A scheduled report in ServiceNow runs a saved report on a defined timetable and sends its output by email. Configure the report, recipients, delivery format, and timing, then check the execution user and date boundaries. Validate both the generated results and recipient delivery before relying on the schedule for recurring decisions.
Prepare a scheduled report in ServiceNow
Start with a saved report whose filters and output already answer the recipient’s question. Agree on the reporting period, who needs the results, and whether they need a chart to read or rows to work with. A recurring email can distribute an incorrect filter just as reliably as a correct one.
The steps here cover Core UI report scheduling. On instances migrated to Platform Analytics experience, and on new Brazil instances, use the corresponding visualization or dashboard export workflow. Check your instance and release before following the navigation below.
Creating a Core UI scheduled email requires report_scheduler, report_admin, or admin. Navigate to All > Platform Analytics experience > Schedules > Scheduled Reports, then select New. Enter a recognizable Name and choose the saved report in Report. The Application field identifies its application scope; Global indicates the global scope.
Check the report type before configuring delivery. Calendar, Map, and Single Score reports cannot be scheduled through this workflow. Pivot Table scheduling requires the com.snc.whtp plugin, and multilevel pivot delivery uses PDF. If the visualization itself needs changing, review Core UI report types before building its schedule.
Choose recipients and an output they can use
Use Users for individual instance users and Groups for group recipients. A user’s Notification setting must be Enabled on their user record to receive scheduled reports. Email addresses accepts a comma-separated recipient list for people who are not instance users. Check that the selected audience is authorized to receive the exported data before enabling delivery.
Choose Type around the reader’s next action. A chart for a meeting and a list for further analysis need different outputs. Check a representative export with realistic data rather than judging the format from a small preview.
- Use PNG or PDF for graphical reports. PDF or PDF-landscape includes chart grid data.
- For a List report, choose Excel or CSV when recipients need rows to analyze.
- Choose Embedded PNG to place the visualization inside the email. Large images are scaled to fit.
- Select Zip output when the report should arrive as a compressed attachment.
Write a Subject that identifies the business question and reporting period. Add context through Introductory message, such as what the reader should review or act on. Include with lets you add other reports to the same email, but their order cannot be configured. Keep the collection focused enough that a recipient can tell which result needs attention.
If the reader needs ongoing access to a report rather than an emailed result, consider the separate report publishing workflow. Decide which access pattern fits the task before maintaining both.
Set the cadence and distinguish the two time zones
Use Run to choose the recurrence. Daily, Weekly, and Monthly provide calendar-based schedules. Weekly and Monthly expose Day for the weekday or day of the month. Periodically uses Repeat Interval for an elapsed duration. Once supports a single occurrence, while On Demand runs when requested.
Set Time on the 24-hour clock and choose its Time zone deliberately. In the Core UI scheduling form, -None- uses the default time zone of the logged-in user creating the job. Use System Time Zone uses the instance default. Selecting a named zone makes the intended regional clock explicit.
The clock controlling execution is separate from the time zone used to interpret relative query parameters. A filter such as incidents open today needs a definition of today. By default, that evaluation uses the time zone of the Run As user. A job can run at the expected hour and still select an unexpected reporting period.
- Open the relevant schedule through All > Reports > Scheduled Reports.
- Add Run as tz to the Scheduled Report form layout.
- Choose the schedule creator’s time zone or a specific time zone for resolving report parameters.
- If needed, add Run as [+] to expose a specific execution user.
- Save the selected values with Submit.
For acceptance, compare records near a date boundary against the intended business day. Record the execution clock and the query time zone separately in the handover. That gives the next administrator enough information to investigate a shifted daily total without changing the recurrence unnecessarily.
Validate execution, access, and email delivery
Review Active before expecting recurring delivery: active schedules deliver reports. Use Omit if no records when an empty result should suppress distribution. That choice needs agreement with the audience because silence could otherwise be mistaken for a delivery failure.
On a domain-separated instance, scheduled reports use the Run as user’s permissions. The creator is the default execution user, whose domain access and report_view ACL permissions apply to generation. An admin or report_admin can choose another Run as user; that user needs the appropriate report_view ACL permission. Treat this as a data access decision.
Compare the exported rows with the expected scope before widening the audience. Ask a recipient to check the subject, attachment readability, date range, and whether the content supports their decision. A completed configuration record does not demonstrate that the intended person received a usable report.
If nothing arrives, check whether the schedule is active, the selected user can receive notifications, and an empty report was deliberately omitted. Separate generation problems from email handling problems. The email handling troubleshooting guide provides the next investigation path when delivery needs attention.
For help planning this work, see ServiceNow implementation.
Handle DPM KPI emails as a separate schedule
Digital Portfolio Management has its own periodic KPI email configuration for solution owners. This action requires sn_dpm.dpm_admin. Navigate to All > Digital Portfolio Management > DPM Admin Center > Settings and select Email properties. Configure scheduled metrics email there and define the maximum recipient count per scheduled period.
Enabling those emails starts a default two-week cadence, with the first email two weeks after activation. To adjust timing, open Generate visualization attachments and configure its Run, Time zone, Time, and applicable recurrence fields. Then configure Email performance metrics for DPM managers. Schedule attachment generation at least two hours before the metrics email job.
Execute Now is available in these job configurations. Check the attachment job and email job together when validating a changed cadence. Moving the email earlier without moving generation can undermine the intended preparation window. Separately, the email-button toggle controls whether Send email appears on the Enterprise portfolio page; distinguish that visibility choice from enabling periodic metrics emails.
Review delivery after migrating Core UI schedules
Migration changes where the schedule is maintained. A report_admin or report_scheduler can open sysauto_report.list, select records in Scheduled Email of Reports, and choose Migrate Scheduled Report from Action on selected rows. The underlying reports move to the Platform Analytics library, and the original scheduled report receives Active=False.
Use the completion banner to inspect the migrated reports in the Scheduled exports library, then edit the export as needed. Treat recipient selection, recurrence, and output review as acceptance work before relying on the replacement. Keep a record of which original schedule corresponds to which export so later support work starts in the right location.
Questions about scheduled report delivery edge cases
What happens if the report creator’s account is deactivated?
Data may be missing from reports created by a deactivated user. Have an active user recreate the scheduled report, then check its results. Include schedule ownership in account retirement reviews so a departed employee does not leave an unexplained reporting gap.
Can a calendar-driven schedule run if its entries are all in the past?
A business calendar with all spans in the past is an invalid scheduling configuration and the job will not run. Inspect the calendar’s future entries when a calendar-driven recurrence stops producing reports.
Why might an Oracle database instance fail to generate scheduled emails?
On Oracle DB instances, scheduled emails are not generated when the report’s combined filter conditions exceed 4,000 characters. Investigate filter length when that specific combination applies, rather than assuming the recipient list is the cause.
Can migrated schedules move to production through update sets?
Update sets cannot move the migrated material from a non-production instance to production. Test migration in non-production, then use Migration Center functionality to perform the production migration. Keep production validation in the migration plan.
Can a conditional email script define its own functions?
Conditional scripts for scheduled emails run in the sandbox, where function definitions are not allowed and some APIs and keywords are restricted. Review a proposed condition against those restrictions before making report distribution depend on it.