Employee Center Pro sends employee communications through Content Publishing. A content manager picks a platform and a format, builds a content record, prepares the material, and decides where and when it appears, either with a publish plan or the Schedule content form. Setup covers plugin activation, a few properties and optional ownership rules that limit who can publish where.
What Content Publishing covers
The Content Library is the working area where a content manager builds, previews and manages records. The platform you choose first narrows the formats on offer, so settle the intended channel before opening a new record.
| Platform | Formats available | What employees receive |
|---|---|---|
| Portal | Rich content, news articles, styled content, video, URL, image-based link, events, banner, rich text, calendar | Pages, banners, links and dated events on the portal |
| Mobile | Mobile banner, mobile text card, mobile video | Content built for phones |
| Notification | Email, push to the Now Mobile app, SMS text, Microsoft Teams | Direct messages |
| To-do | Button Complete, E-Signature, Play Video, View Link | A task that closes when the action is finished |
| Pulse survey | Survey content | Feedback questions |
SMS notifications are capped by the SMS properties above, and Microsoft Teams campaigns run through the ServiceNow for Microsoft Teams integration. Rich content displays through the Rich Content (CD) widget. Styled content builds banners, blocks and video through form settings such as text color, text alignment and background color.
Setting up Content Publishing before the first publish
Install Employee Center Pro first, then activate Content Publishing. Activation also brings in the plugins it depends on and includes demo data, so plan how sample records will be hidden or removed before the portal goes live. Activation needs an admin role. When domain separation and delegated admin are both enabled, the administrator must sit in the global domain, or the plugin installation is blocked.
Content Publishing properties sit under Content Publishing > Advanced > Properties. The notification properties govern the scheduled jobs, and their defaults matter before a large send:
| Property | Default | What it controls |
|---|---|---|
| sn_cd.notification.event_stagger | 60 seconds | The pause between events during a run |
| sn_cd.sms_notification.max_recipients | 50,000 | Recipients for one SMS notification |
| sn_cd.sms_notification.max_users_per_event | 1,000 | Users added to one SMS event |
If an SMS exceeds the recipient limit, it is not sent, and the Schedule Content form shows Max Exceeded. The approval property sets whether all approvers must sign off on scheduled content (Yes) or a single approver is enough (No). Ownership properties switch on the restrictions covered below.
Content types link a category of content to the widgets that can display it. A user with the sn_cd.content_admin role opens Content Publishing > Advanced > Content Types and sets a name, a category (Portal Content, Notification Content, Community Content, To-do Content or Mobile Content), the associated widgets and an Active flag. A custom widget can show a content type when it is listed among that type’s associated widgets.
Creating a content record step by step
- Select the platform where the content will appear.
- Choose the content format that platform offers.
- Create the record in the New content form, entering a name and an order.
- Prepare the content: upload the image or video, assemble the banner or article, or enter the link.
- Translate the content if another language is needed.
- Configure publishing with a publish plan or the Schedule content form.
Use the Active option and publish plans to control availability, because content that is not active stays off the portal.
Translate finished content. The Localization Framework workflow can be set to translate and then publish the translated version.
Publish plans or the Schedule content form
The content type decides the route. News articles, rich content and portal content use a publish plan created from the Content Library. Mobile, notification, to-do and pulse survey content use the Schedule content form. Anything destined for the Workspace or UIB Workspace also needs the Schedule content form, because the Content Library does not offer those destinations.
Each scheduled item has three destination fields. Location is usually Service Portal, and news articles can also target the Now Mobile app. Page lists portal and taxonomy pages. Choose Widget first, and the Page list narrows to pages that contain that widget. The supported widgets for common types are:
| Content type | Widgets it can use |
|---|---|
| Banner | Content Experiences, Welcome Banner (CD) |
| Event | Upcoming Events (CD) |
| Calendar | Event Calendar |
| Image-based link | Quick Links (CD) |
| News article | News Feed, Featured News |
| Rich content | Rich Content (CD) |
| Rich text | Announcements (CD) |
| Styled content | Content Experiences, Styled Content (CD) |
| URL | Information Links (CD) |
| Video | Video Carousel (CE) |
The Schedule content form has two details that trip up new content managers. The date window does nothing until the record is Active, so a schedule can look right and still stay hidden. Scheduled content is ordered by Schedule Order first, then Content Order, then the publish plan start date.
Content availability and publish plans work as a pair
Content availability sits on the content item and answers when it can be accessed and by whom. You set the start date, end date and audience, then choose Save availability.
Publish plans sit on top of that. They set the widget location, the audience that sees the item there, and the display timeframe. A plan can widen the audience but cannot override the dates. If a plan shows an item before its availability start date, a reader who clicks through meets the message “Sorry, this isn’t available”. Check that plan dates fall inside the availability window before activating. A wider go-live check list appears in the testing and acceptance checklist.
To publish a news article, a user with the sn_cd.content_manager role saves availability, reviews the publish plans generated from any content template, edits them if the audience or dates need to change, keeps Active selected, and chooses Activate generated plans. Generated plans start inactive, so the item stays off the portal until that step. Editing the template later does not change plans that already exist, and moving the start date of a live news article means generating new plans.
Content engagement adds comments and reactions to news articles, and managers review any reported comments. The Allow comments, Allow replies to comments and Allow reactions properties are configured in Content Publishing and display checkboxes on the new content and content template forms. The Content engagement dashboard shows views, reactions, comments and reported comments for published content.
Limiting who can publish what
Content ownership lets an admin restrict publishing to named content managers across three areas:
| Ownership area | What the restriction controls | Typical example |
|---|---|---|
| Who (audience) | Which employees a manager can publish to | Geographic audiences |
| Where (topic or portal page) | Which topics or pages a manager can use | Designated topics |
| What (content item) | Which items a manager can create or edit | Sensitive material such as legal notices |
A system admin keeps full visibility. For the program-level view of who decides these rules, see the governance model. The sn_cd.content_admin role has full access inside restricted areas, and sn_cd.content_manager has restricted authoring and publishing access. A record becomes restricted once a user or group is assigned to it. Unassigned records stay open to all content managers, so test the assignments with a content manager account before relying on them.
Activation needs the Employee Center Pro and Content Publishing plugins, with Content Governance and Content Experiences added when those features are in use. Then turn on the Content Manager Ownership properties. Content managers can create audiences while Allow Ownership for Audiences is off, so decide who owns audience design before turning it on. For the wider access model, see Employee Center security and access design.
Translating employee communications
Translation through the Localization Framework needs the Localization Framework activated before the steps below. Activate the Localization Framework and the target languages, create a user group with the localization_fulfiller role and add translators to it. Activate the property that enables the framework integration, then create a Localization Framework setting for the Content Publishing artifacts, select the languages, set the workflow to translation followed by publish, and name the fulfiller group. The Content Library then shows a Translate content button.
After an upgrade, some tables keep their original field types, so their text is not stored as translatable. Portal, block, to-do, news and notification content each have fields to change to Translated Text or Translated HTML. Back up the data first, by copying it to another column or exporting it, before changing any field type.
Frequently asked questions
Which content formats go through a publish plan?
News articles, rich content and portal content use a publish plan from the Content Library. Mobile, notification, to-do and pulse survey content use the Schedule content form, as does anything aimed at the Workspace.
Why does an employee see “Sorry, this isn’t available”?
The publish plan is showing the item outside its availability dates, or to an audience the availability settings do not cover. Compare the plan’s dates and audience with the availability fields on the content item. For other portal access problems, see the troubleshooting guide.
Can I publish to the Workspace from the Content Library?
No. The Content Library does not offer the Workspace or UIB Workspace as a destination, so use the Schedule content form for that channel.
Should I translate before or after formatting?
Translate once the content is final. Translation runs as a localization request, and scheduling follows once that request reaches the Closed complete state.
For the wider product, start at the Employee Center hub. The Employee Center Pro overview covers plugins and upgrades. To see how a content item reaches a portal page, read how publishing places a content item on a portal. For the platform-level store, see Content Library in ServiceNow.