OBLYTECH Logo
OBLYTECH Logo

Setting Up Standard Change Catalog Templates

To set up a standard change template in ServiceNow, configure the Standard Change Catalog, create a proposal containing the repeatable change values, add tasks and attachments, and request approval. Approval publishes the template to the catalog. Requesters then use that approved template to create standard change requests without a separate change approval.

Define the work a standard change template should cover

Start with a repeatable activity whose execution steps and boundaries can be reviewed together. A template should make the approved work recognizable before someone selects it. A vague description such as server maintenance leaves too much room for different activities to share the same approval.

As a design exercise, write down the eligible equipment, the work to perform, the validation evidence, and the conditions that should make the requester stop. Keep variable details separate from the fixed procedure. For example, a target configuration item may vary while the approved implementation instructions stay consistent.

Use sample change requests to show reviewers how the proposed activity has been performed. Select examples that reflect the scope you intend to publish. If the samples describe materially different work, narrow the proposal before asking for approval. Compare the available ServiceNow change management types when deciding whether an activity belongs in this catalog.

Enable the catalog and set its field controls

An admin activates Change Management – Standard Change Catalog, whose plugin ID is com.snc.change_management.standard_change_catalog. Navigate to All > System Applications > All Available Applications > All, locate the plugin, and select Install. Activation also enables Change Management – Core if needed. With domain separation and delegated administration enabled, the administrative user must be in the global domain.

Once active, the plugin exposes All > Change > Administration > Standard Change Properties. Configuring these properties requires admin. Review the configuration on your instance and release before changing it, particularly where existing templates already depend on shared properties.

  • Catalog and Category: identify where generated templates belong. Category must also be specified on the proposal before approval; the property does not automatically populate that proposal value.
  • Mandatory Change Request values: identify fields that proposals and proposed modifications must supply.
  • Default Change Request values: provide common starting values for change request fields.
  • Restricted Change Request values: prevent users from supplying specified fields in a proposal. Include internal record columns in this review.
  • Read-only fields: protect approved values against requester changes in the generated standard change request.
  • Fields to copy: control which existing change values transfer when proposing a template from a non-standard change.

Select Update after reviewing the settings. Treat mandatory, restricted, and read-only controls as separate decisions: requiring a value does not by itself protect that value from later editing. Check the corresponding Change Task properties when task templates will form part of the proposal.

Create the proposal with explicit approved values

For the catalog proposal procedure, the required role is itil or admin. The role mapping assigns submission of new proposals to itil, review and approval to change_manager, and template creation and editing to sn_change_write; admin can perform all proposal actions.

Navigate to Change > Standard Change > Standard Change Catalog > Template Management > Propose a new Standard Change Template. Fill the proposal with enough detail for a reviewer to understand what future requests will inherit.

  1. Enter a Short description that distinguishes the approved activity from similar work.
  2. Choose Category so the published item appears in the intended catalog grouping.
  3. Review Assignment Group, Assigned to, and Configuration item. Populate them where they accurately represent the reusable procedure.
  4. Add Sample Change Requests that support the proposed repeatable scope.
  5. Set Change Request values for the fixed part of the work. Available fields depend on the catalog properties.
  6. Select Save. The proposal is created in New status.

You can also start from Change > Open, select an existing change, and use Propose a Standard Change Template from its form context menu. Associated change tasks are copied into the proposal, with copied change and task fields governed by Standard Change Properties.

Inspect inherited values before proceeding. Copying a successful record can also carry details that belonged to that execution alone. Review those details against the proposed reusable scope. The distinction between change models and standard change templates helps keep the workflow separate from the values each template supplies.

Add task templates and execution attachments before review

Creating a standard change task template requires itil, change_manager, or sn_change_write. Navigate to All > Change > Standard Change > Open Proposals and open a proposal in New state. Task templates can be added while the proposal is New; submitting it for approval closes that opportunity.

Open Change Task Templates and select New. Enter a unique Name, verify Std change proposal, set Order, and supply Short description and Change Task values. Select Submit. Order controls the sequence in which tasks are created in the resulting change request; do not treat that field alone as evidence of execution dependencies.

For attachment handling, the required role is itil or admin. Open All > Change > Standard Change > My Proposals, select the proposal, and use Manage Attachments. Select the files, then Update. Files attached to the proposal transfer to the approved template and from that template to the change requests it creates.

Review attachments as part of the approved procedure. A file should support execution or validation rather than leave the technician guessing which instructions apply. Remove execution-specific material from the proposed reusable package before review. Standard change catalog templates are not supported on Service Portal.

Request approval and confirm catalog publication

After the proposal, tasks, and attachments are ready, select Request Approval. The proposal moves to In Progress while the Change Management team reviews it. The default proposal workflow creates approval records for members of the Change Management group.

Approval publishes the template to the Standard Change Catalog and makes it available for creating standard change requests. Rejection returns the proposal to New for modification. Check the outcome before announcing availability: saving a proposal and submitting it for review are earlier steps than publication.

Review the whole execution package before release. The request generated later bypasses change approval, so reviewers need to understand the fixed instructions, editable inputs, tasks, and attachments together. If the catalog rules need broader configuration work, see ServiceNow implementation.

Test the published item as a requester

Creating a standard change request from the catalog requires itil, admin, or sn_change_write. Navigate to All > Change > Standard Change > Standard Change Catalog, choose the relevant category, and select a template in Items. The resulting Change Request form contains the template values.

Complete the remaining information, use Save from the form context menu, complete applicable related lists, and select Update. Check the generated request against the approved proposal:

  • Are the fixed change values present and protected where intended?
  • Can the requester provide the execution-specific information?
  • Were the expected tasks created with their intended values and order?
  • Did the approved attachments reach the request?

The Two step property provides a review stage between selecting a template and submitting the request. Include that behavior in acceptance testing. Before rollout, record the proposal reviewed, the item selected, and the resulting request so the test has a clear trail. Choose a test case that exercises both fixed values and requester inputs. A request that looks complete at first glance may still be missing the task detail the technician needs. If the results diverge from the proposal, use the change enablement troubleshooting guide to structure the investigation before wider use.

Questions about template rollout decisions

Should one proposal include several similar maintenance activities?

Prefer a narrower proposal when activities need different instructions or stop conditions. A reviewer should be able to explain the approved scope without deciding which parts apply to each execution. Shared wording is not enough reason to combine them.

Who should own the first operational acceptance test?

As a rollout practice, pair someone who understands the approved procedure with someone who normally requests the work. Together they can assess technical accuracy and whether the item is understandable from the catalog.

What should be recorded when the first test fails?

Record the selected template, the unexpected value or missing component, and the expected result. Distinguish a request field problem from a task or attachment problem so the correction can be checked against the same acceptance case.

Does the Standard change model need a separate approval setup?

The Standard change model has no availability, approval, or automatic task settings. Its configuration requires sn_itsm_chg_admin.change_models_config, sn_itsm_chg_admin.admin, or admin. Review Templates that use this change model in its New section and select Save after configuration.

Which repeatable ServiceNow changes can skip individual CAB authorization, and what conditions must a standard-change template meet to keep that status?

As of November 2026, ServiceNow lets a standard change skip individual CAB authorization only when it is pre-authorized, low risk, relatively common, run through a specified procedure, and backed by a proven history of success. In practice, a template keeps that status only while it stays in scope and has a named owner.

Test each candidate against four conditions before proposing it

A candidate qualifies only when all four conditions below hold, alongside the pre-authorization the template receives on approval. Miss any one, and the change goes through normal approval however routine it looks.

  1. Low risk on its worst realistic outcome. Judge the change by what a bad run could do to the service, not by how it usually goes. A task that is routine most of the time but can interrupt a core service on a bad day does not qualify.
  2. Repeatable in the same form. The steps, the validation and the class of item affected stay constant across runs. Only named inputs, such as the host or the configuration item, should change.
  3. A written procedure a new technician can follow. Someone who has never performed the work should reach the same result by following the instructions alone.
  4. A record of successful runs. Review the same activity over several recent cycles, including rollbacks and failed validations, not only the runs that closed cleanly.

Keep the status with ongoing ownership and review

Pre-authorization depends on ownership and control conditions that someone has to keep in place for each template. For each template, four things need to stay up to date:

  • A named owner accountable for the procedure and for deciding what falls inside scope when a requester raises an edge case.
  • A version number on the procedure, so any run can be traced to the exact instructions it followed.
  • A review date set by the owner, after which the template is re-examined rather than assumed to still hold.
  • Suspension criteria written in advance, such as a failed validation, a change to the platform or service the template touches, or a rollback caused by the procedure itself.

Recognize when a change has left standard territory

The common failure is drift. A team adds a step to the template, widens the eligible equipment, or works around a blocked validation, and the run still carries the standard label. The fix is to stop the fast path for that scope, route the change through normal approval, and only then decide whether the procedure earns a new version. The label should follow the procedure, not the other way around.

Understand what the bypass does not remove

Skipping individual authorization removes a meeting step, not a control. Testing, a complete record of what ran, and an owner who reviews outcomes still apply to every eligible execution. When CAB no longer approves each standard change, its time should go to material risk, conflicting changes and exceptions. A template that keeps generating exceptions is a reason to suspend it, not a reason to add another approver.