Threat hunting in ServiceNow uses a case to turn a hypothesis into approved investigation scenarios, assigned hunt tasks, and reviewed findings. The Threat Hunting playbook guides that work through six stages. Analysts contribute evidence, while the case owner controls approvals and progression before the team records outcomes or escalates to a Security Incident.
Set up threat hunting in ServiceNow around a case
The Threat Hunting playbook operates on a Threat Intelligence Security Center case. Its stages are Intake, Triage, Scoping, Hunt, Review Outcomes, and Post Hunt. That sequence separates the question being investigated from the work assigned to analysts and the decision made after their findings are collected.
For a wider view of how this fits alongside response work, see the Security Operations overview. Keep this case focused on a specific behavior or observable rather than using it as a general collection of unrelated concerns.
These steps use the Brazil workflow; check availability and access on your instance and release. The playbook ships deactivated. An administrator with the admin role opens All > Workflow Studio, finds the Threat Hunting playbook under Playbooks, and selects Activate. The optional Test action accepts a case record for a test run.
Running the playbook requires sn_sec_tisc.analyst. For MITRE technique selection during Scoping, an administrator must also activate and run a MITRE data source so that the instance contains the relevant data. Treat these as readiness checks before assigning investigation work.
Start with a hypothesis that the owner can approve
Navigate to Workspaces > Threat Intelligence Security Center, select the Threat Analyst Workbench icon, and open Case Management > All Cases. Creating a case with Case Type set to Threat Hunting and Status set to Draft triggers the active playbook. A system work note records its initiation, and the case’s Playbooks tab shows execution details.
For an existing open case that does not meet those conditions, an analyst with sn_sec_tisc.analyst can choose Add Playbook, select Threat Hunting, and confirm. This starts Intake. Check the case before doing this: adding the playbook can repeat activities such as previously entered scenarios or associated MITRE techniques.
In Intake, use Description for the hypothesis, Assignment group for the responsible team, and Assigned to for the case owner. Navigate to Artifacts opens the area for linking entities. Update Case Details saves changes without leaving Intake; the owner’s Done action advances to Triage.
A useful hypothesis names the suspected behavior, the evidence to examine, and what would support or weaken the suspicion. For example, propose investigating whether a specific group of systems shares signs of the same adversary technique. Avoid writing the hypothesis as an established compromise before the investigation supports that conclusion.
During Triage, the owner chooses Approve Hypothesis to continue or Reject Hypothesis to cancel. Rejection sets the case status to Cancelled. Both decisions produce a work note. Other users with case access can contribute to the description but do not make the approval decision.
Convert approved scenarios into assigned hunt tasks
Scoping is where an investigation becomes work that analysts can carry out. First, Select relevant TTPs lets the team choose MITRE techniques available from executed data sources. Confirm adds the selected techniques with matrix and tactic metadata to the case description. Skip is available when the activity does not apply.
Next, use Provide Hunt Scenarios to describe the investigation scenarios and enter a Due date for the case. Users with case access can contribute scenarios. The case owner uses Approve Scenarios to proceed to task creation or Reject Scenarios to cancel the playbook and case.
In Create Hunt Tasks, New Hunt Task creates work for an approved scenario and assigns it to an analyst. Once tasks exist, the case owner selects Done to enter Hunt. Write task descriptions so that an analyst can explain what was examined and why the result matters to the scenario.
- Define the systems, entities, or observables within the investigation boundary.
- Identify the question each analyst should resolve rather than repeating the full case description.
- Agree how to report missing evidence, inconclusive results, and findings that warrant further attention.
Give each task a search boundary that another analyst can understand. Two empty results are difficult to compare if one analyst examined a different set of systems or observables from the other. In the task findings, distinguish a search that returned no relevant evidence from an investigation that could not examine the evidence it needed. For example, a task limited to one configuration item cannot settle a scenario covering several systems. Carry that limitation into the review so that the owner can decide whether the scenario has been answered or still needs investigation. These are task-writing choices for the team to agree before work begins.
For help planning this workflow, see ServiceNow implementation.
Use MITRE filters to investigate relationships
Link analysis supports the hunt by correlating security incidents, observables, and associated MITRE-ATT&CK information. This action requires sn_ti.mitre_analyst and sn_si.read. Incident records need their MITRE associations before those relationships can support the investigation.
Open All > Security Incidents > Show All Incidents and use Update Personalized List to add MITRE columns. Build filter conditions with the available MITRE fields, then select Run. Options cover adversary groups, data sources, malware procedures, tool procedures, tactics, and techniques.
The MITRE information is stored as a string, so these filter conditions use contains. For a system under investigation, combine its configuration item with a relevant technique ID to examine associated records. Broaden or narrow the conditions according to the scenario being tested.
Record why a match matters to the hypothesis. A shared technique can guide investigation, but the analyst still needs to explain the relationship rather than treating the filter result as a completed conclusion. Include the scope of the search when recording an absence of matches.
If the question concerns how incident evidence enters the response process, the SIEM event ingestion guide covers that neighboring workflow. Keep data ingestion work distinct from the investigation decisions captured in the hunt case.
Review findings before creating follow-up work
During Hunt, analysts update findings on individual hunt tasks. Those updates feed the aggregated Provide Hunt findings field. Summary of case tasks groups tasks by state, giving the owner a way to assess progress alongside the evidence itself.
Update Case Details saves ongoing contributions without leaving Hunt. The case owner’s Complete Hunt action advances to Review Outcomes. Before selecting it, compare each scenario against the task findings and identify any open question that would change the conclusion. Use the task-state summary to locate unfinished work, then read the findings to establish what the investigation actually resolved. A completed task and an answered scenario are different review questions: the analyst may have finished the assigned search while leaving the wider hypothesis uncertain. Where that happens, explain the remaining uncertainty before moving to Review Outcomes. This gives the owner a reason for the transition that the next reader can follow without reconstructing every task.
Review Outcomes includes Notes, Recommendations or Actions, and Closure Summary. Aggregated Analysis and Findings is read-only in this stage. The owner uses Confirm Outcomes to advance to Post Hunt.
The distinction matters: approved scenarios become hunt tasks during Scoping; findings then support recommendations and possible escalation. Use Recommendations or Actions to record the next steps arising from the hunt. For a useful handoff, name the proposed action, the team expected to consider it, and the findings that explain why it matters. Confirm on the instance whether any separate follow-up record is created; keep that check distinct from recording the recommendation.
In Post Hunt, Create Security Incident can escalate findings through a modal, and the resulting incident is linked to the case automatically. Check the user’s create access on the Security Incident table: without it, Create Security Incident is hidden. Also verify write access for this action and test its availability for the intended user on the instance. Treat visibility and successful execution as separate checks before relying on this escalation route. View Case Reports opens Case Reports for report creation, and Complete Playbook finalizes execution.
When recommendations involve vulnerability work, use the Vulnerability Response guide to plan that follow-up separately. Preserve the hunt conclusion even when another team must investigate or remediate the underlying issue. Check whether the receiving team can identify the affected entity, understand the evidence, and state its next decision without asking the hunt analyst to reconstruct the investigation.
Case history and execution controls shape the next hunt
Can a completed hunt playbook run again on the same case?
A completed execution cannot be initiated again on that case. A canceled execution can have the playbook added again. Before planning another investigation, distinguish an unfinished canceled hunt from a completed case history.
Can MITRE conditions work alongside existing incident filters?
Yes. Combine MITRE conditions with the existing Security Incident Response filters when investigating relationships. You can retain the incident criteria that define your investigation and add the MITRE dimension, rather than replacing the incident filter with a technique search alone.
Can the owner monitor a hunt while viewing other case tabs?
The Playbook card in the right-side context menu shows playbook status while the user works elsewhere on the case. It also provides a way to cancel the playbook during execution.
Should analysts duplicate playbook activities manually?
Manual activity during execution can conflict with or duplicate work on the case. Before adding parallel entries, check whether an active playbook activity already captures the same information and coordinate the change with the owner.