OBLYTECH Logo
OBLYTECH Logo

Adding an HR task to an HR case

To add an HR task to an HR case, open the case, select Add Task under Related Links, and choose HR Task. Complete the task fields, check its assignment, and save it. Set State to Ready or Work in Progress when the employee needs to see and act on it.

Start adding an HR task to an HR case

The task creation procedure requires sn_hr_core.basic or sn_hr_core.case_writer. Open the HR case that needs the additional work, then use Related Links and Add Task. Select HR Task for HR work. The alternative Facilities Request creates a facilities request, such as a request for desk or office space.

Check Parent before entering the details. It identifies the case receiving the task. Number is assigned automatically and cannot be changed. Recording the task number in your handoff notes can help another agent distinguish this work from other tasks on the same case.

Choose work with a clear completion outcome. For example, a request for supporting documents needs instructions about which documents the employee should provide. A request for information needs questions the employee can answer. Separate those outcomes when combining them would make responsibility or completion unclear.

Check each field label against your own instance before saving, because labels can differ between releases. For wider guidance on running HR cases, see HR case management best practices.

Check the template, location, and assignment

Select an HR Task template in Template when an appropriate one exists. It can fill fields including HR task type, Short description, and the assigned group or person. Review those populated values against the request rather than assuming that a familiar template fits the current employee’s situation.

Location identifies the employee’s location and determines the HR agent assigned to the task. In onboarding work involving an office or desk, it also determines the building map shown. A location check therefore belongs before the final assignment review, especially when the employee is joining a different office.

Assignment group is restricted to groups whose type is human_resources. If a group has not populated automatically, choose it to obtain the available users for Assigned to. An assigned HR agent must belong to the selected group. When changing the group, check that the assigned agent belongs to the new group.

Assigned to can also identify the case’s Subject person. That is relevant when the employee must sign or return a document. Decide who must perform the action before selecting the assignee: the employee providing information and the HR agent reviewing it have different responsibilities.

For a lifecycle event case, Stage identifies the activity set receiving an ad hoc task. Check that placement when adding work to an existing lifecycle sequence. If the same assignment problem keeps recurring, settle who decides the group and assignee before the next case is opened. An HR case management governance model can help record that decision.

Match the HR task type to the required action

HR task type determines how the employee responds or how the task is fulfilled. Choose it from the outcome you need, then complete the associated fields. A task that asks someone to provide evidence should not be described as a simple acknowledgment of information.

The most common HR task types are:

  • Collect Employee Input: choose the questionnaire in Employee form so the employee can supply or verify information.
  • Checklist: enter the required items in Checklist Items.
  • Upload Documents: explain the required documents in Short description. The task must be in Ready or Work in Progress.
  • Mark When Complete: the employee uses Completed on the HR Service Portal, which changes the task to Closed Complete.
  • E-signature: select the E-signature template for the document signing action.
  • Take Survey: select the survey in Survey.

Older instances may also show Sign Document, Credential and E-Signature. These are legacy options for customers that have not migrated to e-signature, so use E-signature for new work.

Other fulfillment choices include HR Service, Submit Catalog Item, and Submit Order Guide. Select the HR service, active catalog item, or order guide in its corresponding field. Bulk Parent Case is excluded from the HR Service selection because it serves parent cases for bulk requests.

Write Short description as an instruction the employee can understand without an agent translating it. It appears on the HR Service Portal and may initially come from the template. Description supports a longer explanation with rich text formatting that also appears in the employee-facing case or task description.

Set deadlines, reminders, and employee visibility

Due date specifies the completion date. With Set reminder selected, reminder notifications use the due date calculations. Reminder template selects the notification content; When to send (days) determines the lead time before the deadline, and Interval (days) determines the repeating interval. These values can also come from an HR Task Template.

Review the deadline together with the instruction. If you request several documents, give the employee enough context to identify the correct material before the due date. Keep the reminder message consistent with the actual action, particularly when adapting a template originally written for another task type.

A saved task does not become employee-visible merely because its fields are complete. State must be Ready or Work in Progress for the employee to see the created task. Save from the Content menu saves while leaving the Task form open. Submit saves and returns to the HR Case form. Ready for Work saves, sets Ready, and leaves the Task form open.

Optional allows the Subject person to skip the task using Skip on the Open Case page. They may also take no action while the HR agent closes the case complete. Decide whether the work is truly optional before enabling it; an instruction that describes mandatory evidence should not conflict with that choice.

When a task appears missing, inspect its State, Parent, and Assigned to before creating another one. This avoids duplicate work while you investigate visibility. See common HR case management mistakes for related handling risks.

Work the task and review related progress

You can find tasks through their parent HR case or through HR Case Management > HR Tasks. The Sibling Tasks tab lists tasks belonging to the same case; select a task number to inspect it. Use that view when another activity may explain why the case has not progressed.

Activity records employee responses and task activity by the employee and assigned HR agent. Additional comments (Customer visible) provides information visible to the Subject person. Work notes supports communication between HR agents and is not visible to the Subject person. Choose the field according to the intended audience before entering sensitive case detail.

For reusable messages in Agent Workspace for HR Case Management, sn_hr_core.case_writer is required. Open Lists, select HR tasks and Assigned to me, then open the task. In the contextual side panel, use Response templates and View response templates, select a template, use Copy to clipboard, paste into Comments/Worknotes, and select Post Comments. Post Comments makes the pasted text visible to the subject person under Comments/Worknotes, so read the template for employee-facing wording before you post it. Keep internal reasoning out of that text.

Response templates are filtered by the language set in the assigned user’s profile. An agent whose profile is set to French sees only French templates. Treat a reused message as a starting point for the specific request: check the action, timing, and references to attachments. For repeated manual work across cases, consider HR case management automation opportunities.

For help planning this work, see ServiceNow implementation.

Before handing the case to another agent, record which task needs attention and what response is still outstanding. A task number, a clear instruction, and a current work note give the receiving agent a concrete place to resume without reconstructing the request.

Questions about task changes and completion

How can I make a similar task without entering it again?

Use the Clone Task related link, enter the new task information, and select Update. Review the copied details against the new work before saving, particularly the instruction and assignment.

Where can I inspect employee questionnaire feedback?

View Responses displays feedback submitted through the employee form used by a Collect Employee Input task. Review the response before deciding whether follow-up work is needed.

Can I attach a document to the task?

Use the attachment icon at the top of the form. Task attachments are also available on the parent case, so consider the case context when deciding what to attach.

How do I cancel work that is no longer needed?

Select Cancel Task in the form header. Record enough context for the next agent to understand why the work stopped, rather than leaving an unexplained task in the case history.

What should I check before closing the parent case?

HR tasks must be closed before the parent case can close. To complete a task, enter relevant Work notes and change State to Closed Complete. The assigned case agent receives an email when all tasks are closed. Closing the parent case assigns child tasks Closed Incomplete, so review their outcomes before case closure.