OBLYTECH Logo
OBLYTECH Logo

Field-Level Encryption Setup

To set up field level encryption in ServiceNow, identify the sensitive columns, define the cryptographic modules and their access policies, then create encrypted field configurations. Use Row Conditions when records need different modules. Test who can decrypt each value, and treat existing data, attachments, and key changes as separate implementation decisions.

Choose the field level encryption scope in ServiceNow

Start with a field inventory that names the table, column, data owner, intended readers, and processes that use the value. A record can be visible to a user while an encrypted field remains unreadable to that user. Write separate acceptance criteria for opening the record and reading its protected content.

For example, a claims workflow can contain sensitive information in the deceased person’s name, incident narrative, and supporting files. Selecting a narrative field does not settle how supporting documents should be protected. Inspect the actual data model rather than assuming that one configuration covers the entire business transaction.

Decide whether the implementation uses Field Encryption with cryptographic modules or Edge Encryption through a proxy. From Zurich onward, Edge Encryption and Edge Encryption Core are on a path toward future deprecation: both are hidden and cannot be activated on new instances, although support continues. Field Encryption and Field Encryption Enterprise are the latest options. Record why an existing Edge deployment should remain in the design. Use the column level encryption guide to frame the column protection decision before selecting the configuration route.

The steps here reflect Brazil behavior; check the controls and supported features on your instance and release. Build and test the change in a non-production instance. For Edge Encryption configuration, connect through the proxy. Review scripts that use the selected field and settle any required field size changes before enabling encryption: the field size cannot be changed afterward.

Edge Encryption also changes application behavior. Global search is unsupported, encrypted values cannot be used in reports, and Data Archiving is incompatible with Edge Encryption. Back-end rules and scripts cannot evaluate encrypted content normally; equality-preserving and order-preserving ciphertext can still pass equivalence checks against identical ciphertext. Proxies cannot encrypt batch REST requests. Set glide.uxf.disable_rest_batching to true to disable REST batching when using these proxies.

Map keys to the people who need the data

For Field Encryption, organize the design around cryptographic modules and Module Access Policies. When creating a multiple-module configuration, the required role is sn_kmf.cryptographic_manager or sn_kmf.admin. Create the modules and an access policy for each, granting different roles to the modules where the data must have different audiences.

Write a small access matrix before configuring anything. Give each module a business purpose, its permitted role, a test writer, and a test reader. Include a user who can open the table’s records but should not decrypt the protected field.

For Edge Encryption, establish the proxies and default encryption key before creating encryption configurations. The instance checks key availability across the proxies, and a key cannot become the default unless all proxies have it. Include each proxy in the readiness check so that the default-key decision accounts for the whole deployment.

Keep key ownership and application behavior in the same change record. Record who approves changes to the permitted audience, who verifies key availability, and which workflows must be retested. For the related script and access considerations, see field encryption keys and script access.

Configure Row Conditions for different record audiences

Row Conditions associate encryption modules with record criteria and are preferred for new multiple-module use cases. The required roles are security_admin and either sn_kmf.cryptographic_manager or sn_kmf.admin. Prepare the modules and their access policies first, with the intended roles assigned to each policy.

  1. Open System Security > Field Encryption > Encrypted Field Experience > Create new module.
  2. Select the Table and Column that identify the field.
  3. Decide whether Encrypt by default should protect records outside the defined conditions. When selected, choose the default Crypto Module.
  4. Select Submit, then open the new Encrypted Field Configuration from the Configurations tab.
  5. Select Add Row Conditions and Add Condition, complete the required criteria, and select Submit.

Do not leave the fallback decision implicit. Without Encrypt by default, newly added records that match no row condition are not encrypted. A default module also requires a Row Condition defining that module. Test a matching record for each condition and a record that falls outside the criteria.

Conditions operate on the main record; the condition builder does not support dot-walking. Row Conditions are not supported on Options, Question Answer, or Multi Row Question Answer service catalog tables. Confirm that your chosen table and criteria fit these boundaries before committing the design.

For help planning this work, see ServiceNow implementation.

Recognize the legacy Multiple Modules behavior

An existing implementation may use the Multiple Modules method rather than Row Conditions. In this method, the first user entering data determines the module used for that field on the record. A list can therefore contain values protected by different modules, while one field within one record uses one module.

To configure this method with sn_kmf.cryptographic_manager or sn_kmf.admin, open System Security > Field Encryption > Encrypted Field Configurations > New. Set Type to Column, select Multiple Modules in Method, choose the Table and Column, and select Submit. This method supports columns rather than attachments.

Do not plan a routine switch from multiple modules to a single module: that change is unsupported. For these legacy methods, mass encryption requires a single-module configuration; Multiple Modules does not support it. Mass decryption is available with either method. With security_admin, use the available mass-job Related Links on the Encrypted Field Configuration during non-peak hours. Decryption covers values protected by modules you can access. When assessing an inherited setup, capture which method it uses before estimating how existing records will be handled.

Create a field configuration for the Edge Encryption route

Creating an Edge Encryption field configuration requires security_admin. Navigate to All > Edge Encryption Configuration > Encryption Configurations > Create New. Select the Table, set Type to Column, choose the Column, select the Encryption type, and click Submit. A table and field combination can have one active configuration.

Supported field types include String, Date, Date/Time, Journal, Journal Input, and URL. String and URL configurations can be added at a parent or child table. Date and Date/Time configurations must be added at the parent table. Schedule creation of those date configurations during low transaction volume because the change can take time.

Separate configuration from historical coverage. For this route, existing values can be encrypted when they change, or processed through an encryption job. With security_admin, open the field configuration and select Schedule Mass Encryption Job under Related Links. Set Job Type to Encryption, verify Table and Column, and set Run and Starting.

Save from the form header menu, use Estimate Record Count, and use Execute Now if the job should run immediately. If the field is audited, assess Process Historical Records so the plan includes old and new values in the Audit table. Keep the estimate and actual job results in the change evidence.

Validate field access and attachment protection

Test with separate accounts for each permitted audience. Have each account create a record, then inspect its own value and a value protected for the other audience. Include existing records and records outside the row criteria. Compare results with the access matrix instead of using an administrator session as the acceptance test.

Check scripts as well as forms. Field Encryption allows getValue() to return plaintext when the user has cryptographic module access; without that access it returns ciphertext. Review logging and downstream handling wherever scripts consume the value. A successful form test does not establish that a script runs with the intended access.

Attachments need their own decision. Field Encryption also supports attachment protection through Row Conditions. Configure each attachment-bearing table separately: an Encrypted Field Configuration does not extend attachment protection to child tables. Incident, case, and problem attachments each need their own configuration. For Edge Encryption attachment configuration, security_admin selects the table, sets Type to Attachment, and chooses Standard AES128 or Standard AES256. Encrypted attachments are excluded from text search. Include file names in the review because users bypassing the proxy can still see attachment names on records with attachment encryption activated.

For Edge Encryption, security_admin must schedule an attachment encryption job to protect existing attachments without waiting for new uploads. Use the attachment encryption administration guide when planning that work. Sign off field and file coverage separately, with a named owner for any remaining historical data.

Questions about changing an encryption setup

Does clearing Active remove an Edge Encryption configuration?

No. With security_admin, you can clear Active to deactivate it. Deactivation retains the configuration record, and the encryption type cannot be changed through that action. Treat deactivation as a controlled configuration change with its own review.

How do you deliberately return an Edge-encrypted field to clear storage?

With security_admin, deactivate the field configuration before running its decryption job. Open the field configuration and use Schedule Mass Decryption Job, with Job Type set to Decryption. Plan the resulting clear-data exposure before execution.

Can catalog variables have an Edge Encryption configuration?

Yes. With security_admin, open All > Edge Encryption Configuration > Variable Encryption Configuration, click New, choose the Variable and Encryption type, then click Submit. Assess existing variable values separately from newly written values.

What happens if clear attachments are explicitly allowed?

Setting edge_encryption_clear_attachment_allowed to True in the table’s Collection Dictionary entry permits unencrypted attachments on a table using Edge Encryption. Have security_admin schedule an Attachment Encryption job to process those clear uploads, and review why the exception is needed.