than reviewing abstract diagrams.

Packaging also shapes the choice. In the Yokohama release, the Foundation Data, Crawl, Walk and Run stage assessments are each offered in the Advanced package. The Maturity Assessment, in the Australia release, is offered in Guided+ with the Platform Governance add-on, in Advanced and in Total.

How the working sessions run

The full framework product, labelled Total in the Zurich release, runs the sessions below. The durations are stated maximums.

Session Length What happens in it
Introductory customer session Up to 60 minutes Sets the approach, the scoping process and the depth of deliverables
Kick-off working session Up to 2 hours Introduces CSDM, its value and the assessment dimensions
Current state discovery session Up to 1.5 hours Looks at the CSDM roadmap, priority applications and services, and their data models
Scope definition session Up to 1.5 hours Applies the guiding principles and agrees which stages and depth to cover
Customer review session Up to 2 hours Presents findings and recommendations and agrees the next steps
Follow-up session, optional Up to 60 minutes Covers questions and further leading-practice guidance

The five core sessions add up to eight hours of working time, plus an optional hour of follow-up. Those figures exclude the questionnaire and the access work that come before them.

The stage assessments follow the same shape with different timings. The Run assessment allows up to 240 minutes for its introductory session, 180 minutes for the current state session and 120 minutes for recommendations, and it relies on a self-assessment that the architect analyses between sessions.

The Maturity Assessment is built around a questionnaire instead. Each participant grades statements about people, process and governance independently, and the questionnaire should be completed at least two weeks before a readout of up to 1.5 hours. For a broader look at platform maturity that is not limited to CSDM, see the ServiceNow maturity assessment roadmap page.

Who needs to be in the room

The full product lists the roles below as required, together with a Technical Governance Board Lead and a Security Administrator. The Master Service Provider or Vendor Lead is optional and applies when an outside partner designs or builds on the framework.

Role What the role does in the assessment
Platform Owner Holds overall accountability for the ServiceNow platform and oversees its administrators
Platform Administrator Handles day-to-day administration and maintenance
Enterprise Architect Drives strategic investment decisions by understanding business capabilities
CSDM Data Modeler or Manager Keeps the model accurate and works with teams to certify their data
CMDB Manager Keeps the configuration database accurate and certified
Application Owner Manages a ServiceNow application
Application Service Owner Manages application services across a division
Service Portfolio Owner Owns a collection of services and monitors the portfolio
Process Owner Defines the process flow for a service or an ancillary process

Two roles are easy to merge and should not be. The Service Owner is a strategic role, typically at director level in IT, accountable for a service through its full life cycle without being involved in its daily operation. The Service Manager is the operational role that runs delivery day to day.

The stage versions also name a CSDM Champion or Sponsor, an executive who advocates for the framework across the organisation. Personnel can cover more than one of these roles, which is often the case in smaller teams.

What to hand over before the first session

The intake questionnaire and the self-assessment for the chosen stage are completed by the customer at least one week before the working session. The ServiceNow team provides them.

The full product also requests an organisation chart, the ServiceNow roadmap, the roadmap for technical applications and services, the CSDM RACI or governance model, the current CSDM and CMDB data models, and screen captures from the CSDM and CMDB Data Foundations Dashboards.

Access is the item teams tend to leave until last. The assessment inspects real records and tools, so the architect needs one of two arrangements: a temporary direct login with the roles and permissions required, or pairing with an employee who already holds those roles and can open the records during sessions. Agree the arrangement before scoping so the sessions do not stall.

What the assessment delivers and what it leaves out

The full product delivers a slide deck with supporting CSDM references, a Current State In-Depth Assessment spreadsheet with standard recommendations, and action planning notes. The stage versions deliver slides, a completed self-assessment and recommended next steps. The Maturity Assessment delivers a report, a results presentation and targeted recommendations, with a suggested plan for choosing what to implement.

The exclusions matter as much as the scope. The full product does not include a CMDB assessment, a detailed review of the model design, technical troubleshooting, CSDM technical remediation, Service Mapping troubleshooting, or a detailed review of technical governance processes. The Foundation Data, Crawl, Walk and Run stage versions also exclude discoverable configuration items such as servers, mobile devices and software. The Run assessment also excludes designing a services model and the catalog hierarchy or taxonomy. The Maturity Assessment has no technical review of the CSDM, and the provider is not responsible for putting its recommendations into effect.

Shorter coaching accelerators

Alongside the assessments sits a group of shorter products titled Jumpstart. They are short coaching sessions built around a demonstration and, in the Foundation and Crawl versions, a brief look at the team’s own data. They suit a team that already knows where its gaps are.

Jumpstart Your CSDM: Foundation shows that the foundation tables should be populated before the products that rely on them are configured. It includes a demonstration of the CSDM Data Foundations Dashboard in a coaching session of up to 90 minutes, with 30 days of access to a temporary instance. Jumpstart Your CSDM: Crawl covers business applications and application services and requires the Foundation accelerator first. Jumpstart Your CSDM for Service Operations shows the data needed to define business and technical services, their service offerings and the Service Instances those offerings depend on.

The Enterprise Architecture version, in the Brazil release, explains how business capabilities, business applications and information objects connect to application services and service instances. It requires a CMDB with at least foundational data in place. Teams wanting that architecture view can start with the CSDM domains and the CMDB classes behind each one reference.

Frequently asked questions

Do I need to complete the Foundation Data stage before Crawl?

Yes. The Crawl assessment requires Foundation Data to be completed first, and Walk and Run build on the stages before them in turn. Running a later stage on incomplete foundation records tends to produce findings that have to be redone once the earlier data is repaired.

Who must attend the sessions?

The full product marks the Platform Owner, Platform Administrator, Enterprise Architect, CSDM Data Modeler or Manager, CMDB Manager, Application Owner, Application Service Owner, Service Portfolio Owner and Process Owner as required. The Master Service Provider or Vendor Lead joins when an outside partner is building on the framework.

How does the Maturity Assessment differ from a stage assessment?

The Maturity Assessment works from a questionnaire that each participant completes independently, grading statements about people, process and governance. It produces a report and targeted recommendations. It includes no technical review of the CSDM, which suits a broad check of alignment rather than an inspection of records.

What does the Run assessment leave out?

The Run assessment excludes designing a services model and the catalog hierarchy or taxonomy. The Foundation Data, Crawl, Walk and Run stage versions also exclude discoverable configuration items such as servers, mobile devices and software.