Customize the Dispatcher Workspace contextual side panel in UI Builder by adjusting its Tabs component and the content nested inside those tabs. Use tab order, labels, and icons to organize the display, then check the fields against the selected task or agent. Test selections from the map, schedule, and task panel before rollout.
Plan the contextual side panel around dispatcher decisions
The panel follows what a dispatcher selects in the workspace. A selection on the map, schedule, or task panel supplies the context for the details displayed alongside the working area. That relationship should guide the design: a field earns its place when it helps the dispatcher decide what to do with the selected item.
Start with one concrete problem. Perhaps a dispatcher must open another record to answer a recurring question, or the needed information sits behind an unclear icon. Describe the expected improvement as an observable result. For example, the reviewer should identify the selected task and find the information needed for the next assignment decision without confusing it with another task.
Make a short inventory of current tabs, their icons, their order, and their contents. Against each proposed field, record the selected object it belongs to and the decision it supports.
For the broader design context, see UI Builder and workspaces. Check the editing controls and workspace structure on your instance and release before applying the sequence below.
Locate the existing panel before adding content
The role required for adding tabbed content in UI Builder is admin. Navigate to All > Now Experience Framework > UI Builder, open the experience that contains the Dispatcher Workspace page, and open the relevant page or page variant. Identify the contextual side panel in the content tree before making changes.
Inspect the existing Tabs component and its nested components. Tabs provide the panel’s navigation structure, including the order of information and the icons used to reach it. The components inside a tab provide its content. Selecting the outer tab and selecting a component inside it therefore lead to different editing work.
Use the current structure as your starting point. If the request concerns an existing information group, inspect that group before adding another tab. A second tab with overlapping content can make the panel harder to scan even when both tabs render correctly.
Write down which page or variant you opened and which component you intend to change. This makes a later review more precise than a screenshot alone. If page structure is unfamiliar, the explanation of a UI Builder page provides background for that inspection.
Change tab order, labels, and icons deliberately
Tabs can be reordered through the configuration panel. They also support custom labels and icons, with changes visible while editing. Decide on an order that reflects the dispatcher’s sequence of decisions: identify the selected item, inspect the relevant details, and then examine supporting information.
- Select the Tabs component that belongs to the contextual side panel.
- Review the tabs in the configuration panel and identify the information group being changed.
- Adjust the order to match the agreed navigation sequence.
- Review the tab label and icon together so they communicate the same purpose.
- Inspect the edited display and verify that the neighboring tabs remain understandable.
Icons are optional in the tab settings. Choose an icon because it helps distinguish a destination, rather than because the panel has room for another symbol. Keep the label specific enough that a dispatcher can predict the content before opening the tab.
Review similar icons next to one another. If reviewers confuse two destinations, revise the labels or simplify the navigation. A successful configuration should be understandable during a busy scheduling session, when a dispatcher has little reason to memorize a new visual vocabulary.
Add a tab and place fields in the right content
For a new static information group, the empty container tab gives you a place to add components manually. Work within the panel’s existing Tabs component when that is the intended destination. A second Tabs component elsewhere on the page typically adds another navigation area for the dispatcher to learn.
- Select + Add tab on the stage.
- Choose Start from an empty container and select Next.
- Enter the Tab label, choose an Icon if needed, and review Hide tab.
- Select Create, then select the new tab.
- Select the + icon and choose the component to place inside the tab.
Check the content tree after adding the component. Nested components appear beneath the tab that contains them. This is a direct way to catch content placed in the wrong information group before investigating its data.
For a field change, inspect the component that displays the value and how it receives the selected record’s information. Keep a distinction between a label describing a field and the value that the component displays. A clear label with an unrelated value is still a failed change.
Use a test record whose expected value you know. Compare the displayed result with that record, then select another record with a different value. Include a record with an empty value so the review covers missing information as well as populated fields. These checks reveal whether the new content follows the selection rather than merely looking correct in one example.
For help planning this work, see ServiceNow implementation.
Separate metrics settings from tab customization
Some panel requests involve workspace settings as well as UI Builder. Metrics are a relevant example. Changing the appearance of a tab does not establish whether the corresponding metrics option has been enabled.
For configuring Dispatcher Workspace settings, the listed roles are admin, wm_admin. Navigate to All > Field Service > Dispatcher Workspace Configuration > Workspace Settings. Enable group metrics setting makes the metrics option available for assignment groups; Enable agent metrics settings makes the agent metrics option available. Select Save after changing the settings.
Agent metrics appear in the contextual side panel, and group metrics appear in the schedule. Metrics show N/A until a task is assigned to the agent or assignment group, so assign a task before you judge a metric. Include this in a metrics review so an N/A value is not mistaken for a broken tab.
Keep the acceptance checks separate: confirm that the relevant metrics option is available, confirm the panel shows the intended section, and then assess the values using the appropriate selection sequence. This avoids redesigning navigation to solve a settings or refresh issue.
Metrics depend on assignment before they depend on layout. A tab can render correctly and still show little useful when no work has reached the agent or group yet, so the first question is whether anything has been assigned.
- Confirm that the group metrics setting is enabled if the review covers assignment groups.
- Confirm that the agent metrics setting is enabled if the review covers individual agents.
- Choose an agent who already holds an assigned task, since an agent with no work reads N/A.
- Look for agent metrics in the contextual side panel and group metrics in the schedule, because the two appear in different places.
Keep the tab layout and the metrics settings in separate change records, so a reviewer can tell which edit changed a result. When both change in one edit, a later failure is hard to attribute to either. Record which setting and which assignment you checked alongside the test selections, so another reviewer can reproduce the result.
Test selection changes and diagnose the first failure
Run the review from the dispatcher’s working surfaces. Select an item from the task panel, repeat from the schedule, and check a map selection. For each route, verify the identity of the selected item before judging the fields beneath it. Record which route fails if the results differ.
- If the tab is absent, inspect Hide tab and the intended page or variant.
- If the tab appears but the content does not, inspect the nested component’s position in the content tree.
- If a value belongs to the previous selection, investigate how the content receives the current selection.
- If the correct value is difficult to find, review the tab order and label before adding more content.
Change one suspected cause at a time and repeat the failing selection. A focused retest gives you evidence about the correction; changing labels, content, and data configuration together makes the result harder to explain. The guide to troubleshooting UI Builder and workspaces supports a broader investigation when the first checks do not resolve the issue.