OBLYTECH Logo
OBLYTECH Logo

Publishing Knowledge Articles Through Approval

Knowledge article approval in ServiceNow follows the publishing workflow selected for the article’s knowledge base. With Knowledge – Approval Publish, selecting Publish starts the approval path; publication follows completed approval, subject to any scheduled date. Check the article’s ownership group, workflow state, and publication timing before treating the request as finished.

Identify the approval route before submitting

Start with the article’s Knowledge Base and the publishing workflow configured for that base. Knowledge – Instant Publish makes an article available immediately unless a later publication date applies. Knowledge – Approval Publish requires approval completion before publication. The same Publish action can therefore produce different outcomes for articles stored in different bases.

For a review handoff, record the article number, its knowledge base, its intended readers, and whether publication should happen as soon as approval finishes. This gives the author and reviewer a shared reference. A statement such as “I clicked Publish” does not establish that readers can access the article.

Check these instructions against your instance and release, particularly where workflows have been customized. Keep the configured approval route distinct from your team’s editorial checklist: checking spelling and testing a resolution are review practices, while the workflow controls the publication transition. The Knowledge Management overview explains the wider relationship between articles and knowledge bases.

Prepare the article and its approval ownership

For standard article creation, the listed roles are knowledge, knowledge_manager, knowledge_admin, knowledge_coach, knowledge_domain_expert, knowledge_group_member, or admin, together with contribute access to the knowledge base that will store the article. Do not treat article creation access as proof that a person is the assigned approver.

Choose the knowledge base before choosing the template. The available templates depend on that selection. Complete the Short description and Article body, select the relevant Category, and inspect the Ownership Group. An ownership group has members and a manager responsible for article quality, approvals, and feedback tasks. It can publish, edit, and retire associated articles.

If an article has no ownership group, the approval route goes to the knowledge administrator and knowledge manager when approval is required. Check this before asking a colleague to look for a request: the person you expected to review the article may not be on its actual route.

Before submission, test the instructions from the reader’s starting point. Identify required access, name the expected result, and remove details that belong to a different audience. This is a recommended editorial check rather than an additional platform setting. Use the knowledge article template guide when the review problem is inconsistent article structure.

Submit for publication from Agent Workspace

Publishing an article in Agent Workspace requires agent_workspace_user and contribute access to the knowledge base storing that article. Navigate to All > Agent Workspace > Agent Workspace Home, then Lists > Knowledge > My Articles – Unpublished. Open the article and select Publish on the Knowledge form.

  1. Confirm that you opened the intended article, using its number and title rather than the title alone.
  2. Review its knowledge base, ownership assignment, and intended publication date.
  3. Select Publish to invoke the knowledge base’s publishing workflow.
  4. Inspect the resulting workflow state and follow the approval request through its assigned route.
  5. After completion, verify publication from the published article lists.

The Workflow field represents publication state. Standard article forms include values such as Draft, Review, Scheduled for publish, and Published. Do not infer success from the disappearance of an editing task or from a saved record. Saving preserves work; publication depends on the publishing workflow.

Agent Workspace also supports managing articles you authored, addressing assigned feedback tasks, and comparing versions. Knowledge administration tasks, including creating a knowledge base and managing article access, belong in the ServiceNow AI Platform interface. See knowledge authoring in Agent Workspace for the author’s broader working sequence.

Complete the review with the right decision maker

Ownership group members can approve articles they authored when an ownership group is associated with the article. An administrator can disable that behavior by setting the self-approval system property to false. Confirm its exact name in the system properties list on your instance before changing it, because two similar names are in use. If your editorial policy requires a separate reviewer, compare that policy with the property and the actual approval route before relying on separation of duties.

For Operational Technology (OT) knowledge bases, the approval-request procedure requires knowledge_manager. The assigned knowledge base manager opens the approval notification email, follows its request link, and approves or rejects the request. A rejection can include a comment explaining the reason, and the request creator receives an email notification of the outcome.

Make rejection comments actionable. For example, ask the author to identify the affected application or replace an untested recovery step with a tested sequence. That is a suggested review practice. It helps the author distinguish a content correction from a concern about audience, ownership, or publication timing.

When planning approval governance, settle who owns the article, whether self-approval is acceptable, and who handles requests when no ownership group is assigned. For help planning this work, see ServiceNow implementation.

Coordinate approval with a scheduled publication

Scheduling an article for publication requires the knowledge role and contribute access to its knowledge base. The Knowledge Management Advanced plugin and article versioning must be enabled. In the platform interface, go to All > Knowledge > Articles, select Unpublished, and open the article.

Set Scheduled publish date using the date and time control, then select Publish to start the publishing workflow. In the platform interface, the scheduled publish date must be at least 24 hours ahead. The Publish article option publishes before that window. Choosing a future date does not remove approval requirements.

  • With Knowledge – Approval Publish, the scheduling flow sets Workflow to Review while approvals are pending.
  • If approval finishes before the scheduled date, Workflow changes to Scheduled for publish and publication waits for that date.
  • If approval finishes after the scheduled date, publication happens when approval completes.

Plan the reviewer’s deadline before the reader’s deadline. For example, if a support instruction must accompany a planned change, leave time for the author to correct a rejected draft. A scheduled date is a publication target, not evidence that the reviewer has accepted the content.

Keep the exact label visible in context: the standard article creation form describes Schedule publish date, while the scheduling procedure uses Scheduled publish date. Inspect the field on the form you are using rather than assuming a similarly named field has completed the workflow.

Verify the outcome before closing the handoff

After publication in Agent Workspace, check My Articles – Published and All Articles. In the platform interface, published articles appear under Knowledge > Articles > Published and Knowledge > Articles > All. Where article versioning is enabled, publication also updates the article version.

If someone reports that an approved article is missing, separate publication from visibility. Inspect Workflow first, then its scheduled date, then Valid to. Articles do not appear in search after their Valid to date, or when that field is empty. Approval completion does not by itself make the article findable.

Include attachment review in the content check when the article depends on a file. Display attachments controls whether attachments appear below the article text. Make sure the reviewer examines the file as well as the body, so that approval covers the instructions readers will actually use.

For the handoff record, capture the article number, publication state, approval outcome, and the date readers were meant to receive it. Check the article as an intended reader as part of your acceptance process. The Knowledge Management troubleshooting guide covers adjacent problems when the publishing state and the reader’s experience diverge.

Questions about approval edge cases

Can a feedback task lead to a separate article?

Yes. In Agent Workspace, an assigned feedback task can be the starting point for another article when the existing one does not address the issue. This action requires agent_workspace_user and contribute access to the destination knowledge base. The new article still follows that base’s publication workflow.

Can an author preview the article before requesting publication?

On the platform Knowledge form, View Article in Related Links provides an article preview. Using this preview does not increase the article’s actual document-site view count. Use it to inspect presentation before the reviewer receives the request.

What should an author do with a guest-visibility warning?

Publishing can display a warning that the article may be visible to unauthenticated users. Pause to verify that the intended audience permits this exposure before proceeding. Editorial approval and the decision to allow guest access address different concerns.

Can a scheduled article be returned to Draft?

Recall cancels scheduled publication and returns the article to Draft. Coordinate that action with the reviewer and the planned release so that a withdrawn article is not mistaken for content still waiting to go live.