OBLYTECH Logo
OBLYTECH Logo

Software Subscription Management Setup

Software subscription management in ServiceNow connects purchased software rights with assigned subscriptions, usage evidence, and renewal decisions. Set up the entitlement and software model first, validate the imported subscription records, then associate the commercial agreement with a renewal process. Check the records each step creates before approving a purchase or reclaiming access.

Define the records your subscription setup will manage

Start with one publisher and one agreement. Identify the purchased plan, the people assigned to it, the usage evidence available, and the person responsible for the next renewal. Treat this as a pilot that procurement and the application owner can inspect together before expanding the scope.

An entitlement represents software rights. A software subscription record describes an assignment discovered through a SaaS integration. Usage records supply activity evidence, while a contract supports the commercial renewal process. Keeping these purposes clear prevents an imported assignment from being mistaken for proof of a purchase.

For SaaS integrations, ServiceNow automatically creates the software model associated with a subscription. The subscription’s Subscription identifier supplies the provider’s technical product or plan identifier for mapping. Review that mapping alongside the purchased entitlement rather than deciding that similar display names mean identical rights.

Azure subscriptions introduce another record type: the management-group discovery pattern populates Cloud Service Account records in the CMDB and references the management account. Include those records in a cloud inventory design, but use software entitlements and user assignments for this SAM setup. The guide to Software Asset Management Professional explains the broader operating context.

Import purchased rights before judging subscription coverage

For Microsoft 365 entitlement imports, the required role is sam_admin or sam_user. Gather the entitlement information before downloading the template, so the person completing it can trace the imported rights back to the agreement. Keep disputed quantities out of the pilot until procurement resolves them.

  1. In the Core UI, open All > Software Asset > Licensing > Import Entitlements and select Download Template File (.xlsx).
  2. In Software Asset Workspace, open License operations, select Create entitlement, then choose Import multiple entitlements from an Excel file and select Next. Use Download template on the import page.
  3. Review the template’s Directions tab. For Microsoft 365, set Metric group to Microsoft and License metric to User Subscription.
  4. Import the completed template, resolve import errors, and review the resulting software entitlement records.

Open each pilot entitlement and inspect its Software model. Check the discovery map and suite components against the template. An import that finishes successfully can still leave a mapping that needs correction. Resolve that before using reconciliation results to support a renewal quantity.

Agree how suites and standalone products should be represented before importing a larger batch. The license metrics and suites guide helps frame that decision. Keep the import review focused on rights and product mapping, with assignment checks handled in the next stage.

Validate subscription assignments and usage separately

Inspect a representative software subscription record. Compare Display name, Publisher, Product, Edition, and Subscription identifier with the source assignment. Check User and Discovered user as well: the former references a ServiceNow user, while the latter represents an identity found in an external system.

Use Subscription profile to understand which integration profile supplied the assignment. After reconciliation, review Is reconciled and the linked result fields. Unlicensed subscription indicates a subscription left unlicensed because available licenses were insufficient. Investigate the rights, mapping, and assignment evidence before treating that flag as a purchase instruction.

Microsoft 365 activity can be examined in Software Usages and Microsoft 365 Apps Usage Reports. The former holds product usage information from Microsoft APIs and other discovery solutions; the latter holds Microsoft API activity information for individual applications. The SAM – Collect Microsoft 365 Usage scheduled job collects usage daily.

Record the source and collection time during acceptance. A missing activity value deserves investigation before an inactivity decision. On the subscription form, Inactive days is visible when Last activity is populated and is calculated from that value. Check these Brazil behaviors against your instance, release, installed applications, and integration coverage.

Make renewal ownership and dates explicit

Give procurement a review package that brings together the agreement, imported rights, current assignments, usage coverage, and unresolved exceptions. Recommend a decision owner and a decision deadline earlier than the commercial notice date. These are operating controls to agree with the business; they are not automatically created by importing subscriptions.

The Renewals calendar requires the Software Asset Workspace (sn_sam_workspace) application. Users with sam_user or sam_admin can open Software Asset Workspace > Renewals calendar. It shows eligible contracts and entitlements, including entitlements without associated contracts. To continue into the contract renewal workflow from an entitlement, create or associate a contract.

Check eligibility when an expected contract is absent. The calendar conditions include a populated end date, the supported contract model, expiration timing, and renewal substate. Review Awaiting review and Renewal rejected where applicable. A calendar bar’s renewal start is calculated from the end date and Days past/until renewal; open the record to inspect its actual start date.

For help planning this work, see ServiceNow implementation.

Follow the contract renewal records through completion

The contract renewal workflow requires Software Asset Management Professional (com.snc.samp) and the sn_contract_enable_renewal_flow system property to be enabled for this software scenario. Include that property in the configuration review rather than assuming an existing installation has the workflow enabled.

For creating a renewal request in the Core UI, the listed roles are contract_system_admin, asset, or contract_manager. Open All > Contracts > Contract Renewal, select an eligible contract, choose Renew, then OK. Confirm the request references the intended agreement before moving it through review.

The request has a generated number, a Stage, a contract reference, and a creation date and time. A contract renewal request line is created for each contract being renewed. The source contract’s substate becomes Renewal in process. Use those records to establish that renewal work has started, rather than relying on a calendar entry.

The workflow creates, validates, approves, and activates a contract record referencing the original. Its software assets selection step lets the team include or remove software entitlements. Review carried-over rights, terms, and renewal details before closing tasks, because a closed renewal task cannot be edited. Do not assume completing a renewal changes a user’s SaaS assignment.

Test reclamation before reducing the renewal quantity

In SAM classic, reclaiming user subscriptions requires sam_user. Navigate to All > Software Asset > Removal Candidates > Reclamation Candidates. For the pilot, inspect an individual removal candidate and use Reclaim after the application owner has agreed that access can be removed.

Successful reclamation deletes the subscription record from Software Subscriptions [samp_sw_subscription] and sets the candidate to Closed Complete. Failure sets it to Attention Required and displays error details. Capture the outcome before counting the assignment as removed. Low activity alone does not establish that a person can lose access.

Acceptance should follow one purchased right through mapping, an assignment through usage review, and a contract through renewal request creation. Include a failed reclamation case with an assigned follow-up owner. Use the SAM testing and acceptance checklist to organize sign-off before expanding the setup.

Before the renewal decision, reconcile the review package with the outcome of that pilot. Separate assignments still under investigation from approved removals and completed removals. Give procurement the remaining uncertainties alongside the proposed quantity, so a pending technical task does not silently become an assumed reduction in purchased rights.

For ongoing operation, agree who checks failed imports, identity mismatches, missing activity, and stalled renewal tasks. Set a review cadence around the agreement’s decision dates. Preserve the reason for retaining an inactive assignment, such as an approved business exception, so the next reviewer can distinguish a deliberate choice from unfinished work.

Questions about subscription setup exceptions

Can a perpetual entitlement appear in the renewal calendar?

Yes. The calendar supports Perpetual and Subscription license types. For a perpetual entitlement, the displayed end date represents maintenance expiration. Keep that distinction visible when procurement reviews what is being renewed.

Can desktop inactivity alone justify a Microsoft 365 downgrade?

Some downgrade recommendations consider more than desktop activity. For Microsoft 365 E3 to F3, mailbox and OneDrive sizes are also checked. Review the target plan’s requirements before accepting a recommendation.

What happens with SurveyMonkey reclamation?

The integration does not support platform reclamation. Reassign or delete the user in the SurveyMonkey team, then set the corresponding removal candidate to Closed Skipped so its software subscription record is removed.

Which assignment date supports Microsoft 365 candidate generation?

The subscription assignment date populated from the Microsoft 365 portal supports candidate generation based on the actual assignment. Compare it with the portal when investigating unexpected candidates; the ServiceNow record creation date can represent a different event.

What should a buyer check on expiry dates and invoicing when several subscription agreements are combined into one renewal?

Check that every agreement in the combined renewal has a known end date and renewal-order deadline, and that the new term starts with no gap or overlap. Then request the invoice schedule line by line, with the billing period for each one and how prepaid time from the old agreements is treated.

Map each expiry date and the deadline before it

List every agreement going into the renewal with its end date, the last day a renewal order can be placed. In draft 2025 San Francisco amendment materials, the renewal order was required to be placed before the expiring term ended.

Confirm which version of the ServiceNow ordering agreement the combined order references. ServiceNow’s legal index identifies an ordering agreement effective February 6, 2026 and directs readers to archived versions for earlier purchases, so an older order may carry older terms.

The historical ServiceNow Ordering Agreement dated November 2022 ends access rights when the subscription term expires, so a gap can cut users off even after signing.

Line up the new term with the old end dates

Co-terming puts every covered product on one end date. The transition can fail two ways. An overlap can bill the same rights twice, and a gap stops one product’s rights before the new term begins.

The California State Lottery’s March 2024 issue memo shows the pattern. It proposed combining three ServiceNow agreements, ending May 30, August 31 and December 15, 2024, into one two-year agreement at the May 30 renewal. Added modules and implementation services are easier to judge when priced apart from the renewed scope.

Confirm how the invoices are scheduled

In the historical November 2022 ordering agreement, subscription fees are invoiced annually in advance unless the order documentation says otherwise. A combined renewal can mix billing timing, so request a schedule for each product line.

An annual invoice says nothing about how long the commitment runs. In ServiceNow’s fiscal 2025 Form 10-K, subscription arrangements typically run three years with annual billing, but a combined renewal can break that pattern, so check the term and total on each line.

Fix the quantities before accepting the combined price

In draft 2025 San Francisco amendment materials, each renewed quantity was required to equal or exceed the cumulative quantity bought during the expiring term, so midterm additions can raise the required quantity. Reconcile each product to its contractual metric, such as active profiles or fulfillers, not login counts.

Questions to put to the vendor in writing

  1. Which order forms and amendments does the renewal replace, and which continue?
  2. What start and end date applies to each product line, and when must the order be placed?
  3. Is there any period when access under an old agreement ends before the new term starts?
  4. What is the invoice schedule for each line, including billing period and timing?
  5. How is unused prepaid time on the old agreements credited, carried over or lost?