OBLYTECH Logo
OBLYTECH Logo

Campus Facilities Space Management

For campus space management in ServiceNow, establish where each physical space belongs, then check its occupants, equipment, and intended use. Facilities Space Management holds location and occupancy details; workplace reservations and neighborhood assignments use separate workflows. A facilities record alone does not complete booking. These facilities steps apply to existing deployments.

New customers cannot obtain the Facilities Space Management feature. Before planning the facilities work below, check that it is available on your instance.

Plan space management around the campus hierarchy

Start with one building and a floor whose layout the facilities team can verify. Spaces sit within floors or levels and can represent cubicles, conference rooms, restrooms, gymnasiums, elevators, or parking spaces. Decide which physical locations need separate records before entering them. This gives reviewers something concrete to compare with the layout.

Keep the facilities hierarchy, reservable workplace inventory, and neighborhood assignments as separate review items. Each answers a different operational question. Recommend naming a maintainer for each record set and recording how the same physical location is identified across them. Do not assume that similarly named records have already been reconciled.

The facilities instructions here concern Yokohama; the reservation, mobile search, and task instructions concern Brazil. Check the corresponding application and controls before using a procedure. For equipment lifecycle decisions alongside campus locations, use the hardware asset management guide. Keep that equipment work distinct from deciding which floor contains a space.

Check the facilities form before assigning occupants

The facilities add-or-edit procedure requires admin. Open All > Facilities > Space Management > Space. For a new record, choose New, then select a space type on the Facility Space interceptor. When changing an existing location, verify the record identity before editing its values.

Enter a descriptive Name and select the Building and Floor. Those three entries produce the Display name. Review the combined label, particularly where several buildings reuse room numbers. A useful acceptance check is to ask a facilities colleague to identify the physical location from the displayed name without additional explanation.

Set Area together with Area unit, using square feet or square meters. Keep the unit consistent across all spaces because area rollups depend on that consistency. As a practical review step, compare a sample of entered areas with the team’s agreed floor information before loading the remaining records.

The form’s Department field references departments maintained in User Administration. Cost center references cost-center records and requires cost management activation. Use Associated Departments for spaces shared across departments. Give each department a weight for its share; business rules convert the relative weights into ownership percentages totaling 100%. This supports departmental cost allocation and reporting. Review the resulting split alongside the form’s single department reference rather than treating that field as the complete allocation.

Choose a Status of active, planned, maintenance, or retired to represent the intended lifecycle state. Select Occupiable when people can occupy the space. That checkbox controls the dependent Availability, Current occupancy, Max occupancy, and Percent occupied fields. A space’s lifecycle status and its occupancy information answer different questions.

Availability offers vacant, partially occupied, at capacity, over capacity, and reserved. Set Max occupancy to the agreed user capacity. Adding an associated user triggers updates to current occupancy and availability, together with a recalculation of percent occupied. Use Associated Users and Assets to inspect or add those relationships. Save a new record with Submit or changes with Update.

Recommend checking the user and asset lists against the intended occupants and equipment before approving the record. A plausible capacity value does not verify those associations. If an equipment relationship raises a separate question about configuration data, the hardware asset management and CMDB comparison helps frame that investigation.

Configure booking and test employee discovery

Workplace reservation setup requires sn_wsd_core.admin, organizational workplace data, and identified workspaces that can be made available. In All > Workplace Reservation Management > Administration > Workplace spaces, choose New, complete the form, and select Submit. The resulting workplace space is available for reservation. Treat this as a reservation configuration step rather than a facilities-form update.

For mobile discovery, the user needs sn_wsd_core.workplace_user and AI Search must be installed and configured for Workplace Service Delivery for Mobile. Search from the welcome page for a campus, building, or space. Opening a campus provides See spaces; choose a floor, select a space, then use Submit to reserve it.

Recommend testing this route with a representative workplace user. Check whether the campus, floor, and space labels identify the expected destination. If directions are part of the test, the workplace needs a floor map and a configured Indoor Mapping or Mappedin provider in Map Properties for Get Directions to appear.

AI Search also handles misspelled search terms and searches for synonyms. Its suggestions can reflect recent browsing and popular searches. Recommend testing both a precise space name and a building search, then checking which floors appear. This tests discovery beyond a single known record without assuming that every employee will enter the same phrase.

Review assignments before replacing neighborhood spaces

A Space Assignment workplace task assigns spaces to a neighborhood. Verify the Neighborhood and Workplace task sub type before reviewing the record selection. Append extends the existing collection. Remove all and replace removes the neighborhood’s existing spaces and assigns the newly selected collection. Recommend reviewing the intended final collection before choosing replacement.

The Table selection determines whether the task uses meeting rooms from Room [sn_wsd_core_room] or workspaces from Space [sn_wsd_core_space]. The Filter selects records from that table. For a campus with repeated names, compare the selection with the intended building and floor before proceeding; a recognizable room name alone is a weak review criterion.

An onboarding office request uses an HR task. With sn_hr_core.basic or sn_hr_core.case_writer, open the HR case, select Add Task under Related Links, and choose HR Task. Set Location to the new hire’s building and choose a suitable template. Select Office/Desk Space is the supplied model.

The model supplies Submit Catalog Item as HR Task Type and Select Office Space as Catalog Item. Review the due date, assignment group, and assigned agent; template assignment values can be overridden. Finish using Submit or Ready for Work. Recommend agreeing who checks the requested location before the handoff.

The HR template also supplies a short description that can be overwritten. Recommend making that description specific enough for the receiving agent to distinguish the request from another office allocation in the same building. If the assignment fields are blank, select an assignment group and an HR agent rather than leaving responsibility unresolved.

For help with implementation planning, see ServiceNow implementation.

Reconcile relationships before facilities migration

Migration to the new space definition supports continued use of image-based floor plans and requires facilities_admin. Its standard behavior transfers complete location data. A missing building connection or a space outside the required location hierarchy leaves records outside that migration. Recommend resolving those exceptions before treating migration as complete.

The migration moves cmn_building records to alm_building, fpv_floor to fm_level, and fpv_element to fm_space. Use these pairs when reconciling the old and new inventories. Compare representative parent and child relationships as well as totals, because an overall count does not show whether a particular space belongs to the intended floor.

Run the action through All > Facilities > Administration > Migrate and select Migrate. Migrated legacy objects receive a flag that prevents another migration under the standard behavior. Editing the migration script include or resetting original-object flags can change that behavior. Review those modifications before relying on repeat runs to avoid duplicates.

For migration acceptance, recommend selecting one complete building-to-floor-to-space chain and one known incomplete chain from the preparation list. Check their outcomes separately. This makes the standard completeness rule visible to reviewers and helps distinguish an expected exclusion from a record that requires further investigation.

Recommend retaining a review list of migrated locations and unresolved hierarchy exceptions. Keep any related asset configuration investigation separate, using the hardware asset management setup guide where that work is needed.

Review dependencies before deleting a location

A containing space cannot be deleted while it still contains associated spaces. Review those child records first. The deletion route is All > Facilities > Space Management > Space: open the intended space and choose Delete. Check the complete location identity before taking that action.

Associated assets or another space relationship can produce a warning. Confirming Delete can delete the associated asset or space. Recommend reviewing every affected relationship before confirming, with explicit agreement on which records should remain. If the location still needs a lifecycle record, review whether the available retired status represents the intended outcome.

Questions about shared occupancy and floor-map changes

Can an employee have spaces on more than one campus?

Yes. A user can have several location assignments, including a space at each campus they visit. One assignment can be primary; a business rule prevents multiple primary locations for the same employee. For a traveling employee, review the primary designation separately from the additional campus assignments.

What happens to availability when an occupant becomes inactive?

An associated user’s inactive state makes space available. When reviewing a vacancy after an employee leaves, include the user’s active status in the investigation. The relationship between employee status and available space matters even when nobody has deliberately changed the space’s capacity.

Can a new floor map preserve existing location names?

Yes. Parsing properties under Space Management > Map Configuration > Properties govern preservation of existing values when a GeoJSON map is parsed. Preserved values include building names, level names and abbreviations, the main-level flag, and space names and internal names. Review that preservation choice before importing a map with revised labels.

Must parsing a map overwrite the recorded area?

No. Area parsing has choices to retain an existing area greater than 0.0001, overwrite it from the area file, or ignore area files in the map set. Area rollups still run after parsing regardless of those choices. Choose the behavior according to whether the existing space measurements or the incoming area file should control the result.