To set up SMS as a ServiceNow MFA factor, use an adaptive_auth_admin account to configure Display SMS OTP as an MFA Factor Policy. Add policy inputs, define the conditions that select your users, and test authentication. The SMS MFA plugin is required, and the MFA context policy must evaluate to true. Installing the plugin requires the admin role. It also installs Adaptive Authentication, the Notify – Twilio Direct Driver plugin (com.snc.notify.twilio_direct) and the Integration – Multifactor Authentication dependency, so confirm all of them are present before the pilot.
Prepare the SMS factor change
Start by identifying who should see SMS during authentication. Write a short acceptance statement, such as: members of the selected support group should receive the SMS option when the relevant context applies. Record a comparison user who should fall outside that selection. These two cases give the administrator a clear way to assess the resulting policy.
The required plugin is Multi-factor authentication with SMS, identified as com.snc.authentication.sms_mfa. The role required for the factor configuration procedure is adaptive_auth_admin. Arrange access for that specific work before scheduling the change. Keep plugin readiness and permission readiness as separate checklist items so that a missing prerequisite does not become a policy troubleshooting exercise.
This procedure uses Brazil labels. Check the navigation and configuration on your instance and release before applying it. For the wider rollout, use the ServiceNow MFA setup and enforcement guide to plan the surrounding authentication work. Keep the SMS change focused on selecting the factor audience and verifying the resulting sign-in experience.
Understand the context and the SMS delivery destination
The MFA context policy must evaluate to true for the SMS factor policy to apply. Treat that requirement as a separate checkpoint from the selection rules inside the factor policy. A carefully written role condition cannot establish the intended result if the prerequisite context is not satisfied. Include the context in your test notes alongside the user you are testing.
SMS OTP uses the mobile number associated with the user’s sys_user record. The user receives a six-digit verification code on the mobile device and enters it to verify identity. Before a pilot, ask the test user to check that the associated mobile number is the intended destination. Avoid copying personal mobile numbers into general change records when a simple validation result will suffice.
Review three things separately: whether the expected context applied, whether SMS appeared for the selected user, and whether the code reached the intended device. A successful delivery alone does not show that the audience selection is right.
Configure ServiceNow SMS MFA factor policy inputs
- Navigate to All > Multi-factor Authentication > MFA Context.
- Open the MFA Factor Policies tab.
- Select Display SMS OTP as an MFA Factor Policy.
- Select New to add Policy Inputs.
- Choose the filter criteria appropriate to the intended audience.
The available filter criteria types are IP Filter Criteria, Role Filter Criteria, and Group Filter Criteria. Choose based on the decision you need the policy to make. For a role-based change, select Role Filter Criteria, complete the fields for that criteria record, and submit it. That creates the policy input used in the condition.
Before entering criteria, translate the acceptance statement into a selection rule that another administrator can review. For example, if the requested audience is a particular operational role, document why that role represents the intended users. If the request describes group membership instead, reconsider whether a role-based selection expresses the request accurately. Do that reasoning before combining inputs.
Keep an inventory of the inputs you introduce and the business reason for each. An input without a clear purpose makes later review harder, particularly when the intended audience changes. The ServiceNow authentication methods guide provides the broader context for discussing authentication choices with stakeholders while this change stays centered on the SMS factor.
Add conditions and review how they combine
On the Policy – Display SMS OTP as an MFA Factor Policy page, select Policy conditions. Select New to add Policy Conditions. Complete Label, Description, and Condition, then select Submit. Label identifies the condition; Description explains it; Condition contains the logical combination of policy inputs used to evaluate authentication requests.
Write the description so that it explains the intended audience without requiring someone to reconstruct the original change discussion. A label that distinguishes the purpose of this condition from another condition is easier to review than a generic sequence number. In the condition itself, use the filter criteria created for the required selection.
You can add further policy conditions. Multiple policy conditions combine through logical OR: a match on any one condition makes the policy evaluate to true. Review each additional condition as a separate route to a match. Two conditions should not be read as requiring both audiences to qualify together.
For example, imagine one condition represents the pilot role and another represents a pilot group. Evaluate a user matching the role alone, a user matching the group alone, and a user matching neither. The first two cases exercise the separate OR branches. This test design helps expose a condition that expands the audience beyond the agreed pilot.
If the required selection involves several inputs together, review the logical combination inside Condition as well as the separate condition records. Ask a second reviewer to explain which users would match before testing. When audience rules, context requirements, and rollout coordination need joint design, discuss the scope through ServiceNow implementation services with those acceptance cases ready.
Test the policy as an authentication journey
Use a controlled pilot and record expected results before starting. For the selected role-based audience, matching the configured role filter and conditions makes SMS available as an authentication option. Verify that experience with the intended user, then compare it with the user outside the selection. Keep the context prerequisite consistent with the scenario being tested.
- Record the test user’s intended relationship to the configured criteria.
- Record whether the relevant MFA context was satisfied.
- Observe whether SMS appears as an authentication option.
- Have the user check receipt on the intended mobile device.
- Record whether entering the received verification code completes identity verification.
Keep the code itself out of the test report. The evidence needed for acceptance is the outcome and the scenario, rather than a reusable transcript of sensitive information. If the observed result differs from the expectation, preserve enough detail to distinguish an audience-selection issue from a message-delivery issue before changing configuration.
For example, a missing SMS option calls for reviewing the context and factor selection against the test case. An option that appears for an unintended user calls for reviewing each condition’s possible match. A message that does not reach the expected device calls for checking the mobile destination associated with the user record as part of the investigation.
Finish with an operational handoff
Prepare a concise record of the plugin prerequisite, configuration role, selected criteria, condition purposes, and pilot outcomes. Include the intended owner of future audience changes. A future administrator should be able to explain why SMS is offered to a user without depending on the memory of the person who built the first policy.
Track entitlement and message-cost questions in the change record as open items with a named owner. Do not record them as assumptions. The cost factors for the wider access-control rollout are covered in the licensing and cost factors guide.
Questions for planning the SMS pilot
Can the default Twilio be used for SMS MFA?
Yes. The SMS factor can use the default Twilio provider configuration. That configuration is created only when Load Demo Data is turned on while the SMS plugin and the Notify – Twilio Direct Driver plugin are installed. If demo data was not loaded, create your own provider configuration before the pilot. Keep the provider decision in the implementation plan and assign responsibility for confirming the chosen arrangement before the pilot. Do not treat selecting a factor audience as proof that the delivery arrangement is ready.
What should a reviewer receive before approving the change?
Provide the intended audience in plain language, the condition logic, and a compact set of expected outcomes. Ask the reviewer to challenge any example that would grant SMS availability outside the agreed audience. This makes review a check of the decision rather than a check that fields contain values.
How should the team handle a pilot user who is unavailable?
Choose another authorized tester whose relationship to the criteria is understood, and update the test plan before continuing. Avoid quietly substituting a person with different membership or roles, because their result would answer a different question from the one recorded for the pilot.
What belongs in the support handoff after acceptance?
Include the scenario tested, the observed result, the configuration owner, and the route for reporting a mismatch. Give support a way to distinguish an unexpected factor choice from a delivery complaint.