OBLYTECH Logo
OBLYTECH Logo

Accept a live chat from a requester

To accept a live chat from a requester in Service Operations Workspace, set your status to Available before any chat arrives. When the requester starts a live chat, the incident is created automatically and waits in your Inbox. Select Accept to open the chat and work the incident alongside it. Update its short description, save it, and continue the conversation.

Prepare to accept a live chat from a requester

Agents need the service desk agent role in Service Operations Workspace to manage incidents. An administrator assigns it from the Service Operations Workspace Admin Center under Initial setup. A requester must first start a live chat with a support agent, for example from the chat option in Employee Center. Setting yourself available prepares you to receive work; it does not replace the requester’s initial contact.

Use this sequence for the Simplified IT Service Management experience in Service Operations Workspace. Check the experience on your instance and release before using it as an agent checklist. Other chat entry points and older routing arrangements can look different, so establish which experience your team operates before troubleshooting missing controls.

  1. Open Service Operations Workspace and select the Inbox icon in the sidebar. The icon appears after your administrator installs the Live Agent integration plugin, com.glide.interaction.awa.
  2. Set your status to Available. By default agents start Offline.
  3. When the incoming chat appears, select Accept.

For the broader record lifecycle after intake, use the incident management hub. This acceptance flow is the point at which a conversation becomes incident work, so the agent needs to keep both the requester’s conversation and the incident record in view.

Check the incident created from the requester’s chat

A live chat from a requester creates an incident automatically in your Inbox. For the incoming chat procedure, selecting Accept opens the resulting incident view. After the agent accepts the chat, the Inbox is hidden, allowing the agent to focus on resolving the incident. Check for that record before starting a separate manual incident; an additional record can leave the team discussing one issue across two places.

Keep the requester conversation and the incident form open together, so you can check the requester’s details and related records before you reply.

A sensible first review is to confirm that the displayed requester matches the person in the conversation, then inspect relevant incident and asset context before asking them to repeat information. Treat this as a review step rather than assuming that a linked incident describes the same problem. Similar symptoms can belong to separate requests. Because the incident opened from the chat itself, record any mismatch on that incident rather than opening a second record.

For example, if the requester reports an application access problem, establish which application and what happens when they try to use it. Use the details already visible to focus the follow-up question. The aim is to turn the initial message into an incident description that another agent could understand without reconstructing the opening conversation.

Save the short description and continue the conversation

On the incident form, update the short description. Then use the Save menu option from the More Options button. Make the description specific enough to identify the reported issue, while keeping assumptions about its cause out of the wording until you have evidence.

Write the short description so it states the reported symptom. Write the reported symptom and relevant context clearly before relying on generated assistance to help with the next stage of investigation.

Use the incident details alongside the requester’s account of the issue. When a next step depends on missing information, ask for that information in the conversation before acting on it.

Record findings on the incident as the conversation proceeds. Return to the chat panel to send notes to the requester. Completing the incident and continuing the chat are separate steps.

A short working check is to compare the saved description with the requester’s latest explanation. If the conversation changes your understanding, revise the incident wording so the next person sees the current issue. This avoids leaving an accurate chat beside a misleading incident summary.

Choose chat actions that fit the next step

Use the quick actions in the chat panel to send response templates, search knowledge articles, or transfer the conversation. The options available depend on your configuration. A transfer should go to the agent or queue that can act on the request, so check the destination before you select it. Choose an action according to what the conversation needs next. The existence of an action does not by itself establish that it is the right response to the requester’s problem.

For a transfer, prepare a concise account of what the requester needs and what you have already checked. Review the incident description and record relevant findings before handing over. That preparation gives the receiving agent a clearer starting point and reduces the need for the requester to repeat the same opening explanation.

Where the conversation began with automation, the surrounding routing design matters to the handoff. The Virtual Agent handoff, chat queues, and surveys guide covers that neighboring part of the journey. Keep acceptance testing focused on whether the intended agent receives the request and can open its incident.

For help planning this work, see ServiceNow implementation.

Investigate a chat that becomes idle after acceptance

An accepted chat can become idle while the agent is gathering information. By default, Idle Chat Timer Task checks active live chats every two minutes. The reminder threshold is 180 seconds after the requester’s last response, and the cancellation threshold is 360 seconds. Consider the scheduled check cadence when assessing the timing you observe.

Changing idle-chat properties is an admin action. To inspect the reminder wording, navigate to All and enter sys_properties.list in the filter, then open com.glide.cs.idle_chat_reminder_message. Change its Value and select Update if a wording change is needed. Review the message separately from timeout values; changing the words does not change the timing thresholds.

To configure the thresholds, create both com.glide.cs.idle_chat_reminder_timeout and com.glide.cs.idle_chat_cancel_timeout in the System Property table. Use integer values measured in seconds. With the default scheduled-job cadence, the reminder value must be at least 120 seconds, and the cancellation value must exceed it by at least 120 seconds. Select Submit for each new property.

The property com.glide.cs.start_idle_timeout_after_agent_response changes when inactivity timing begins. With a true value, the timer waits for a non-automated agent response. An automated greeting therefore does not satisfy that condition. When investigating an unexpected timeout, check whether the agent actually sent a response, as well as checking the property value.

Idle live chat handling is unavailable for Connect Support. Connect Support is deprecated and unavailable for new activation starting in Utah; Advanced Work Assignment and Agent Chat provide the migration direction. Establish which chat technology is running before applying these settings. For a wider channel discussion, see the ServiceNow live chat guide.

Questions about requester entry and interrupted conversations

Can employees have separate queues for different departments?

Employee Center live chat can use multiple departmental queues, such as IT, HR, Payroll, or Facilities. An administrator can arrange the categories so that the requester’s choice routes toward the relevant queue. When reviewing intake, check the intended department as well as the agent’s availability.

What happens when Employee Center has no chat queues defined?

The Employee Center live chat defaults include Virtual Agent Support and, for HR Service Delivery, HR Department Chat Queue. If a requester reaches an unexpected destination, review whether a queue was actually defined rather than assuming the selected department has its own route.

Do live-chat pre-chat categories also apply to Virtual Agent?

No. The Employee Center pre-chat categories described for live chat do not apply when Virtual Agent is used with Employee Center. Keep those configurations separate during diagnosis so a change to live-chat survey choices is not treated as a Virtual Agent routing change.

Why can the pre-chat conversation appear without category data?

If the survey options are not defined, the pre-chat conversation appears without data. Ask the administrator to review the survey choices used for the categories. Capture what the requester saw before changing queue assignments, since an empty choice set and an incorrect destination are different observations.

Can a disconnected guest conversation resume?

The com.glide.cs.chat_disconnect_timeout property controls how long the system waits to reconnect a disconnected guest conversation before ending the chat. If communication returns within that interval, the conversation resumes. An admin can add the property as an integer value in seconds through sys_properties.list.