OBLYTECH Logo
OBLYTECH Logo

Configure the action level for anomaly detection

To configure the action level for anomaly detection, create a Metric Intelligence configuration settings rule for the required CIs and metrics, then override anomaly_detection_action_level. Choose the processing stage you need, synchronize the Metric Intelligence MID Servers, and verify that the selected series produce the expected bounds, scores, or alerts.

Choose the processing outcome before creating the rule

The action level controls how far a metric series travels through anomaly processing. It lets you collect data across a wider scope while reserving analysis and alert creation for selected CI and metric pairs. This supports a gradual rollout when the team needs to manage processing load or review results before introducing operational alerts.

There are five choices. Each higher choice adds processing to the preceding level:

  • Metrics Only: gathers metric data from its source without additional anomaly processing.
  • Bounds: adds statistical modeling and makes bounds available in Insights Explorer.
  • Anomaly Scores: adds the calculation and display of anomaly scores.
  • Anomaly Alerts: adds anomaly alert creation when applicable.
  • IT Alerts: adds IT alert creation based on anomaly alerts when applicable.

Start with the output the monitoring owner needs. For example, choose Bounds when the immediate task is reviewing the model’s expected range. Choose Anomaly Scores when reviewers also need an indication of anomalous behavior. Move toward alert creation when someone is ready to evaluate and act on those alerts.

The wider relationship between metric series, analysis, and monitoring is covered in ITOM anomaly detection and Metric Intelligence. Keep the decision for this rule narrower: identify the series and the processing stage it should reach.

Configure the action level for anomaly detection

Creating a configuration settings rule requires evt_mgmt_admin. The sequence below uses the Brazil controls; check their availability on your instance and release before making the change.

  1. Navigate to All > Event Management > Anomaly Detection > Metric Config Rules.
  2. On the Metric Configuration Rules pane, select New. Enter a Name that identifies the intended scope and processing outcome.
  3. Set Order to express the rule’s priority. Higher numbers represent higher priorities.
  4. Select Filter by to expose Rule and define the conditions for the intended CI and metric population. Leaving Filter by clear makes the rule global across CIs in Metric To CI Mapping [sa_metric_map].
  5. Right-click the form title and select Save.
  6. In Metric overridden configurations, select New. Set Name to anomaly_detection_action_level and check that Rule identifies the rule you just saved.
  7. Set Value to the required action level, then select Submit.
  8. Arrange synchronization of the Metric Intelligence MID Servers with the updated rules, then inspect results for the selected series.

Configuration settings have predefined defaults, types, and permitted values. Use the rule to override the setting rather than attempting to change the base configuration setting itself. The setting details available from the Name field help you inspect its valid choices before submitting the override.

A review that checks the value without checking the filter can miss a larger change: the intended action level may be correct while the affected population is wrong.

Overlapping rules are resolved by filter, priority and creation order

The action-level setting has CI/Metric scope. Define the population as precisely as the rollout requires, and inspect the matching series before extending it. A rule meant for a server class should not become a global rollout because Filter by was left clear.

Rule precedence also matters. A filtered rule takes precedence over a global rule without a filter. Among overlapping rules with different priorities, the higher priority applies. When overlapping rules have equal priority, the latest rule defined applies.

Consider a broad baseline and a smaller evaluation group. You might retain a lower processing level for the broad population and apply Anomaly Scores to selected series. Before saving the narrower rule, check whether another filtered rule already affects those series and whether its Order would win. Write down the expected winning rule so validation has a specific result to check.

For troubleshooting, compare an affected series with a similar series outside the filter. The comparison helps separate a scope problem from a wider collection or processing problem. Treat this as a review technique: it does not replace inspecting the actual matching rules.

Synchronize and validate the expected output

A saved rule must reach the Metric Intelligence MID Servers before it takes effect. Updated rules can be applied through a manual synchronization operation, or through the hourly system job. Account for that synchronization step before deciding that a saved change has failed.

Validate against the selected processing stage. For Metrics Only, check collection rather than expecting calculated scores. For Bounds, inspect the model and bounds in Insights Explorer. For Anomaly Scores, inspect score output as well. At the alert levels, investigate applicable anomaly and IT alert creation after checking the preceding analysis stages.

An alert level permits the corresponding alert processing; it does not promise an alert for an ordinary data point. Distinguish a missing processing capability from a series that has not produced a qualifying anomaly. Check the CI and metric identity, winning rule, synchronization, and available analysis before changing another setting.

Keep an acceptance record with the rule’s scope, priority and value, the selected series, observation period, expected stage, and observed output. This makes it easier to assess a later expansion without relying on recollection. Broader monitoring decisions belong in the ServiceNow AIOps hub.

Use model testing to review a selected population

Anomaly model testing provides a separate way to inspect analysis for chosen metric series before enabling production anomaly detection for them. Creating and running an anomaly test rule requires evt_mgmt_user. Navigate to All > Event Management > Anomaly Detection > Anomaly Model Testing and select New or an existing test rule.

Use Applies to with Metric To CI Mapping [sa_metric_map], and define Rule to select the CI and metric pairs. A test supports up to 20 series; if the conditions return more pairs, the selection is truncated to 20. Check the population rather than assuming that a broad filter tests its full result.

Choose a test period within the past seven days and select Run Anomaly Test. Status progresses from Scheduled toward Complete, while URL and Notes are updated during execution. When the run completes, open URL to inspect the results in Insights Explorer.

Test bounds and charts use faint colors, and test bounds use a different line pattern from actual anomaly detection results. Use Chart Settings to compare Show Bounds and Show Anomaly Scores in the test and actual statistics sections. Similar results can overlap visually, so inspect the selected display settings before interpreting an apparent match.

For help organizing the configuration work, see ServiceNow implementation.

Expand processing without mixing tuning decisions

Increase the evaluated population when its output supports the next monitoring decision. A sensible review sequence is to establish collection, inspect bounds, examine scores, and assess alert behavior. This sequence is a rollout recommendation, rather than a requirement to create a separate rule at each stage.

Keep action-level selection separate from severity mapping. Metric Intelligence anomaly scores range from 0 to 10, and score ranges map to event severities. Changing a severity range changes how scores are classified; it does not add processing stages to a lower action level.

Editing score-to-severity thresholds requires evt_mgmt_admin. The controls are under All > Event Management > Anomaly Detection > Anomaly Score to Severity Mapping. Review those mappings when classification needs adjustment, while keeping the action-level review focused on the processing outcome. Further downstream work can be planned through AIOps automation opportunities.

Four edge cases change how the action level behaves

What happens to anomaly_detection_enabled when an action level is set?

When anomaly_detection_action_level is set, anomaly_detection_enabled is ignored. Check the action-level configuration when a change to anomaly_detection_enabled does not produce the expected result.

Do new and upgraded records start with the same action level?

The defaults differ: new records use Bounds, while upgraded records use Anomaly Alerts. Inspect the applicable record and overrides before using the starting value as the basis for a rollout plan.

Does a rule’s filter constrain settings that have Global scope?

The metric configuration rule’s filter does not apply to configuration settings with Global scope. Review each setting’s scope before adding another override to an existing filtered rule.

Can an administrator add a new base configuration setting?

The base configuration settings cannot be added to or directly modified through this mechanism. Configuration rules supply override values for existing settings. Select the existing action-level setting rather than creating a substitute name.