OBLYTECH Logo
OBLYTECH Logo

Security Advisory Framework Setup

Common Security Advisory Framework (CSAF) setup in Vulnerability Response links CSAF advisory data to vulnerability solutions. For a vendor other than Red Hat, prepare sign-in, copy the advisory flow, adapt pagination and field mappings, then set up the API import. Validate the resulting solutions and queue processing before you call the integration ready for daily use.

Prepare the Common Security Advisory Framework (CSAF) integration

Start by deciding what the vendor supplies. It may be an advisory API, a direct CSAF payload, a ROLIE feed, or a JSON file. That decision determines the import route. An API response with advisory summaries needs extraction logic before the integration can fetch the CSAF documents behind them.

Verify that Vulnerability Solution Management and Vulnerability Response are installed. The integration needs Vulnerability Response version 16.1 or later. For the current Vulnerability Solution Management version, also confirm that the installed Vulnerability Response release is current. These steps reflect Brazil behavior. Check the configuration against your instance and release before applying changes.

For a production installation, confirm the application entitlement under Subscription Management > Subscriptions. Development and nonproduction application downloads do not require this entitlement step. Installation needs admin access. The vulnerability administrator handles configuration and verifies results. Update NVD records for the last ten years and bring third-party vulnerability records up to date. These are prep checks for solution management, along with installing and activating the needed apps.

For vendor setup, connection aliases, and API, URL, or file imports, the needed role is sn_vul.vulnerability_admin, sn_vul.admin (deprecated), or admin. Give the person doing those actions the right access before you start. Have vendor credentials on hand when the integration you chose needs sign-in.

Write down the vendor, import route, sample advisory identifier, and expected CSAF document before you configure anything. This gives the reviewer a real test case. If the wider workflow is still being designed, place this work within your Security Operations implementation plan.

Build the vendor connection and copy the advisory flow

For API access, go to All > Vulnerability Response > Connection & Credential > Connection & Credential Aliases. Create a record with the authentication type the vendor supports. Treat sign-in and payload parsing as two checks. A working credential does not show that the response fields are mapped right.

For OAuth authentication, create the OAuth authentication configuration and a Connection and Credential alias. Select the new alias, open the Connections tab, and select New. Set OAuth Entity Profile to the Application Registry Profile made for that authentication. In the connection record, choose the credential in Credential, enter the vendor address in Connection URL, and select Submit.

Next, go to All > Vulnerability Response > Flow Designer and duplicate Advisory Parsing. Where an action needs changes, copy that action and use the copy in the new flow. Name the vendor in your setup notes. A future maintainer can then tell its copied flow and actions from the shipped setup.

Review page_index_key and page_size_key against the vendor API. Update the pagination logic to match how that API moves between pages. If its date range behavior differs from Red Hat, copy Update Pagination Parameters and adapt it. Depending on the response shape, copy Retrieve List and change how it pulls out the advisory list.

Review a sample response before you edit. Identify the list container, the next-page method, and the date filter names. Then compare those notes with the copied flow. This review helps you tell a response with no matching advisories from one the parser cannot read.

Map the advisory fields before scheduling retrieval

Go to All > Vulnerability Response > Enrichment Data Mappings. Create the vendor record using the Red Hat configuration as a start, and change Property key to match the vendor. The shipped mapping is specific to Red Hat. Each advisory vendor needs its own records.

The advisory payload mapping targets columns in sn_vul_cvrf_solution_integration_update. Check the following links against a typical response:

  • Map the resource that points to the CSAF payload to cvrf_url.
  • Map the unique identifier of the advisory to Id.
  • Map its last modification value to last_modified_date.
  • Use the static value csaf for advisory_format.
  • Map securityAdvisoryIntegrationSysId to integration, which names the scheduled integration job that creates vulnerability solutions.

Review the identifier and document location as a pair. An advisory identifier shows which record is being handled. The CSAF location supplies the document to fetch. A useful mapping review follows one response through both fields before it looks at the other values.

For help with this work, see ServiceNow implementation.

Configure API retrieval or select a simpler import route

Import from an advisory API

Go to Vulnerability Response > Administration > Setup Assistant > Integration Configuration > Solution Integrations > Common Security Advisory Framework. Select Add Integration and set Import type to API. Enter a unique Name and the Vendor. The vendor name fills in Source on the solution records.

Select Connection alias and set Schedule, Day, and Time. Under API Configuration, select the copied Flow, the right Flow action, and Mapping Table. Enter the response tag that holds the advisory list in Advisories from response. The scheduler triggers the chosen flow, which pulls CSAF locations into update tables.

Under Filter Criteria, set Time range parameters and Date format to match the API. Unsupported GlideDate formats do not work. Initial range in days controls the first fetch. Later runs use the sliding window method. Choose No Parameters when you do not want a time range. Select Finish after you review the setup.

During a run, the integration fetches advisories and pulls out their identifiers and CSAF locations. It then requests and parses each document. The data is stored in sn_vul_solution.

Import a document, feed, or file

For a direct payload or ROLIE feed, use Add Integration with Import type set to URL. Set Name, select Single vendor and Vendor or Multi Vendor and Aggregator, then supply URL and scheduling fields. Select Finish. A CSAF status tag of FINAL automatically changes Schedule to On Demand. URL imports can also get solutions from aggregators or trusted providers using a ROLIE feed. Those solutions are mapped to the right vendor and vulnerable items using CVEs. So the Single vendor and Multi Vendor choices describe the source you import. They are not two ways to set up the advisory API parser.

For a one-time file import, select Import File in the CSAF setup area. Upload one JSON file at a time, with a maximum size of 15 MB. Enter Name and Vendor, then select Finish. The queue entry that results carries an attachment for parsing. Use the information-bar link to inspect the vendor queue entries and job status. Before parsing, the import creates a scanner-mapping record from the setup and turns scanner-mapping data into vendor-mapping data. Queue processing then parses the attachment through a dedicated data source. The file route does not need repeated scheduled advisory API requests.

Validate solutions and investigate the failing stage

Check more than whether the integration ran. Review solution records for the vendor and advisory content you expect. Then inspect whether solutions reach the vulnerabilities you intend. Check that CVEs and solutions agree in the Vulnerability Solution table sn_vul_m2m_vulnerability_solution. Plan that review alongside your Vulnerability Response workflow, with a named owner for settling mapping questions.

File parsing fills sn_vul_solution, sn_vul_m2m_vulnerability_solution, sn_vul_nvd_entry, sn_vul_software, and sn_vul_product_category. As a review approach, tell the solution record apart from its vulnerability link. Finding the advisory content in a solution is one check. Finding its link to the expected vulnerability is another. Do not replace either check with the job status alone.

Scanner mapping does not apply to NVD-based vulnerabilities. With one highest superseding solution that rolls down to vulnerable items, the preferred solution is filled in. For third-party vulnerabilities, filling in the preferred solution needs the matching scanner mapping. Where several vendor solutions leave more than one highest superseding solution in an NVD entry, the preferred solution is not filled in and needs manual selection.

For a long-running integration, open sn_vul_ds_import_q_entry and group by Status. The states that matter are Completed, In progress, and In queued. Use the state grouping to tell finished entries from work that is still queued or in process.

For an API failure, open the flow in Flow Designer, select Executions, open the run, and inspect its stages. For an advisory parsing timeout, the timeout setting is sn_vul.CVRFFlowTimeout (inMiliSeconds) in sys_properties.LIST. Its value uses milliseconds. Review the run before you decide on an increase. For a confirmed advisory parsing timeout, raise the property value, save it, and rerun the integration. This fixes a timeout. It does not replace fixing the response extraction or field mapping when a run fails at those stages.

A scanner-mapping to vendor-mapping transformation can delay an API or URL import. Wait for it to finish before you run again. During file import, the same transformation can postpone queue creation. File parsing also updates Application logs, where you can inspect errors and exceptions. Use the broader Security Operations troubleshooting record to organize your search across the affected stages.

Before handover, reconcile one imported example from the advisory response, through the chosen mapping, to the resulting solution. Settle differences before you accept the example. A successful run does not show what was accepted, so file the sequence and the test evidence with the configuration.