OBLYTECH Logo
OBLYTECH Logo

Approve and Reject Actions in Approval Workflows

To approve or reject an approval in ServiceNow, open the approval record for the work assigned to you, review its details, and record your decision using that application’s controls. For audit engagements, confirm the engagement is Awaiting Approval.

Start with the record, assignment, and approval context

ServiceNow uses approve and reject controls in several applications. Start by identifying the record you are deciding: an audit engagement, a permit, a security request, or a technology request. The same decision words appear across these applications, but their permissions, navigation, and consequences differ.

For an audit engagement, the approver must be an assigned audit user, and the engagement must be in Awaiting Approval. The standard approval procedure requires sn_audit.user. The Audit Workspace procedure lists sn_audit.user and sn_audit_ws.auditor. Use the requirements for the route you are taking rather than treating access to one screen as evidence of authority in another.

Before making a decision, identify the engagement associated with the approval record and review the work you are being asked to accept. As a review habit, compare that work with the scope you expected. If the approval concerns a different engagement, stop and resolve the mismatch with the process owner before acting.

For the wider request context, the request fulfillment and service catalog guide provides the neighboring overview. Keep the immediate decision focused on the specific record in front of you.

Approve or reject an audit engagement from My Audit Approvals

The standard audit route uses buttons on the approval record. It is a short sequence, but the review before the button matters because approval does not have a single destination state.

  1. Navigate to All > Audit > My Audit Approvals.
  2. Open the approval record associated with the engagement you need to review.
  3. Check the engagement and the work being submitted for approval.
  4. Click Approve or Reject according to your decision.

Use approval when your review supports accepting the engagement at this point. Use rejection when further audit work is needed. As an operating practice, agree with the audit team what evidence reviewers should inspect before either decision. A button selection should follow that review, rather than substitute for it.

For example, a reviewer might accept the completed engagement review while follow-up work remains open. Another engagement might have no open tasks or issues remaining. Both can be approved. Inspect the outstanding work before deciding what outcome you expect to see afterward.

The audit engagement lifecycle is the related topic when you need to place the approval decision within the broader engagement process.

Record the decision in Audit Workspace

Audit Workspace uses the State list on the approval record. Here, selecting a decision and saving it are separate steps. The required roles for this procedure are sn_audit.user and sn_audit_ws.auditor, and the audit user must be assigned as an approver for an engagement in Awaiting Approval.

  1. Navigate to All > Audit > Audit Workspace.
  2. Click the tasks icon to open the engagements assigned to you, including those waiting for approval.
  3. In the My pending tasks related list, click Needs my approval.
  4. Use the link in the State column to open the approval record associated with the engagement.
  5. Select Approved or Rejected in the State list.
  6. Click Save.

Pay attention to the labels: the standard route has Approve and Reject actions, while this workspace route uses Approved and Rejected as State choices. When guiding a colleague, name the route first so the instruction matches the controls they are looking at.

As a completion check, inspect the saved decision and the engagement outcome before leaving the work. If you selected a State value but have not clicked Save, finish the documented sequence before considering the decision recorded. Avoid making another decision merely because the screen differs from a colleague’s screen.

Check the engagement outcome before calling the work complete

An approved audit engagement with remaining open tasks or issues moves automatically to Follow Up. An approved engagement without remaining open tasks or issues moves automatically to Closed. A rejected engagement moves automatically back to Fieldwork. These outcomes apply to the two audit routes described above.

When investigating a result, compare the saved decision with the remaining work before reporting a problem. As a review practice, distinguish an unexpected engagement state from an approval action that has not yet been saved. Those are different questions for the audit team to investigate.

For a hypothetical handoff, write down the engagement identifier, the decision you made, and the resulting engagement state. If the outcome differs from your expectation, inspect the remaining tasks and issues. This gives the next reviewer a concrete question to investigate instead of a vague report that approval failed.

Keep approval outcomes separate from the broader fulfillment questions covered in request fulfillment flows and requested item states. When designing your team’s review process, specify the object being approved and the evidence that demonstrates completion.

For help planning this work, see ServiceNow implementation.

Recognize approval differences in other work areas

These procedures follow Brazil release behavior; check the controls and configuration on your instance. Other applications illustrate why a single approve/reject instruction sheet needs clearly separated routes.

Permit decisions in Employee Center

Approving or rejecting a permit-to-work request requires sn_hs_rm.permit_approver. Navigate to All > Self service > Employee center, select My tasks, and find permit approvals under Open. Select the permit link and review the permit details, including the job risks and safety parameters.

Add comments in the comments field of the approve request, then select Approve or Reject. The permit requestor can view the response in Employee Center under My Tasks. For a team checklist, make the risk review a distinct step before the decision, with the comment explaining the reviewer’s reasoning.

Security request decisions

Security approvals depend on the request type. For false positive requests, navigate to All > Vulnerability Response > Vulnerabilities > My Approvals. Open a request from your queue, review it, and approve or reject it with comments appropriate to the decision. False positive requests can also be decided in Vulnerability Manager Workspace.

For vulnerable items, the false positive approval procedure requires sn_vul.false_positive_approver. Application vulnerable items use sn_vul.app_false_positive_approver. The Security Exposure Management Workspace role requirements also require false positive approvers to belong to the False Positive Approver user group. Treat the role and group checks as separate parts of preparing an approver.

Exception deferrals have a different set of listed roles: sn_sec_exception.admin, sn_sec_exception.read, and sn_sec_exception.approver. Unassign approvals list sn_vul.unassign_approver, while risk reduction approvals list sn_vul.exception_approver. Before assigning a request, match its approval type to the relevant role requirements; a false positive permission does not establish the requirements for every security decision.

Exception approval levels are configurable. An administrator with sn_vul.vulnerability_admin opens All > Vulnerability Response > Administration > Approval Rules, selects a rule, opens Approval Configurations, and selects a configuration. Its Approver Levels section contains the level settings. The Order field controls execution order, so fixed labels such as Level 1 and Level 2 do not describe every rule.

Each level has a name and a Required approval setting. That setting can require one approver or all users to approve. Assignment can use users and groups, an approval table field, or a script. Update saves configuration changes. These are administration steps, separate from an approver’s decision on an individual request.

Starting with Vulnerability Response v15.0, each level must contain at least one user. An empty second level causes automatic rejection of the approval request. Earlier behavior could defer the vulnerable item or group when that level had no user. As a configuration review practice, check both level membership and the installed application version before explaining an automatic rejection.

Technology Reference Model requests

TRM approval requires sn_apm.apm_analyst and membership in the Enterprise Architect Group. In Enterprise Architecture Workspace, open My Approvals under Needs Attention and select the request number. Review Requested Lifecycles and Existing Lifecycles before selecting Approve or Reject.

The approvals list includes product requests identified as TRMPREQ and product lifecycle requests identified as TRMLCREQ. Requested Lifecycles shows the records included in the request; Existing Lifecycles lets you compare them with lifecycles already attached to the product. Review the version, edition or hardware model, requested TRM phase, and phase dates before deciding.

A parent lifecycle request can contain multiple child lifecycle records, and its approval or rejection determines their outcome together. Update saves edits without triggering an approval decision. Approving a product request creates the product and its associated lifecycle records together. Approving a standalone lifecycle request creates its child lifecycle records and links them to the parent product. When reviewing a bulk request, check its included lifecycle records before deciding on the parent.

Questions about approval access and decision scope

Who can set an end date for a false positive?

A false positive can have a time limit, and only the approver can set its end date. As a review practice, decide whether the false positive needs a defined end date while assessing the request. Do not assume that a decision on a false positive establishes the duration of a different security approval type.

Does rejecting a TRM request create its proposed records?

No product or lifecycle records are created when a TRM request is rejected. The requester receives an email notification. Review the proposal as a decision about the records to be created, including associated lifecycle records where present.