OBLYTECH Logo
OBLYTECH Logo

OT Asset Management in ServiceNow: Workspace and Licensing

OT Asset Management is a licensable ServiceNow application for tracking Operational Technology and Operational Equipment assets, from PLCs and field sensors to the servers and printers around them. It installs alongside Enterprise Asset Management, manages its day-to-day work from the OT Asset Workspace, charges by subscription ratio, and keeps OT assets in step with configuration items.

Where the application fits in Enterprise Asset Management

Enterprise Asset Management covers the full life cycle of connected and non-connected enterprise assets. OT Asset Management sits inside that suite as a specialised offering for Operational Technology, and it applies to assets in the Industrial and Hardware model categories, with hardware counted when its OT entity flag is true. Installing it also installs Enterprise Asset Management, so the two arrive together. For the wider CMDB, see ServiceNow CMDB.

Component Identifier What it contributes
Enterprise Asset Management com.sn_eam Life-cycle management for enterprise assets
Hardware Asset Management sn_hamp Workflow, automation and mobile capabilities for hardware and consumables
Industrial Core sn_ot_core Prerequisite tables for integrations and OT licensing

Installing the application

The application identifier is com.sn_otam. Installing it requires the admin role, and the install also brings in related ServiceNow Store applications and plugins that are not already on the instance. Check entitlements first. The Admin Home route needs valid entitlements for the application and its Store dependencies, and the Store route may prompt for extra entitlements for dependencies.

From the Store route, open All, then System Applications, then All Available Applications, and filter by name or identifier. Choose a version beside the Install button and select Install. A Review Installation Details dialog lists each dependency.

From the Admin Home route, select View product overview on the OT Asset Management card and move into the Product Hub. Under Apps and plugins, open the Not installed tab and use the installation icon on the card. The card then moves to the Installed tab, and its Open Application Manager icon shows the version, release compatibility and dependencies. Admin Home shows cards for applications the instance is entitled to, so a missing card can mean that the instance lacks the entitlement for that application.

Roles that the install provides

Two roles arrive with the plugin, and each bundles an existing EAM role. For the lifecycle stages these roles work through, see IT asset lifecycle management. The OT asset manager role (sn_otam.ot_asset_manager) manages OT-specific models and assets and contains sn_eam.asset_manager. It gives full access to the OT Asset Workspace and contains model_manager and model_admin. The OT asset technician role (sn_otam.ot_asset_technician) performs tasks on OT assets and contains sn_eam.asset_technician. Enterprise Admin (sn_eam.enterprise_admin) also has complete workspace access, because the OT asset manager role sits inside it.

Working in the OT Asset Workspace

The OT Asset Workspace is the streamlined interface for OT and OE assets. Dashboards count assets by model, lifecycle state, model category and performance, and the views split the remaining work:

View What it covers
OT asset overview Active tasks and quick links
Asset analytics Total Cost of Ownership and asset performance
Inventory Stockrooms, transfer orders, audits and disposal orders
OT asset estate Hardware, consumable and pallet asset records
OT model management Models, including firmware and discovered firmware
Procurement Requests, purchase orders, receiving slips and advance shipments
Contract and lease management Contracts, leased assets, lease-end assets and renewals
Work management Maintenance plans, work orders and calibrations

OT managers create hardware models and OT hardware assets here. The Publish button in OT model management sends a model to the enterprise catalog, and it appears when no active catalog item exists for that model. Publishing is open to the OT asset manager and the enterprise admin.

OT hardware also feeds the standard EAM flows: asset request, refresh, stock order, onboarding, return merchandise authorization, repair, disposal and bulk import. Receiving offers three paths: receive one asset, receive several assets in a shipment, or import assets in bulk and receive them. Inventory demand reports sit under the Inventory insights tab of a stockroom.

Consumables come from three places. For a hardware model, choose Create consumable asset in the Asset tracking strategy drop-down, and its OT hardware assets become consumables. For individual hardware or industrial assets, use the Consumables tab in OT asset estate and choose the type.

Stock rules and the OT entity flag

OT hardware is tagged as an OT entity automatically when it arrives by transfer order, from the local stockroom or from a purchase order. The field appears on the hardware asset form and is selected by default.

Stock rules carry an OT check box. Separating OT and non-OT hardware in those rules depends on the com.sn_otam.enable_ot_stock_rule property, which requires Hardware Asset Management to be activated. The property defaults to false for existing rules, so those rules count both kinds of hardware.

Licensing OT assets by subscription ratio

Licensing charges by subscription unit ratio, which states how many assets share one unit. A ratio of 25:1 means 25 assets require one unit. Assets are grouped into resource categories, and when the application is activated, all OT Asset Management resource categories are opted in by default. A custom model category whose parent is a licensable Industrial or Hardware category inherits that parent’s resource category.

Resource category Ratio Model categories
Unclassed OT 1:1 Industrial General
OT Supervisory System 1:1 OT Supervisory, OT Supervisory EWS, OT Supervisory Historian, OT Supervisory HMI, OT Supervisory OPC and OT Supervisory SCADA
OT Control System 3:1 OT Control and its 3D Printer, CNC, DCS, DPU, IED, Module, PLC, RTU, SCADA and Server variants
OT Field Devices 10:1 Actuator, Device, Drive, Robot and Sensor
Industrial Consumable 25:1 Consumables built from the categories above
Operational Equipment 1:1 No model category listed
OT Servers 1:1 Categories with Server in the name
OT Network Gear 5:1 IP Router, IP Switch and Network Gear
OT Storage 3:1 Storage Device
OT End User Computers 4:1 Computer
OT Mobile Devices 10:1 Mobile Device
OT Monitors 15:1 Monitor
OT Printers 10:1 Printer
OT Unclassified Hardware 1:1 Hardware

Hardware is split by the OT entity flag. For how Hardware Asset Management licenses its own categories, see Hardware Asset Management licensing and cost factors. Hardware with the flag set to true is licensed under the OT hardware categories. Hardware with the flag set to false cannot use the OT features and is not counted under OT Asset Management. When Hardware Asset Management is also active, its categories mirror the OT ones, so OT Servers pairs with Servers and OT Printers with Printers.

Reading the license report

The ITAM License Report shows the subscriptions the application consumes. The viewer needs the sn_eam.enterprise_admin role. Go to All, then ITAM Licensing, then ITAM License Report, and search for OT Asset Management.

Each row shows the resource category and subcategory, the resource total count grouped by model category, the subscription unit ratio, and the total subscription units consumed.

The EAM Populate Licensing Data job refreshes the report on Sundays.

Keeping OT assets in step with configuration items

Asset and configuration item sync normally relies on the serial number. For how OT devices are discovered into the CMDB, see OT Visibility in ServiceNow. OT assets may lack one but still carry a MAC address, so OT sync adds the mac_addr field on the asset table (alm_asset) alongside the serial number.

A configuration item can hold several MAC addresses. For the class model behind configuration items, see CMDB class explained. The Network Adapter table (cmdb_ci_network_adapter) stores each one with a reference to the item in the cmdb_ci table. Sync runs both ways. An asset created with a MAC address produces a configuration item and an adapter record. A configuration item created with a MAC address produces an asset, and the MAC is copied to it. For an existing item, the asset receives the MAC if it has none.

Changing the MAC on an existing asset leaves the old adapter record as it is and creates a new one. Check the adapter table after a MAC correction, because two records are the expected result.

Names follow the data held. A serial number gives the serial number, a hyphen and the model name, for example SN123 – DemoModel. Without a serial number but with a MAC, the MAC address and model name are used. With neither, the model name alone is the name. Name updates sync when the name was not edited by hand, the discovery source is SNassetmanagement, and CMDB has not changed the name.

MAC-based sync is controlled by the sn_itam_common.mac_address_sync system property, which defaults to false. Set it to true under Enterprise Asset Workspace, then Admin center, then Other configuration.

OT status is also synced. The configuration item table carries an OT entity reference (cmdb_ot_entity), and the asset table carries ot_entity. An item created with the OT entity reference sets ot_entity to true on its asset, and an asset with that flag creates the item and an OT entity. Once an item is marked as an OT entity, it cannot revert to a non-OT entity, so settle the classification before marking it.

What can IT and OT coordination through ServiceNow mean for a transport operator, and what must stay outside it?

For a transport operator, IT and OT coordination through ServiceNow means one intake where an operational problem is logged and tied to the affected service, the asset owner, any approved change and the vendor response. It does not mean ServiceNow controls trains, signaling, elevators or equipment. Active control, safety-critical changes and compliance sign-off stay with specialist systems and approved procedures.

What the coordination covers in practice

The useful part is the hand-off. A fault report arrives through the service desk and is linked to the affected service, the asset owner, any change already approved for that equipment, and the vendor’s response when a supplier is involved. In the proposed design the gain is that every report has a named owner, a visible age and a record of whether the agreed action happened. That is the difference between a fault being chased and a fault quietly stalling.

Where the boundary sits

A service ticket records work. It is not a control signal. Nobody should use the platform to send commands to signaling or other operational control systems, and no automated change should reach safety-critical equipment. Active discovery follows the same rule: it needs prior approval before it runs.

What must stay outside the platform

Several record types keep a different system of record, and keeping them there is the design.

  • Control and supervisory systems, which the platform does not replace and does not command.
  • Maintenance history, inspection results and work execution, which stay in the agreed system. The platform holds the request and its status.
  • Ticketing, refunds and CRM records, plus specialist aviation complaint tools.
  • Detection and physical-security systems, which stay in place while the platform can coordinate the security case.
  • Regulatory evidence. The workflow gathers and routes it, but a finished workflow does not establish compliance.

What to check before going live

  1. Name the authoritative system for each asset, work order, customer case and security record.
  2. Get operational approval for any OT-related data collection or connection.
  3. Test whether asset identifiers reconcile across systems, and decide in advance what happens when they do not.
  4. Define access for staff, contractors, tenants and external operators.
  5. Validate field connectivity and what crews need to work offline.

How to judge whether it works

Measure ownership and timing, not activity. The suggested measures are the share of reports that arrive with a named owner, response time to that owner, overdue actions, duplicate entry between systems and the rate at which asset identifiers match. Set these against the operator’s own baseline rather than a vendor benchmark. A high ticket count typically shows that people use the intake. It does not show that equipment is safer or that an obligation is met.

Frequently asked questions

Does installing OT Asset Management also install Enterprise Asset Management?

Yes. Enterprise Asset Management arrives with the application, alongside Hardware Asset Management and Industrial Core.

Which hardware counts toward OT licensing?

Hardware with the OT entity flag set to true counts under the OT categories. Hardware with the flag set to false cannot use the OT features and is not licensed under OT Asset Management. When Hardware Asset Management licensing is also active, those assets count under its categories instead.

How often does the license report update?

The EAM Populate Licensing Data job refreshes the ITAM License Report on Sundays, so changes made during the week show after that count.

Can a configuration item stop being an OT entity?

No. Once it is marked as an OT entity, it cannot revert to a non-OT entity, so confirm the classification before applying it.