OBLYTECH Logo
OBLYTECH Logo

Authentication Policies and Factor Context

ServiceNow authentication policies evaluate request conditions, while policy contexts determine when those checks run and how their results affect access. For MFA, configure the policy inputs and conditions, choose the MFA context behavior, and review factor policies separately. Test matching and nonmatching cases before extending the configuration to a wider group.

Separate access decisions, MFA requirements, and permitted factors

Start by writing the decision you need in one sentence. “Require MFA for this login situation” is different from “deny this authentication request” or “permit this verification method.” Treat these as separate decisions when you plan the policy.

An authentication policy evaluates its conditions. A policy context determines how and when that policy is enforced. MFA factor policies specify authentication factors that are permitted or required. A policy with the right conditions can still produce an unexpected experience if its context or default behavior does not match your intention.

Build a short decision record before changing anything: the intended users or request circumstances, the evaluation point, the expected access result, and the expected MFA result. Include the factors you intend to permit. Use the authentication methods overview when the choice of login method needs separate review.

Choose the context before building conditions

Pre-authentication policies run when someone first reaches the instance, before the login screen. They can allow or deny access before credentials are entered. Because the user has not identified themselves, this context cannot evaluate their roles or groups. Do not design a role-dependent condition for that stage.

Post-authentication policies run after credentials or an SSO response have been supplied. User information is then available for the access decision. The MFA context controls whether MFA is enforced during login. Choose the context that has both the information your condition needs and the enforcement point your requirement describes.

For an access decision, distinguish the two default approaches. Allow access policy denies authentication requests by default and permits matching requests. Deny access policy allows requests by default and rejects matching requests. Either Allow Access Policy or Deny Access Policy can execute at a given time, rather than both together.

The Default Policy options differ by context, so confirm the list on your release before you save the policy.

Build the authentication policy and inspect its logic

Configuring an authentication policy requires the adaptive_auth_admin role. Navigate to All > Adaptive Authentication > Authentication Policies > All Policies, then select New. Give the policy a Name and Description that explain its decision. Review Active and the Application value, which is filled from the current application.

  1. On Policy Inputs, select Edit and choose the filter criteria needed for the decision. Move the selected criteria from Collection into the policy inputs list.
  2. On Policy Conditions, select New. Supply a Label, Description, and Condition. The Condition combines policy inputs into the logic used to evaluate authentication requests.
  3. Add further conditions where the intended logic requires them. Multiple policy conditions are combined with logical OR: a single matching condition can make the policy evaluate to true.
  4. Select Save and review the inputs and conditions against the decision record.

For example, suppose the intended rule concerns contractors connecting from a trusted IP range. Your review should ask whether the contractor check and the network check belong together inside one condition. Splitting requirements into separate conditions can change the meaning because of the OR behavior across conditions.

Before assigning a policy to a context, use an administrator with adaptive_auth_admin and open All > Adaptive Authentication > Auth Policy Contexts. Select the intended context, choose Default Policy, and assign the policy in the corresponding field. Pre-authentication and post-authentication contexts use Deny Policy or Allow Policy, while Session Validation uses Allow Policy. Select Update and inspect the displayed inputs and conditions.

Have a reviewer read the condition as a sentence without looking at its label. Then compare that sentence with your original requirement. A descriptive name helps people find the record; it does not establish that the condition expresses the intended logic.

Connect the ServiceNow authentication policy to MFA criteria

Configuring adaptive authentication policy-based MFA criteria also requires adaptive_auth_admin. Navigate to All > Adaptive Authentication > Auth Policy Contexts > MFA Context. In Default Policy, choose how the context should respond to matching policy conditions.

Step-Up MFA Policy requires MFA when its policy conditions evaluate to true. Step-Down MFA Policy bypasses MFA when its policy conditions evaluate to true. Similar names can hide opposite intentions during a hurried review.

Assign the policy in the Step-Up MFA Policy or Step-Down MFA Policy field, according to the selected default, then select Update. After saving, Policy Input and Policy Conditions display the inputs and conditions associated with the referenced policy. Inspect those lists to check that the context references the policy you intended.

When Step-Up MFA Policy is the default, policy-based evaluation takes precedence over user-based or role-based configuration. Include those overlapping configurations in the test plan instead of assuming that a user or role setting determines the final MFA experience. MFA with SSO additionally requires glide.authenticate.mfa.with.multisso.enabled to be true.

If you are coordinating these decisions with enrollment and enforcement work, use the MFA setup and enforcement guide. Keep the context decision visible in the handover so the enrollment team knows which circumstances are supposed to trigger verification.

Review factor policies before widening the rollout

MFA factor policies address the authentication factors permitted or required for the instance. The factor-policy areas are FIDO2, SMS, and Email. Email is available by default and can be edited. SMS needs the Multi-factor authentication with SMS plugin (com.snc.authentication.sms_mfa), and an SMS factor policy applies only when the MFA context evaluates to true. Using factor policies involves policy inputs, policy conditions, and an MFA Context; choosing that MFA is required does not complete the factor-policy review.

Create a test worksheet with separate columns for the context decision and the factor expectation. For each scenario, record whether MFA should be required, which factor choices are intended, and what the tester actually sees. This separates a mistaken trigger condition from a factor choice that does not match your security requirement.

For help planning this work, see ServiceNow implementation.

Keep adjacent device questions in the adaptive authentication and trusted devices workstream. Record any dependency in the test worksheet so a change in device assumptions does not silently change what the reviewer expects.

Test access outcomes and separate session controls

Test a matching request, a nonmatching request, and a boundary case for the condition you built. For each, compare the access result and MFA result with the written expectation. Use controlled test accounts and document the starting configuration so a failed test has a clear investigation path.

If the outcome is wrong, review the chain in order: context, default policy, referenced policy, inputs, and condition logic. For MFA, also inspect overlapping user or role configuration and the SSO property where applicable. Change one element at a time so the next observation tells you something specific.

Session Validation evaluates filter criteria on incoming requests to decide whether a session should remain active. Continuous authentication also has a separate policy view: navigate to All > Continuous Authentication and select Policies. That view shows Policy Name, Description, Active, Resource Type, Classification, Tables, and Created details.

Review the Continuous Authentication and session access guide when your requirement extends into session access. Give session checks their own expected outcomes and owner rather than treating a successful login test as evidence that later access decisions are correct.

Questions about recovery and policy maintenance

Can access be blocked before authentication?

Global blocking policy can deny access requests from users and APIs before authentication. It can serve as an alternative to IP Address Access Control. Review that requirement separately from a policy intended to decide whether an identified user needs MFA.

What should be prepared for account recovery?

Account recovery supports activities such as handling SSO misconfiguration or expired certificates. At least one admin account must be registered as an account recovery user before SSO can be activated. Include recovery ownership in the change preparation.

Are there policies specifically for local login recovery?

Allow non local login users supports non-local login access in SSO recovery flows. Local login deny policy blocks local logins in those flows. Review the recovery scenario before selecting either policy; their names describe materially different access intentions.

Which demonstration policies come with the instance?

The instance includes three demonstration policies: Allow Local Login for Admins from the Trusted IP Range only, Allow Local Login for Admins only, and Restrict Username and Password based Authentication for specific users. Open them to see how a finished policy is built, then write your own conditions from the decision record.